Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures RTN-HB-00001 Re Reactor Coolant Drain Tank Operation & RTN-HB-00006 Re Laundry & Hot Shower Tank Subsystem Operation
ML20086J762
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/19/1983
From: Mayer M
UNION ELECTRIC CO.
To:
Shared Package
ML20086J753 List:
References
PROC-831219, NUDOCS 8401250077
Download: ML20086J762 (61)


Text

,.. - _ -.. _ _ - _ -..., -..,,

s DATE 12/16/83 PAGE 1

of 6

UNION ELECTRIC COMPANY CALLAWAY PLANT NORMAL OPERATING PROCEDURE INDEX RADWASTE Procedure Date Deficiency Resp.

Number Title Rev.

Issued Page Date Dept.

RTN-BM-00001 Steam Generator Blowdown 0

06/08/83 05/10/83 Radwaste System Operation RTN-BM-00002

. Blowdown Surge 1

12/07/83 Radwaste Tank Operation l

RTN-GH-00001 Radwaste Building 0

08/17/83 08/01/83 Radwaste l

Heating, Ventilation l

and Air Conditioning System Operation RTN-HA-00001 Gaseous Radwaste 0

10/05/83 Radwaste System Normal Operation RT(-HA-00002, Gaseous Radwaste 1

10/05/83 Radwaste System Shutdown Operation RTN-HA-00003 Operation of Gas-1 10/05/83 Radwaste Decay Tank Drain Collection Tank RTN-HA-00004 Purge Recycle 0

05/25/83 Radwaste Holdup Tank RTN-HA-00005 Switching Gas Decay 0

06/08/83 Radwaste Tanks RTN-HA-00006 Start Up of Gaseous 0

09/20/83 Radwaste Radwaste System RTN-HA-00007 Shut Down The 1

11/29/83 Radwaste Gaseous Radwaste System RTN-HA-00008 Operation of the 0

10/05/83 Radwaste Gas Analyzer Racks RTN-HB-00001 Reactor Coolant Drain 1

12/19/83 11/21/83 Radwaste Tank Operation RTN-HB-00002' Waste Holdup Tank 1

12/19/83 Radwaste Operation g

8401250077 B40118 PDR ADOCK 05000483 F

PDR

,.,,., y. m r...v- --,,..:

...,..,g,...e.

n,.

- :.,. -,. ~.-, ;, -.,:.,, ?.:.,.,

-.r:

.c ---

,, s e.

+.

1

~

DATE 12/16/83 PAGE 2

of 6

RADWASTE Procedure Date Deficiency Resp.

Number Title Rev.

Issued Page Date Dept.

RTN-HB-00003 Waste Evaporator 0

08/04/83 07/16/83 Radwaste Condensate Tank Operation RTN-HB-00004 Floor Drain Tanks 0

03/28/83 Radwaste Cperation RTN-HB-0000 5 Waste Monitor Tanks 1

11/29/83 Radwaste Operation RT9-HB-00006 Laundry & Hot Shower 1

12/19/83 Radwaste Tank Operation RTN-HB-00007 Laundry Water Storage Tank 1 12/19/83 Radwaste Operation RTN-HB-00008 Chemical Drain Tank 1

12/07/83 Radwaste Operation RTN-HB-00009 Liquid Radwaste Evaporator 0 08/04/83 07/l&/83 Radwaste Operation RZi-HB-00010 Transfer RCDT to Waste 0

03/28/83 Radwaste Holdup Tank RTN-HB-000ll Transfer RCDT to Recycle 0

04/26/83 Radwaste Holdup Tank RTN-HB-00012 Transfer Waste Holdup 1

12/07/83 Radwaste Tank To Floor Drain Tanks RTN-HB-00013 Reprocess Contents of 0

04/26/83 Radwaste Waste Evaporator Condensate Tank RTN-HB-00014 Transfer Waste Evaporator 0

04/20/83 Radwaste Condensate-Tank to Waste Holdup Tank RTN-HB-00015 Transfer Waste Evaporator 0

04/20/83 Radwaste Condensate Tank to Waste Monitor Tank A RTN-HB-00016 Transfer Waste Evaporator 0

04/26/83 Radwaste Condensate Tank To Recycle 4

Holdup Tank

. :--. v.. ~ 1: - -~,.c.; w.ym

,:. -~.

,,r

--:- ~ ~ :.

.. - ;e> -,,. -, -

p m-,,: c

.v-

.,.r.

.. ~

. a.

...\\

.G,..4.._.

c._.i...

i e

DATE 12/16/83 PAGE 3

of 6

RADWASTE Procedure Date Deficiency Resp.

Number Title Rev.

Issued Page Date Dept.

RTN-HB-00017 Transfer Waste Evaporator 0

05/04/83 04/28/83 Radwaste Condensate Tank To Reactor Makeup Water Storage Tank RTN-HB-00018 Transfer Liquid Between 1

12/19/83 Radwaste Floor Drain Tanks A & B RTN-HB-00019 Transfer Floor Drain 1

12/07/83 Radwaste Tanks To Waste Holdup Tank RTN-HB-00020 Transfer Floor Drain 1

12/19/83 Radwaste Tanks To Waste Monitor Tank A RTN-HB-00021 Transfer Floor Dr'ain Tanks 0 03/28/83 Radwaste To The Waste Evaporator l

l RTN-HB-000 22 Partial Reprocessing Of 1

11/29/S3 Radwaste Waste Monitor Tanks RTN-HB-0 00 23 Tt nsfer Waste Monitor 0

' 04/07/83 Radwaste Tank A to Laundry Water Storage Tank RTN-HB-00024 Reprocess Waste Monitor 1

12/07/83 Radwaste Tanks Through Waste Evaporator RTN-HB-00025 Transfer Waste Monitor 1

12/07/83 Radwaste Tanks Tc Waste Holdup Tank RTN-HB-C0026 Transfer Laundry and Hot 1

11/29/83 Radwaste Shower Tank to Laundry Water Storage Tank RTN-HB-00027 Transfer Laundry and Hot i

11/29/83 Radwaste Shower Tank to Waste Monitor B RTN-HB-00028 Transfer Laundry Water 0

03/28/83 Radwaste Storage Tank to Waste Monitor Tank B RTN-HB-00029 Transfer Laundry Water 0

04/06/83 Radwaste Storage Tank To The Laundry And Hot Shower Tank RTN-HB-00030 Waste Evaporator Cooldown 0

09/20/83 09/13/83 Radwaste and Pumpout u ;--

m. ve. w..-.

.-.,.-.e---m r-.,-w.

- ~:,, ~. - - m. : n.

.n. e: ---,: -.

w- -

g b

,=+g b

+

t

~-

DATE 12/16/83 PAGE 4

of 6

RADNASTE Procedure Date Deficiency Resp.

Number Title Rev.

Issued Page Date Dept.

