ML20083G740

From kanterella
Jump to navigation Jump to search
Forwards Completed Facility Staffing Survey Per D Wagner 831206 Request
ML20083G740
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 12/19/1983
From: Mittl R
Public Service Enterprise Group
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8401060412
Download: ML20083G740 (7)


Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ _

0 PSEG

~

Public Service Electric and Ges Company 80 Park Plaz.T16D Newark, N.J. 07101 201/430-8217 Robert L. Mitti General Manager - Licensing and Environment December 19, 1983 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, MD 20014 Attention:

Mr. Alber t Schwencer, Chief Licensing Branch 2 Division of Licensing Gentlemen:

HOPE CREEK GENERATING STATION DOCKET NO. 50-354 FACILITY STAFFING SURVEY Pursuant to your request, made by Mr. Dave Wagner via telecopy December 6, 1983, we are forwarding the attached Facility Staf fing Survey which has been completed for the Hope Creek Generating Station.

Should you have any questions in this regard, do not hesitate to contact us.

Very truly yours,

<0J J f y~ /

g Attachment DO DO O

'l The Energy People

Director of 12/19/83 Nuclear Reactor Regulation CC:

D.

H. Wagner - w/e ncl.

USNRC Licensing Project Manager LJ23 01/02-A l

I l

l 1

t I

.. Lao re y.y < ep m; 9:ly 301 492

61" 2016212150::: 1

._EC c.

tFC-PHILLIPS tO. W 001

~

OUESTIONNAIRE FACILITY STAFFING SURVEY The attached survey has been prepared to assist in developint; the expected staffing profile for your facility that will be in 61 ace at the time yco are ready to obtain an operating license.

Flerse fill in the blanks with the best information available.

TELECOPY RESPONSE REQUESTED ON FRIDAY DEC. 9, FORMAL DOCUNENTgig [Tg BJ FR1 DE FACILITY STAFFING SURVEY Pl. ANT Hope Creek Generating Station Anticipated Licensing Date Jan. 1986 A.

OPERATING SHIFT 1.

No. of Shifts 5

2.

No. of R0s Assigned to Shift Work to No. of Yrs. of Commercial RO experience on BWR PWR Hot plants (post-initial criticality) o 6

3.

No. of SR0s Assigned to Shift Work to No. of Yrs of Comnercial 'R0 experience on BWR PWF.

Hot plants

-- q 5

1.8 )

No. of Yrs of Commercial SRO experience on BWR

>UR Hot plants lo 2.25 l

4 No. of SR0s with 4-yr degrees Non-encineering Engineering o

o S.

No. of Shift Supervisors (SS)

Non-eng:neering

. Engineering with 4 year degrees 0

0 Note:

SS is senior authority on shift work.

1

B.

ON-SITE MANAGEMENT Page 2 of 3 L

Fill in Table (Use Appropriate Titles)

Opera tions Assistant Maintenance Technical STA Manager Plant Mgr.

Plant Ngr.

Manager Manager I

l To have license at time of OL No Yes No j

No Not Assigned No I

l Previously licensed j

j I

U R0/SR0 0

SRO SRO No SRO Type Plant l

l pwn pwR pWR No. Years (Total) i 6

4 0

6 Na. Years "flot" Exp. (Total) 5 4

0 5

l I

Degreed 1

i i

1 1

2-Nuc.

Type (Discipline (s))

3-Mech.

E EE l,

ME EE l-Elec.

. _ _., _, _4 Level (A/8/M/D) 6-B B

B B

B I

Pag 3 3 Shost 1 of 3 CORPORATE fitJCLEAR EXPERifHCE (i.e., "DTf-Si te"Managemen t)

Yrs. at Other Operator Lic.

Yrs, at Huc. Support /

Degrees (if ever held) Oper. Nuc.

Management Level POSIT 10N' NAME NUC NAVY R0/SR0/None Stations Position (A/B/M/D)

Discipline (s)

(Yrs)

(On-Site)

(Off-5ite)

I (Indicate whether BWR.or PWR)

Vice Pres. -

Richard A.

O None O

7 (PWR)

B Science Nuclear Uderitz Gen'l Mgr. -

Henry J.

O SRO 14 (PWR)

O B

Electrical Engirtecring Nucl. Services Midura uc up ort tger 2 (QA)

N O

12 (WR B

Mechanic'al Engineering

.-E at Mgr. - Nucl.

Frederick O

None 3 (PWR) 4 (PWR)

B General Engineering Site Mainten.

Meyer 1 (BWR) yrs.

@ ucl. Nag O

H WM B

M us M al Enginee & g e Pr e t.

oe e i

J2 3 Ch:st 2 of 3

~

CORPORATE NUCLEAR EXPERIENCE (i.e., "Of f-Si te" Management)

Yrs. at Other Operator Lic.

Yrs. at HuC. Support /

Degrees (if ever held) Oper. Nuc.

Management Level POSITION NAME NUC NAVY R0/SR0/NOne Stations Position (A/B/M/0)

Discipline (s)

(Yrs)

(On-Site)

-(Off-5ite)

(Indicate whpther BWR.or PWR)

Mgr. -

Wayne L.

4 yrs.

RO O

3 (PWR)

M Nuclear Engineering Radiation Britz (Merch.

(for NS Savannah) 9 (NRC)

M Business Administ.ation Protect. Serv.

Marine)

Mgr. - Nucl.

Edwin A.

O SRO 3 (PWR) 16 (PWR)

B Marine Engineering Licensing &

Liden Regulation Mgr. - Nucl.

Elliot S.

O None 7 (BWR) 6 (PWR)

B Chemical Engineering Fuel Rosenfeld Mgr. - Nucl.

Charles P.

6 3/4 None 8 yrs.

3) (PWR)

B Industrial Engineering Operations Johnson yrs.

M Business Administration Qual. Assumoce Mgr. - Nucl.

Lawrence A.

O None 0

17 (PWR)

B Mechanical Engineering Systs. Engg.

Reiter M

Business, Administration i

Paga 3 Short 3 of 3 EORPORATE NUCLEAR EXPERIENCE

( i.e., "O f f-S i te" Management)

Yrs. at Other Operator Lic.

Yrs. at Huc. Support /

Degrees (if ever held) Oper. Nuc.

Management Level POSITION NAME NUC NAVY R0/SR0/None Stations' Position (A/8/M/D)

Discipline (s)

(Yrs)

(On-Site)

(Off-5ite)

(Indicate wh ather BWR.or PWR)

Mgr. - Nucl.

Robert L.

O None 2 (PWR) 12 (PWR)

B General Engineering Plant Engg.

Gura M

Management Sciences Mgr. - Nucl.

Timothy N.

O None 0

14 (PWR)

M Mechanical Engineering Engg. Control Taylor and Metallurgy Mgr. - Nucl.

Alexander 0

None 0

15 (PWR)

B General Engineering Engg. Design Thomson 12 (BWR)

I

.