RTN-HB-00031 Waste Evaporator Shutdown 0

09/15/83 Radwaste RTN-HB-00033 Reverse Osmosis 0

06/15/83 06/09/83 Radwaste Unit Operation RTN-HC-00001 Load Ceinent Storage Silo 1

12/19/83 Radwaste RTN-HC-00002 Load Cer.ent Day Tank 0

06/15/83 0607/83 Radwaste RTN-HC-00003 Set Dribble Cutoff 0

03/28/83 Radwaste Compensation RTN-HC-00004 Cement Filling Station 0

06/15/83 06/08/83 Radwaste Operation RTN-HC-00005 Decanting And Drumming 0

09/15/83 Radwaste Station Operation RTN-HC-00006 Radwaste Bridge Crane 0

05/25/83 05/02/83 Radwaste Crane Operation -

RTN-HC-00007 Caustic And Acid 0

09/15/83 Radwaste Addition Tank Operation RTN-HC-00008 Dry Waste Compactor 0

04/26/83 04/13/83 Radwaste Operation RTN-HC-00009 Drum Inspection and 0

03/28/83 Radwaste Labeling Station Operation RTN-HC-00011 Solid Radwaste Air 0

06/15/83 06/01/83 Radwaste Compressors and Air Dryers Operation RTN-HC-00012 Evaporator Bottoms Tanks 0

07/20/83 Radwaste Operation RTN-HD-00001 Operation of Spray Booth 0

04/20/83 03/30/83 Radwaste RTN-HD-00002 Turbulator Operation 0

04/20/83 04/12/83 Radwaste RTN-HD-00003 Operation of Large 1

11/29/83 11/14/83 Radwaste Decon Tanks RTN-HD-0000 4 Operation of Small 1

10/05/83 09/17/83 Radwaste Decon Tanks y.

.y

_.3.

-~; :,

-,-- =- - ~_.-

~~ - ;

_. ~

-x-

~

DATE 12/16/83 f

PAGE 5

of

,6 RADWASTE Procedure Date Deficiency Resp.

Number Title Rev.

Issued Page Date Dept.

RTN-HD-00005 Operate Fuel Cask 0

07/08/83 Radwaste Washdown System RTN-HD-00007 operation of 0

06/15/83 06/08/83 Radwaste Decontamination Laundry Washers RTN-HD-00008 Operation of 0

06/15/83 Radwaste Decontamination Laundry Dryers RTN-HD-00009 Operation of Ultransonic 0

04/26/83 04/18/83 Radwaste Immersible System RTN-HE-00001 Boron Recycle System 0

08/17/83 Radwaste Operation RTN-HE-00002 Vent Recycle 1

08/04/83 07/22/83 Radwaste Holdup Tanks RTN-HE-00003 Boron Recycle 0

07/08/83 06/10/83 Radwaste Evaporator Operation RTN-HE-00004 Boron Recycle Evaporator 0

08/04/83 07/16/83 Radwaste Cooldown and Pumpout RTN-HE-0 000 5 Boron Recycle Evaporator 0

09/20/63 Radwaste Shutdown RTN-HE-00006 Transfer Boron Recycle 0

07/20/83 Radwaste Evaporator Distillate RTN-HF-00004 Transfer SLW Drain 0

07/29/83 Radwaste Collector Tanks to SLW Monitor Tanks RTN-HF-00005 Recirculate Secondary 0

07/29/03 Radwaste Liquid Waste Monitor Tanks RTN-HF-00006 Transfer Liquid Between 0

07/29/83 Radwaste SLW Monitor Tanks A&B RTN-HF-00007 Partial Reprocessing Of 0

05/04/83 Radwaste SLW Monitor Tank Contents y, j ;, ;~ ~

c:m y.

, y ~~; ~ ~~~~ ~~~

r:-~

---~~~.vm--:--=-~~m~~--~-

0 4

DATE 12/16/83 PAGE 6,_ ' of 6

RADWASTE Procedure Date Deficiency Resp.

Number Title Rev.

Issued Page Date ppp t.

RTN-HF-00008 Transfer SLW Monitor 0

08/04/83 Radwaste Tank to Condenser RTN-HF-00009 Transfer SLW Monitor 0

07/29/83 Radwaste Tank to Laundry Water Storage Tank Rti-HF-00010 Transfer SLW Monitor Tank 0

07/29/83 Radwaste to Degasifier Tank RTN-EF-000ll Transfer SLW Monitor Tanks 0 07/29/83 Radwaste To Waste Holdup Tank

(

RTN-HF-00012 Reprocess Secondary Liquid 0 07/29/83 Radwaste Waste Monitor Tanks RTN-HF-00013 Route SLW Evaporator 0

07/29/83 Radwaste l

l Distillate to SLW Monitor Tanks l

RT.;-H2-00015 Trancfar High TDS 0

07/29/83 Radwaste l

Collector Tank to l

SLW Mor.itor Tanks RTN-HF-00017 Transfer Low TDS 0

07/29/83 Radwaste Collector Tanks to SLW Monitor Tanks RTN-HF-00018 Transfer SLW Monitor 0

07/29/83 Radwaste Tanks to Waste Monitor Tanks RTN-HF-00019 Transfer High TDS 0

07/29/83 Radwaste Collector Tanks To SLW Evaporator RTN-HF-00020 Transfer SLW Drain 0

07/29/83 Radwaste Collector Tanks to SLW Evaporator R7d-HF-000021 Secondary Liquid 0

07/0*/83 P.3dwaste Waste Evaporator Operation RTN-LD-00001 Detergent Drain Tank 0

06/08/83 05/19/83 Radwaste i

Operation

..~.s.....,-,;,..s.

m

. 7.,. m

, m... -

.cy,.-.

m..

.. ~.

..~-....f.,.

e' s.

e

,;i, u
  • s

e RTN-HB-00001 December 1, 1983 Revision 1 CALLAWAY PLANT NORMAL OPERATING PROCEDURE RPN-HB-00001 REACTOR COOLAITT DRAIN TANK OPERATION RESP.,nEPT.

Loada PREPARED BY 2VW

/

APPROVED BY DATE

/d// [.3

.x J

/

DA'"E ISSUED

'/c.)--/9-[3 mhim orocedure conta4.ns the followinae pacem 1

through' 3

Attachments through Accendices through Check 1.is t 1

through 2

i t

l I

y. 7...g,...,

,... ; _ __ u.,

..,..7

.,.. y,,.,.., _.....

i Proc 2d. No. RTN-/IB-00001 Rev.

1 "

Date 11/21/83

-DEFICIENCY LIST Sec tion Deficiency Descriotion Constraints Checklist No. 2 Valve locations nc.t None 1 identified 9

DL Pace 1 of 1 4

.., ; 3 -

g.

p.

... ~ -

Proce.. No.

RTN-HB-00001 1

Rav._

o REACTOR COOLANT DRAIN TANK OPERATION 1.0 PURPOSE AND SCOPE This crocedure is to orovide instructions for an initial valve, breaker and switch lineuo for the Reactor Coolant Drain Tank (RCDT) subsystem of the Licuid Radwaste System.

Provision is also made for recirculation of the RCDT con-tents at a maximum flowrate by hvoassino RCDT Pumos Discharge Heat Exchancer Recirculation Throttle, RB-V-0040.

2.0 PRECAUTIONS AND LIMITATIONS 2.1 To orevent oumo cavitation, RCDT Pumo A or RCDT Pumo B, should not be coerated when RCDT level is 10% or less.

2.2 To orevent overoressurization of the RCDT Heat Exchancer, RCDP Pumo A and Pumo B discharoe throttle valves should be adiusted to maintain flow less than 140 com.

2.3 Both RCDT oumos should not be coerated at the same time unless the RCDT Heat Exchancer Bvpass is onen.

3.0 MATERIALS AND EOUIPMENT None 4.0 INITIAL CONDITIONS 4.1 Gaseous Radwaste Svstem is in ooeration to remove waste cas from the RCDT.

4.2 Service Gas System is in oceration to supply hydrocen to the RCDT.

4.3 Soool cieces for draining accumulator tanks and reactot coolant looos are not installed.

4.4 Comoonent cooline water is flowing throuch the RCDT Heat Exchancer.

4.5 No other ooerations involvina RCDT are in crocress. = ~3 m:<

~~;;

~ ~ :3m u~~

~e.

y~ = ;

~;

e ~ ~ - ~ ~ ~ ;

- ~ ~ ~ ~ - - -

Procsd. No.

RTN-RB-00001 Rev.

1 5.0 PROCEDURE 5.1 Initia1 Va1.ve and Breaker Lineup, 5.1.1 Comolete Checklist No. 1, " Reactor Coolant Drain Tank Subsystem Valve Lineuo".

5.1.2 Ensure that Checklist No. 2,

" Reactor Coolant Orain Tank Subnvstem Valve, Breaker, and Switch Lineuo" is comol.eted by Ooerntions.

4 5.2 Recircu'ation of RCDP 5.2.1 Ensure that Checklist No. 1 and Checklist ND. 2 of this crocedure have been comol.eted.

4 5.2.2 Close RCDT Heat Exchanger Outlet Header Level Control Valve, HB-LCV-1003 by placing RCDT Level Controller, RB-LC-1003 mode selector switch (Panel 115) in the MANUAL /CLCSE cosition.

5.2.3 Ooen RCDT Pumos Discharge Heat Exchancer Recir-cul.ation Flow Clement Bveass Hand Control Val.ve, RB-RV-7143 by turning RCDT Pumos Dis-charoe Meat Exchancer Recirculation Flow Ele-l ment Bveass Rand Switch, RB-HS/-1003E (Panel 115) to the OPEN Dosition.

5.2.4 Purn RCUT Pumo A Handswitch, RB-Hs/-1003A (Panel 115) or RCDT Pumo B Handswitch, RB-HS/-1003B (Pane l. 115) to the S? ART copition.

Rel. ease handswitch to the AUTO position when red 1.icht comes on.

5.2.5 When recircul.ation is complete, stoo the oner-ating RCDT puro by turning RCDT Pumo A or B handswi.tch to the STOP position.

5.2.6 C1.ose byoams RB-HV-7143 bv turning handswitch HB-HS/-1003E to the CLOSE cosition.

5.2.7 Place RCDT Level Controller, RB-LC-1003 mode

(

sel.ector switch in the AUTO position.

l

6.0 REFERENCES

6.1 M-02RB01 4.2 M-02ECO2 6.3 M-02SJ03 l l

~,w_

__3

?

n i

=m wn : r y.. ~ - a. :v y.

-?.~v v

w--

l

... _ ~. __

r._..___

Procad. No.

RTN-HB-00001 R;v.

1 6.4 M-02BB02 6.5 M-02EG03 i

.. ~ ~

..,c :: y ;;:

+ ~

.n.

..,.L.,_.

~

o ocsd. No. RTN-HB-00001 r

O A

Acoroved for Une hv ds /1 Rev.

O

/

Page 1

of 1

j/,/

CHECKLIST NO. 1 REACTOR COOLANT DRAIM TANK SUBSYSTEM VALVE LINEUP Date/ Time Started

_Name(Print)

Initials Date/ Time Comoleted Name(Print)

Initials Reviewed By:

Date/' dime Foreman Signature l

COMPONENT /

DESCRIPTION LOCATION STATUS INITIAL RCDT Pumo Discharce to Fuel HB-V-0382/

Closed Pool Cleanuo Filters Drn Valve 7118 I RCDT Pumo Discharge to Waste HB-V-7137 /

Closed 7118 l Holduo 5-ank Iso i

RCDT Pumn to Fuel Pool EC-V-713 8 /.

Closed l

Cleanuo Filters Iso 7118 Aux Samo Sta In Iso From RCDT SJ-V-0832/

Closed 1311 I

I i RCDT Level Controller HB-LC-1003/

AUTO I

Panel 115 l

l ll

.i I

I l

1

~v,

--~~ -

:.,- m ~;_2.;p..n p 9--..

, :m vr-

.m

.v<-

-~r

., a.:

,,,,a.,_m.,,

/

Proccd. No. RTN-HB-00001 Acoroved for Use hv

./

Rev.

1 J

Pace 1

of 7

[dg~'

CHECKLIST NO. 2 REACTOR COOLANT DRAIN TANK SUBSYSTEM VALVE, BREAKER, AND SWITCH LINEUP l

l-Date/ Time Started Name (Print)

Initials Date/ Time Comol.eted Name (Print)

Initials i

Reviewed Bv:

Date/ Time Foreman Signature 1

4 l

COMPONENT /

DESCRIPTION LOCATION STATUS INITIAL RCDT HB-LT-1003 Ref Roof &

HB-V-0014/

Open iHB-PT-1004 Root 232 l

l lRCDT HB-LT-1003 Var Root &

HB-V-0015/

Open HB-PT-1004 Root 232 lRC Pumo Seals Hdr Drn HB-V-0449/

Closed 232

,RCDT Outlet to Waste Gas HB-V-0016 /

Ooen l

lComoressor 231 iRCDT Outlet Rdr Vent l HB-V-0022/

Closed 232 RCDT to Waste Gas Cmost Inner HB-V-0017/

Closed r.

Ctmt HB-HV-7126 Uostream Test Conn 231 l

l lRCDT to Waste Gas Cmost HD-HV-7150 &

HB-V-04 20 /

Closed HB-HV-7126 Test Conn 133 1 RCDT Waste Gas Cmost Outer HB-V-0018/

Closed ICtat HB-HV-71.50 Dnstrm Test Conn 133 RDCT to Waste Gas Cmost Hdr i

HB-V-0025/

Closed Uomtrm Samole Conn 133 RCDT to Was.te Gas Cmost Rdr HB-V-0026/

Closed Dnstrm Samole Conn 133 RCDT to Waste Gas Cmost HB-V-0014/

Ooen HB-PCV-71.52 Uostra Ios 133 RCDP to Wante Gas Comost Pressure HB-V-0020/

Ooen l

Centroller Root 133 i

I

":?~T'T'

-'*}^..,.t^'.~._

.,_... m

Gfj @'TfC QQQ C [ Q.'}^[

~ ~ " ~ TT <

  • 7"

_~

ProcGd. No. RTN-HB-00001 Rev.

1 Page 2

of 7

CHECKLIST NO. 2 (cont'd)

COMPONENT /

l DESCRIPTION LOCATION STATUS INITIAL NUDT to Waste Gas Cmour HB-PCV-7152 HB-V-0021/

Open 133 IDnstrm Iso I

~

\\M2 Sucolv Hdr Iso i HB-V-0023/

Open i

133 l

i H2 Sucol.v to RCDT Hdr Pressure HB-V-0024/

Ooen i

1 Controller Root 133 e

RCDT Outlet Hdr Drn to i

HB-V-00 27 /

Closed 232 RCDT Pmon RCDT Outlet Hdr Hand Ctrl HB-HV-7127 /

I Open 232

! Viv to RCDT Pumos SIS Acc Tk 3 Drn :idr HB-V-0028/

Closed l

232 IDnstrm Ieo l

l l

l SIS Acc T;; C Drn Hdr l HB-V-0029/

Closed i

lDnatrm Iso 232 i

SIS Acc Tk A Drn Rdr HB-V-0031/

Closed 231 Dnstrm Iso HB-V-0030/

Closed SIS Acc Tk D Drn Mdr l

231 I Dnstrm Iso SIS Acc Tk B Drn Hdr Drn HB-V'-0443/

Closed 232 l

SIS Acc Tk B&C Drn Hdr Vent HB-V-0444/

Closed 232 SIS Acc Tk A Den Mdr Dnstrm Iso KB-V-0445/

CJosed 231 i

I SIS Acc Tk A Drn Rdr Vent HB-V-0446/

Closed 231 Refuelina Pool to RCDT Pumos HB-V-0432/

Closed 232 Drn Mdr Drn PRT to RCDT Pumos Drn Hdr Drn HB-V-0401/

Closed 232 l

1

-,~

. n.v w :w...m m =- n 7 w

~.

.s

.si..

.~..;

-~.

3 m..._,

Procad. No. RTN-HB-00001 Rev.

1 Pace 3

of 7

1 CHECKLIST NO. 2 (cont'd)

\\

)

I COMPONENT /

DESCRIPTION LOCATION "TATUS INITIAL PCS Looo Drns to RCDT Pumos HB-V-7174 /

Closed Mdr Iso 232 lRCS Looos 2&3 Drn to RCDT Pumos HB-V-0400/

Closed 1 Mdr Vent 232 RCS Looos 2&3 Drn to RCDT Pumos HB-V-0404/

Closed 232 Har Drn RCS Looo Drns to RCDT Pumon His-V-0402 /

Closed Rdr Vent 232 lRCDTPumoASuctionIso HB-V-7131A/

Onen l

232 I

lRCDT Pumo A Suction Drn HB-V-0247/

Closed I

232 I

RCDT Pumo A HB-PI-0004 Root HB-V-0004/

Open 232 RCDT Pumo A Discharce Press HB-V-0006/

Open l

~

Ind Root 232 1

RCDT Pumo A Discharge Flush /Drn HB-V-0248/

Closed 232 Conn hRCDT Pumo A Discharge Throttle HB-V-7134A/

Throttled 232 RCDT Pumo A Canina Drn HB-V-0032/

Closed 232 RCDT Pumo B Suction Iso HB-V-7131B/

Ooen 232 RCDT Pumo B Suction Drn HB-V-0249/

Closed 1

232 RCDT Pump B HB-PI-0001 Root HBaV-0001/

Open 1

232 I

lRCDT Pumo B Test Conn HB-V-0002/

Closed i

232 i

I f

~'.

  • J r-

.,~ -,

a e

8~

p

= a

~

E -~ w.

_..--.--,..e-,_,,,.-,-----.,,-..r-,.

,, -. ~.,

4 Proced. No. RTN-HS-00001 Rev.

1 Pace 4

of 7

CHECKLIST NO. 2 (cont'd) i COMPONENT /

I LOCATION STATUS INITIAL DESCRIPTION I

RB-V-0033/

Closed RCDT Pumo B Casina Drn 232 i

j HB-V-0003/

Oosn RCDT Pumo B Discharce Press 232 lInd Root i

I lRCDP Pumo B Discharce Flush /Drn HB-V-0250/

Closed 232 l

iconn I1RCDP Pumo B Discharce Throttle HB-V-7&34B/

Throttled 232 I

I IRCDT Pumos Dt9ch HB-FT-1008 Hi Root HB-V-0007/

Ooen 232 1

i RCDT Pumos Di9ch HR-FT-1008 Lo Root HB-V-0008/

Ooen I

232 HS-V-7139A/

Open RCDT Pumos Discharce Rx 232 Inlet Iso RrDT Pumon Discharge Ex HB-V-7139B/

Ooen 232 l outlet Iso RCDT Pumos Discharce Hx l HB-V-7161/

Closed 232

' Bvoass RB-V-0251/

Closed RCDT Pmos Disch Hdr 232

" Flush / Vent Conn I

l EDT IN Pmos Disch Hx Out HB-V-0287/

Closed 232 IFlush/ Vent Conn l

HB-V-0332/

Closed lRCDT Pmos Disch Ex Wtr Box Drns 232 I

I l

RCDP Pmos Disch MX Wtr Box Drns HB-V-0332/

Closed 1

232 RCDT Pmos Disch Rx Wtr Box Drns HB-V-0333/

! Closed 1

232 I

RCDT Pmos Disch Ex Wtr Box Vent HB-V-0334/

Closed 232 l

l l

Procsd. No. RTN-HB-00001 Rev.

1 Pace 5

of 7

CHECKLIST NO. 2 (cont'd)

I COMPONENT /

DESCRIPTION LOCATION STATUS INITIAL L

RCDT Pmos Disch Shel.1 Side Drn HB-V-0335/

Closed 242 RCDP Pmos Disch Hx CCW HB-V-0034/

Closed i

Sucolv Test Iso 242 RCDT Pmos Dish Shell Side Vent HB-V-0336/

Closed 242 i

l l

RCDP Pmos Disch Ex CCW HB-V-0035/

Closed l

Return Test Iso 232 KCDP Pmos Disch Hx CCW HB-V-0305/

Onen J

Return Rdr HB-FI-0021 Mi Root 232

\\

)

LRCDT Pmos Disch Ex CCW HB-V-0306/

Open I

l Return Hdr HB-FI-0021 Lo Root 232 RCDT Pmos Disch Ex CCW HB-V--00 3 7 /

Throttled Return Rdt Iso 242 lRCDT Pumos Disch Ex Recirc HB-HV-714 3 /

Closed Flow Element Bvoass Hand 232 Ctrl V1v Ooen RCDT Pumos Disch Hx Pecirc HB-HV-7144/

Hand Control viv 232 RCDT Pmos Disch Hx Recire HB-V-0038/

Ooen HB-FE-1009 Hi Root 232 RCDT Pmos Disch Rx Recirc HB-V-0039/

Open HB-FE-1009 Lo Root 232 RCDP Pmos Disch Ex Recirc HB-V-0040/

Throttled 1 Throttle 232 I

RCDT Pmos Disch Hx Recirc HB-V-0389/

Closed

' Hdr Drn 232 RCDT Pmos Disch Hx Out HB-V-0388/

Closed Destrm Vent 232 RCDT Pmos Disch Ex Out Drn HB-V-0390/

Closed 231 I

l

.,...-.c.....,.-

.c

-...-.; z.eg --.-- - ;--.,-- c--n-,-,7.....- - -

.r m

.m..

,a,,

.g

,_.,y,

~

Procad. No. RTN-HB-00001 Rev.

1 Pace 6

of 7

CHECKLIST NO. 2 (cont'd)

I COMPONENT /

l DESCRIPTION LOCATION STATUS INITIAL I

!RC5Y'Umos Disch Hx Out Dnstrm HB-V-0391/

Closed lugnt 231 4

'RCDP Hx Outlet Hdr HB-LCV-1003 HB-V-7135/

Closed f

iBvoass 231 1

IRCDP Hx Outl et Hdr MB-LCV-1003 i HB-V-0009/

Closed IRynass Line Test /Drn Conn l

231 l

lRCDT Hx Outlet Hdr HB-LCV-3003 HB-V-7167/

Open IUostream Iso 231 l

l I

lRCDT Hx Out 4dr HB-LCV-1003 HB-V-7168/

C65n j

! Dnstrm IFo 231

" iib-V-0 419 /

Closed RCDT Hx Out Rdr Outer Ctmt I Test conn i

1.33 l

l RCDT Hx Out Rdr Outer Ctmt HB-V-0010/.

C16 Sed Test /Drn Conn 133 RCDT Hx Out Rdr HB-FOI-1014 Hi Root i HB-V-00ll/

Closed 133 R'CDT Hx Out Hdr HB-FOI-1014 Lo Root HB-V-0012/

Closed I

133

,RCDT Hx Outlet'Hdr HB-FOI-1014 HB-V-7170/

been Bvoass 133 1

RCDT Hx Out Rdy Iso to Nuc HB-V-0013/

~Open ISamo Svs 133 l

RCDT Hx EHB01 CCW Sucolv Iso EG-V-0106/

Open 1st 2nd 231

)Refuelino Pool to RCDT Pumo Iso EC-V-7159/

Closed 232 l

t l

' Pressurizer Relief Tank Suction BB-HV-8031/

Closed To RCDT Pumos 232 RCDT Hx Outlet to Pressurizer BB-HV-7141/

Closed I Relief Iso 232

- se.

,=

..m r.y;:. - ~

wy ;. ~~ ;. - ;;

g- - - -

.~~

t

u Procsd. No. RTN-NB-00001 Rev.

1 Page 7

of 7

CHECL.IST NO, 2 (cont'd) 3 l

COMPONENT /

l DESCRIP? ION LOCATION STATUS IMITTAL I

lRCDT Pmo A Test Conn HB-V-G905/

Closed 232 I

~

Misc Viv Sted Leakoff Hdr

!G V-0458/

Closed to RCDT Recirc Line Vent 232 Misc V1.v Stem Leakoff Ndr Vent HB-V-0454/

I Closed 251 l

1 fMisc V1v Stem Leakoff Hdr Vent HB-V-0459/

Closed i

242 Misc Vlv Stem Leakoff Hdr Drn HB-V-0455/

Closed 231 Misc Viv Stem Leakoff Hdr Drn HB-V-0456/

Closed I

1 231 I

\\ Misc VIV Stem Leakoff"Hdr Vent HB-V-0457/

Closed l

231 1

1RCDT.Pumo A Sunolv MCCPGl9NEF5 ON l Breaker I

RCDP Pomo B Sucoly MCCPG20NEF5 ON Breaker l

RCDT Hx Discharce Outer Ctmt Iso HB-HIS-7136/

OPEN Panel 021 l

' NCDT to Waste Gas Cmors Inner HB-HIS-7126/

OPEN Ctmt HB-HV-7150 Hand Ind Switch Panel 021 l

RCDT to Waste Gas Cmors Outer HB-HIS-7150/

OPEN I Ctmt HB-HV-7150 Hand Ind Switch Panel 021 NEDT Discharae Inner Ctmc Iso HB-HIS-7176/

OPEN Panel 021 I

I

~w.

.w s. m.==

-n: m m w

RTN-HB-00002 November 21, 1983 Revision 1 CALLAWAY PLANT NORMAL OPERATING PROCEDURE RTN-HB-00002 WASTE HOLDUP TANK OPERATION M. MIS)/e-RESP. DEPT.

43W476 PREPARED BY ae DATE /d /4M3 APPROVED BY I

J DATE ISSUED

/ /d/fd This procedure contains the following:

Pages 1

through 2

Attachments through Appendices through Checklist 1

through

'3 I

i A

~

Procrd. No.

RTN-HB-00002 Rsv.

1 WASTE HOLDUP TANK OPERATION 1.0 P_ILRPOSE AND SCOPE This procedure is to provide instructions for operating tha Waste Holdup Tank in the Liquid Radwaste System.

A flowpath is provided to the l

The initial valve lineup Waste Evaporator.

puts the Waste Holdup Tank in the recirculation t

mode.

i 2.0 PRECAUTIONS AND LIMITATIONS 2.1 The Waste Evaporator Feed Pump Discharge Filter l

should be replar:ed when the differential pres-f sure reaches 20 psid.

2.2 To prevent cavitation of the Weste Evaporator Feed Pump, do not operate the pump if tank level is less than 10%.

3.0 MATERIALS AND EQUIPMENT l

None 4.0 INITIAL CONDITIONS 4.1 Radwaste Bulding HVAC system must be in l

operaticn.

5.0 PROCEDURE 5.1 Complete Checklist No. 1, " Initial Valve and Breaker Lineup".

! 5.2 If recirculation of Waste Hold Up Tank Contents is desired, perform the following:

! 5.2.1 Turn Waste Evaporator Feed Pump handswitch HB-HS/-1001 (Panel HB-115) to START position.

Release handswitch to AUTO position when red light comes on.

NOTE Waste Evaporator Feed Pump shuts off in AUTO when tank level reaches 4%.

L l !

I i

)

~ m.1,7 n,. f. > ; ; ~ ~.,,.;_,

Proc;d. No.

RTN-HB-00002 Rev.

1

! 5.2.2 When recircuDttion is complete, turn handswitch HB-HS/-1001

,o the STOP position.

Observe that i

green stop light comes on, l

If transfer to the Waste Evaporator is desired, 5.3 perform the following:

5.3.1 Open Woote Evaporator Feed Inlet isolation HB-V-0053.

5.3.2 Monitor Waste Holdup Tank level on HB-LIS-1001.

5.3.3 Stop pump when desired volume has been trans-ferred by turning handswitch HB-HS/-1001 to STOP position.

Observe that green stop light ComeS on.

1 5.3.4 Close isolatior. HB-V-0053.

6.0 REFERENCES

6.1 M-02HB01 6.2 M-02HB02 6.3 M-02SJ02 4

5.4 E-03HB08A t

..-.,-n~.w,.

_. _.,. ~

. m.

a.

I O

Proced. No. RTN-HB-00002 pg A Ay

/

Rev.

1 Approved for Use by-w N. W idu

/

j Page 1

of

.3 CHECKLIST NO. 1 INITIAL VALVE AND BREAKER LINEUP 1

Initials _ _ !

! Date/ Time Started Name(Print) _

Initials

!! Date/ Time Completed Name(Print)

Date/ Time i.

Reviewed By:

Foreman Signature

-l

! COMPONENT /

LOCATION ! STATUS

! INITIAL !

I DESCRIPTION

! HB-V-0384(t)/! Closed

! Waste Holdup Tank Equipment Drain

! 7122 l

! Header Inlet Loop Seal Drain

! HB-V-0333(t)/! Closed

!LRW and GRW Inlet Loop Seal

! 7122

! Drain

! Waste Holdup TX HB-LT-1001

! HB-V-004!.i;t )/l Open

! 7122

! Reference Root

! HB-V-0044/

! Open

! Waste Holdup Tk HB-LT-1004

! 7122 1

! Variable Root 1

! HB-V-0421/

! Closed

! War >te Holdup Tk Overflow Loop

! 7122 1

! Seal Drain l

! HB-V-0288/

! Closed l

l

!! Waste Evaporator Feed Pump Suction

! 7121 l

!F3,ush/ Test Connection

! HB-V-0074/

! Closed

!! Waste Evaporator Feed Pump Casing

! 7121

! Drain

! HB-V-0289/

! Closed

! Waste Evaporator Feed Pump

! 7121

! Discharge Flush Connection

! HB-V-0046/

! Open

! Waste Evaporator Feed Pump

! 7121 i

! Discharge BB-PI-1016 Root

! HB-V-0076/

! Open

!! Waste Evaporator-Feed Pump To

! Nuclear Samoling System Isolation

! 7121

! HB-V-0387/

! Closed I

!! Floor Drain Tk Floor and Equipment

! 7125 1

! Drain Inlet Header Drain

! HB-V-0150/

! Closed

!! Equipment Drain Header Cross

! 7117

.! Connect to Floor and Equipment i-

! Drain Header

.m, ::. p

.. n ;....

m.

Z

Proced. No. RTN-H3-00002 L

Rav.

1 Page 2

of 3

CHFCKLIST NO. 1 (cont'd)

~~~

! COMPONENT /

1, LOCATION ! STATUS

! INITIAL !

DESCRIPTION I

! HB-V-0045/

! Open

! Waste Evaporator Feed Pump Suction

! 7117

! Isolation Closed

! HB-V-0073/

! Waste Holdup Tk Outlet Header

! 7117

! Drain

! HB-V-0075/

! Throttled!

!! Waste Evaporator Feed Pump

! 7117

' Recirculation Throttle

! HB-V-0047/

! Open

!! Waste Evaporator Feed Pump

! 7117

! Discharge Isolation

! SJ-V-0851/

! Closed

!! Waste Evap Feed Pump To Nuclear

! 7210

! Sampling Sink Inlet Isolation

! HB-V-0051/

! Open

!! Waste Evaporator Feed Inlet Flow

! 7204

! Indicator Hi Root

! HB-V-0052/

! Open

!! Waste Evaporator Feed Inlet Flow

! 7204

! Indicator Lo Rcot

! HB-V-00$3/

! Closed

-!! Waste Evaporator Feed Inlet

! 7205

! Isolation

! HB-V-0080/

! Closed 1

!! Secondary Liquid Waste Evaporator

! Feed to Liquid Rad Waste Evaporator ! 7203

! Feed Downstream Cross Connect

! HB-V-0081/

! Closed

!Poron Recycle System / Liquid Rad

! 7205

! Waste / Secondary Liquid Waste

! Evaporators Feed Cross Connect

! MCCPG18LDF2 ON

! Waste Evaporator Feed Pump

! Breaker

! HB-V-0395/

! Open

!-! Waste Evaporator Feed Pump I 7402B

! Discharge Filter HB-PDI-1017

! HB-V-0048/

! Open

-!Hi Root

! Waste Evaporator Feed Pump

! 7402B

! Discharge Filter HB-PDI-1017

!Lo Root

! HB-V-0438/

! Open

! Waste Evaporator Feed-Pump

! 7501 IDiccharge Filter Inlet Isolation

! HB-V-0077/

! Closed

! 7501

! Waste Evaporator Feed Pump

! Discharge Filter Drain

' * ' * '^

mm-e y et-emeure.3-g g,7 A g,,,

mm.-..

- - = = - - - - -.., -,, - -,,,,, _

Procad. No RTN-HB-00002 RLv.

1 Page 3

of 3

CHECKLIST NO. 1 (cont'd)

! COMPONENT /

LOCATION ! STATUS

! INITIAL !

DESCRIPTION

! HB-V-0078/

! Closed

! Waste Evaporator Feed Pump

! 7501

! Discharge Filter Vent

! HB-V-0049/

! Open

!!Wrste Evaporator Feed Pump

! 7501

! Discharge Filter Outlet Isolation

! HB-V-0079/

! Closed

!to Waste Evaporator

! Waste Evaporator Feed Pump-

! 7501

! Discharge Filter Outlet Isolation I

i Ito Floor Dre,in Tk

! HB-V-0199/

! Closed

!Eloor Drain Tk Pumps A and B 7501

! Discharge Filter Header Isolation Ito Waste Evaporator s

~ ** *g- *, f

~ ~

  • y, !" *
    • '*"'J
    • e, = ; *i - =, - * - '

$ 7 * ** a a **

  • P ',e ~ * ** '< -~....".:, s:. ;. _' ' ' *o :,..

,, _3.. _

===*-***: M ar**

r,.* v;y3 y.,;f g l,

RTN-HB-00006 Novzmbsr 21, 1983 Revision 1 CALLAWAY PLANT NORMAL OPERATING PROCEDURE 3

RTN-HB-00006 LAUNDRY A1:D HOT SHOWER TANK OPERATION 8dr ADMA57[

PREPARED SY -

RESP. DEPT.

n' DATE

/d //%23 3 APPROVED BY

, )

)

[

//

L

4> //9 / /_1 -

DATE ISSUED

/

/

This procedure contains the following:

'Pages 1~

through 2

Attachments through Appendices through Checklist 1

through 4

J+

.........u

.. s c,-g

..-~---,--n

-~.

m.

-m.

.-r

,~_ -,.

Procad. No.

RTN-HB-00006 Rev.

0 LAUNDRY AND HOT SHOWER TANK OPERATION 1.0

. PURPOSE AND SCOPE This procedure is to provide instructions for an initial valve and breaker lineup of the Laundry and Hot Shower Tank (LHST) subsystem of The normal valve the Liquid Radwaste System.

lineup provides a flowpath from the LHST to the Reverse. Osmosis (R.O.) Unit except for opening the Reverse Osmosis Process Unit Supply isola-tion, HB-V-0223.

The normal valve lineup also provides a flowpath from the R.O. Unit to the Laundry ter Storage Tank (LWST) through the LHST Charcoal Absorber.

Provision is also made to recirculate the LHST.

2.0 PRECAUTIONS AND LIMITATIONS do not line up To prevcnt overflow of the LHST, 2.1 tank to receive liquid when tank level is above 85%.

To prevent pump cavitation, do not operate the 2.i LHST. Pump when the tank leve.1 in less than 10%.

The LHST Pump Discha'ge Strainer should be r

2.3 cleaned when the differential pressure reaches 20 psid.

'The LHST Filter should be replaced when the 2.4 differential pressure reaches 20 psid.

3.0 MATERIALS AND EQUIPMENT None 4.0 INITIAL CONDITIONS Ensure Checklist No. 1 in procedure RTN-HB-4.1 00007, LAUNDRY WATER STORAGE TANK OPERATION, has been completed.

5.0 PROCEDURE 5.1 Initial valve and Breaker Lineup 5.1.1 Complete Checklist No. 1, " Laundry and Hot Shower Tank Subsystem Valve and Breaker Lineup." -.

.=,

. ~ - - -. - -, - - -.

=----c

, sa v.

o

,Proced. No.

RTN-HB-00006 Rsv.

0 Recirculation of Laundry and Hot Shower Tank 5.' 2 Ensure Checklist No. 1, " Laundry and Hot Shower 5.2.1 Tank Subsystem Valve and Breaker Lineup" is complete.

Turn LHST Pump Handswitch, HB-HS/-1010 to START Release handswitch to AUTO when red 5.2.2 position.

light comes on.

NOTE: The LHST Pump shuts off in AUTO when tank level reaches 4%.

turn handswitch When recirculation is complete, 5.2.3 HB-SS/-1010 to STOP position.

6.0 REFERENCES

6.1 M-02SJ02 6.2 M-02HB04 6.3 E-03HB08B 6.4 M-02HB03 6.5 M-02HB01(Q) 6.6 RTN-HB-00007.. -.....

c__ a, 3_.

3., ~ '

^ ' ~

}

~

Proced. No. RTN-HB-00006 Rev.

1 Page 1

of 4

(

[

N Approved for Use b

~

/

s g

,6/

CHECKLIST NO. 1 LAUNDRY AND HOT SHOWER TANK SUBSYSTEM VALVE AND BREAKER LINEUP Initials

! Date/ Time 3 tarted Name{ Print)

Initials

!! Date/ Time Completed Name(Print)

Date/ Time Reviewed By:

Foreman Signature

! COMPONENT /

DESCRIPTION LOCATION !

S. ' ATUS

! INITIAL !

! HB-V-0427(t)/! Closed

!! Laundry and Hot Shower Tk Inlet

! 7408

! Loop Seal Drain

! HB V-0473(t)/! Closed

!! Laundry And Hot Shower Tank Filter

! 7408

! Outlet Hesder Vent

?

losed

! C

! HB-V-0326/

!LaundE7^ Water Storage Tk Pump

! 7408

!Disharge to Laundry And Hot Shower

!Tk Isolation

! HB-V-0280/

! Open

! Laundry and Hot Shower Tk

! 7408

!HB-LT-1010 Root

! HB-V-0346/

! Open

!! Nuclear Samp System Return to

! Laundry and Hot Shower Tk Isolation ! 7408

! HB-V-0238/

! Closed

!! Laundry and Hot Shower Tk Outlet

! 7408

! Drain

! HB-V-0216/

! Open

!! Laundry and Hot Shower Tk Pump

! 7408

! Suction

~ HB-V-0299/

! Closed

! Laundry and Hot Shower Tk Pump

! 7408

! Flush / Test Conn 6ction

! HB-V-0239/

! Closed

!! Laundry and Hot Shower Tk' Pump

! 7408

! Casing Drain

! HB-V-0240/

! Throttled!

!! Laundry and Hot Shower Tk Pump

! 7408

! Recirculation Throttle

Proced. No. RTN-HB-00006 Rev.

1 Page 2

of 4

CHECKLIST NO. 1 (cont'd)

! COMPONENT /

LOCATION ! STATUS

! INITIAL !

DESCRIPTION

! HB-V-0241/

! Open

!! Laundry and Hot Shower Tk Pump

! 7408

! Recirculation Nuclear Samp System

! Laundry and Hot Shower Tk Pump

! HB-V-0217/

! Closed

! Isolation

! 7408

! Discharge HB-PI-1018C Root

! HB-V-0300/

! Closed I

!! Laundry and Hot Shower Tk Pump

! 7408

!Dincharge Flush Connection

! HB-V-0370/

! Open

!! Laundry and Hot Shower Tk Pump

! 740E

! Discharge Isolation

! HB-V-0407/

! Open

!! Laundry and Hot Shower Tk Pump

! 740n

! Discharge Strainer HB-PDI-1081

! HB-V-0408/

! Open

!Hi Poot

! Laundry and Hot Shower Tk Pump

! 7408

! Discharge Strainer HB-PDI-1081

!Lo-Root

i3-V-0243/

! Closed LLaundry.and Hot Shower TR Pump

! 7408

! Discharge Strainer Vent

" ~sB-V-0242/

Closed Laundry and Hot Shower Tk Pump

! 7408 1

! Discharge Strainer Drain

! HB-V-0219/

! Open

!! Laundry and Hot Shower Tk Pump 7408

! Discharge Strainer Outlet Isclation !!

! HB-V-0221/

! Open

!! Laundry and Hot ~ Shower Tk Filter

! 7408

! Inlet Isolation

_Open

! HB-V-0220/

! Laundry and Hot Shower Tk Filter

! 7408

!EB-PDI-1080 Hi Root

! HB-V-0222/

! Open

!! Laundry and Hot Shower Tk Filter

! 7408

!HB-PDI-1080 Lo Root

! HB-V-0245/

! Closed

!! Laundry and Hot Shower Tk Filter

! 7408

! Vent

! HB-V-0244/

! Closed

!! Laundry and Hot Shower Tk Filter

! 7408

! Drain

! HB-V-0409/

! Open

!! Laundry and Hot Shower Tk Filter

! 7408 1

! Outlet Isolation 1

.____._.._,._.m.

. ;.. 7

--. 7..

L

.. ~..-.

. _......,.__._...,.,,-- - -,._-- __.,.,._ m _,,....,... _. - -... -, - -, - -. -,.... -.

Proced. No. RTN-HB-00006 Rev.

1 Eage 3

of 4

CHECKLIST NO. 1 (cont'd)

! COMPONENT /

LOCATION ! STATUS

! INITIAL !

DESCRIPTION

! HB-V-0223(t)/l Closed I

! Reverse Osmosis Process Unit

! 7408

! Supply Isolation

! HB-V-0309/

! Closed

!! Laundry and Hot Shower Tk Filter

! 7411

! Outlet to Waste Monitor Tk B

! HB-V-0318/

! Closed

!Isol ation

! Laundry and Hot Shower Tk Filter I 7411

! Outlet to Waste Monitor Tk

!Demineralizer Isolation

! HB-V-0224/

! Open

! Reverse Osmosis Process Unit

! 7411

! Filtrate Outlet Isolation

! HB-V-0246/

! Closed

!! Laundry und Hot Shower Tk Filter

! 7411

! Outlet to Charcoal Adsorber

! HB-V-0226/

! Open

! Isolation

! Laundry eid Fot Shower Charcoal

! 7411

!Adsorber Inlet Isolation

!I HB-V-0225(t)/l Closed

!! Laundry and Hot Shower Charcoal.

! 7411

!Adsorber Bypass

! HB-V-0254(t )/ ! Closed

!! Laundry and Hot Shower Charcoal

! 7411 1Adsorber Charcoal Fill Isolation I

! HB-V-0338(t)/! Open f

! Laundry and Her Shower Charcoal

! 7411 j

!Adsorber HB-PDI-0028 Hi Root

)

! HB-V-0339/

! Open l

!! Laundry and Hot Shower Charcoal

! 7411 1

!Adsorber HB-PDI-0028 Lo Root

! HB-V-0255/

! Closed

!! Laundry and Hot Shower Charcoal

! 7411

!Adqorber Secondary Sluice Water

! Return Isolation

! HB-V-0256/

! Closed

! Laundry and Hot Shower Charcoal

~

! 7411

!Adsorber Secondary Sluice Water

! Return Header Drain

! HB-V-0257/

! Closed

! Laundry and Hot Shower Charcoal

! 7411

!Adsorber Secondary Spent Resin

! Outlet Isolation

! HB-V-0258/

! Closed I

! Laundry and Hot Shower Charcoal

! 7411

!Adsorber Secondary Sluice Water

! HB-V-0259/

! Closed I

! Supply Isolation

! Laundry and Hot Shower Charcoal

! 7411 lAdsorber Outlec Reader Drain o.

r.

.s

_D

Procad. No. RTN-HB-00006 Rev.

1 Page 4

of 4

CHECKLIST NO. 1 (cont'd)

! COMPONENT /

LOCATION ! STATUS

! INITIAL !

DESCRIPTION 1

'~

!! Laundry and Hot Shower Charcoal

! HB-V-0227/

! Open

!Adsorber Outlet Isolation

! 7411

!! Laundry and Hot. Shower Charcoal

! HB-V-0228/

! Open

!Adsorber Outlet Header Strainer

! 7411

!HB-PDI-0027 Hi Root

! Laundry and Hot Shower Charcoal

! HB-V-0229/-

! Open

!Adsorber Outlet Header Strainer

! 7411

!HB-PDI-0027 Lo Root

! Laundry and Hot ShcWer Charcoal

! HB-V-0260/

! Closed

!Adsorber Outlet Header Strainer

! 7411

! Drain

! Laundry and Hot Shower Charcoal

! HB-V-0230/

! Open

!Adsorber outlet Header Strainer

! 7411

! Outlet Isolation HB-V-0428(t)/! Closed

! Laundry Water Storage Tk Inlet

! 7411

! Loop Seal Drn

!! Laundry and Hot Shower Tk Pump

! MCCPG18MAF5 ON

~

! Breaker

!! Laundry and Hot Shower 2k Inlet

!SJ-V-0859/

! Closed

!to Nuclear Sample System

!7210

_t

... _ _.--. - m.

r,.:,y,....--.,7..~,

.~.~--.--;-

e-.

m e

---.7

-. - ~. - - -.. -. -. - - - - -,.. -

RTN-HB-00007 Novcmbor 21, 1983 Revision 1 CALLAWAY PLANT NORMAL OPERATING PROCEDURE RTN-EB-00007 LAUNDRY WATER STORAGE TANK OPERATION RESP. DEPT.

ADW4STE PREPARED BY

- 8/W

/

/d //

d7 APPROVED BY'

.N 4c DATE D

}

Y

/)//T,'/ /-

L DATE ISSUED This procedure contains the following:

Pages 1

through 2

Attachments through Appendices through Checklist 1

through 3

9 9

.m

Procad. No.

RTN-HB-00007 l

Rsv.

0 l

LAUNDRY WATER STORAGE TANK OPERATION I

1.0 PURPOSE AND SCOPE Thia procedure is to provide an initial valve 1.1 and bre::ker lineup.for the Laundry Water I

Storage Tank subsystem of the Liquid Radwaste The normal lineup will provide water System.

and to Washing Machine A, Washing Machine B, I

Laundry Dishwasher when they are running.

i Provision is also made for recirculation of the contents of the Laundry Water Storage Tank (LWST).

2.0 PRECAUTIONS AND LIMITATIONS To prevent pun,p cavitation, do not operate the 2.1 LWST Pump when the tank level is less than 10%.

To prevent overflow of the LWST do not lineup 2.2 task to receive liquid when tank level is above 85%.

3.0 MATERIAL AND EQUIPMENT 3.1 None 4.0 ~

INITIAL' CONDITIONS None 5.0 PROCEDURE 5.1 Initial Valve and-Breaker Lineup 5.1.1 Complete Checklist No. 1,

" Laundry Water Storage Tank Subsystem Valve Lineup."

Laundry Water Storage Tank to Laundry Equipment 5.2 Ensure Checklist No. 1, Laundry Water Storage 5.2.1 Tank subsystem Valve Lineup is completed.

Turn the LWST Pump Hand Indicating Switch H3-5.2.2 HIS-8007 (Panel HF-132) to the AUTO position.

NOTE The LWST Pump runs on demand in the AUTO position.

The pump shuts off in AUTO when the LWST l

level reaches 5%.

Laundry Water Storage Tank Recirculation.

5.3 _ _. _.. _.,...,. _. -,...,..

-.., _y-...,.,..

~;. c.,.....

~..

Procad. No.

RTN-HB-00007 j

Rav.

O i

Ensure Checklist 1," Laundry Water Storage Tank

. Subsystem Valve Lineup", has been completed.

5.3.1 Close LWST Pump Discharge Isolation HB-V-0233.

5.3.2 Turn LWST Pump Hand Indicating Switch, HB-H1S-5.3.3 0007 to the RUN position.

~

When recirculation is complete, turn hand indi-to the AUTO position.

5.3.4 cating switch HB-H15-0007 5.3.5

-Open isolation HB-V-0233.

6.0 REFERENCES

6.1 M-02HB04 6.2 M-025J02 6.3 E-03HB09 6.4 M-00HB01 (Q)

,,,,,y

-..-,y w

r--,--- - - --w.

g

I i.

j l

Proced. No. RTU-HB-00007 Rev.

1 Page 1

of 3

/

Approved for Use

/

M CHECKLIST NO. 1 LAUNDRY WATER STORAGE TANK SUBSYSTEM VALVE LINEUP Initials

! Date/ Time Started Name(Print)

Initia]s_

!! Date/ Time Completed Name(Print),._

Date/ Time Reviewed By:

Foreman Signature

~!

! COMPONENT /

LOCATION ! STATUS

! INITIAL !

DESCRIPTION

!! HB-V-0428(t)/t Closed

!! Laundry Water Storage Tk Inlet

! 7411

! Loop Seal Drain

! HB-V-0262/

! Open

! Laundry Water Storage Tk

! 7411

!HB-LT-0007 Root

! HB-V-0263/

! Closed

!! Laundry Water Storage Tk Gutlet

! 7411

! Header Drain

! HB-V-0231/

! Open

! Laundry Water Storage Tk Pump

! 7411

! Suction Isolation i HB-V-0301/

! Closed

! Laundry Water Storage Tk Pump

! 7411

! Suction Flush / Test-Connection

! HB-V-0264/

! Closed

!! Laundry Water Storage Tk Pump

! 7411

! Casing Drain

! HB-V-0232/

! Open

! Laundry Water Storage Tk Pump

! 7411 1

! Discharge HB-PI-0008 Root

! HB-V-0265/

! Throttled!

!! Laundry Water Storage Tk Pump

! 7411

! Discharge Recirculation Throttle

! HB-V-0266/

! Open

! Laundry Water Storage Tk Pump t 7411

! Discharge Recirculation Nuclear

! Sample System Isolation

! HB-V-0302/

! Closed

! Laundry Water Storage Tk Pump

! 7411

! Discharge Flush Connection

.es,..--=-;,..s--

  • *^

~

'"".*.,'Y.,,"fC

  • m

_ _ _.. -.. _, _........ -.. _,.. -...... - - -..._...... ~. -. _ _......,

Procad. No. RTN-HB-00007 Rsv.

1 Page 2

of 3

CHECKLIST NO. 1 (cont'd)

! COMPONENT /

I LOCATION ! STATUS

! INITIAL !

DESCRIPTION

! HB-V-0233/

! Open

!-! Laundry Water Storage Tk Pump

! 7411

! Discharge Isolation

! HB-V-0234/

! Open

!! Laundry Water Storage Tk Pump

! 7411

! Discharge HB-FT-0009 Hi Root

! HB-V-0235/

! Open

!! Laundry Water Storage Tk Pump

! 7411

! Discharge HB-FT-0009 Low Root

!'HB-V-0267/

! Clcsed

! Laundry Water Storage Tk Pump

! 7411

! Discharge to Waste Monitor Tk B

! HB-V-0326/

! Closed

! Isolation

! Laundry Water Storage Tk Pump-7408

! Discharge to Laundry and Hot Shower !!

~

! HB-V-0435(t)/t Closed

!Tk Isolation

! Laundry Water Storage Tk Pump

.! 7408

! Discharge to Reverse Osmosis, Unit

! HB-V-0237(t)/! Open

! Isolation

! Laundry Water. Storage Tk Pump

! 7408

! Discharge Header Washing Machine

! HB-V-0427/

! Closed

! Supply Isolation

! Laundry and Hot Shower Tk Inlet

! 7408

! Loop Seal Drain

!! HB-V-0480(t)/! Closed

!!Launury Water Storage Tk Pump

! 7408

?

?

! Discharge Header Vent

! MCCPG18MBF3 ON

!! Laundry Water Storage Tk Pump 7

-! Breaker-

! HB-V-0357(t)/t Closed

!! Laundry Water Storage Tk Pump

! 1101

! Discharge Header Washing Machine I

! Supply Drain

! HB-V-0358(t)/l Closed

! Laundry Water Storage Tk Pump

! 1102 iDischarge Header Washing Machine

! HB-V-0282/

! Open

! Supply Vent

! Washing Machine Hot Water Heater

! 3101

! Inlet Isolation

! HB-V-0359/

! Cloned I

!! Washing Machine Hot Water Heater

! 3101 1

! Inlet Vent

! HB-V-0307/

! Closed

!! Washing Machine Hot Water Heater

! 3101

! Drain f

Proced. No. RTN-HB-00007 Rtv.

1 Page 3

of 3

CHECKLIST NO. 1 (cont'd)

! COMPONENT /

DESCRIPTION LOCATION ! STATUS

! INITIAL !

! Washing Machine Hot Water Heater

! HB-V-0283/

! Open

! Outlet Isolation

! 3101

! Washing Machine Cold Water

! HB-V-0369/

! Open

! Isolation

! 3101

! Washing Machine A Hot Water Supply I HB-V-03Y7/

! Open

! Isolation

! 3208

! Washing Machine B Hot Water Supply 1 EB-V-0376/

! Open

! Isolation

! 0208 I

t

! Dishwasher Hot Water Supply

! HB-V-0378/

! Open

! Isolation

! 3208

! Washing Machine A Cold Water Supply ! HB-V-0380/

! Open

! Isolation

! 3208 t

! Washing Machine B Cole, water supply ! H3-V-0379/

! Cpen

!Isoletion

! 3208 I

! Dishwasher Cold Water Supply

! HB-V-0381/

! Open

! Isolation

! 3208 I

l n.-.- -:-

- - ~:

3,,3 - v, - ~~ :- - - -7.- m.-,. - :q - :

RTN-HB-00018 December 2, 1983 Revision 1 CALLAWAY PLANP NORMAL OPERAPING PROCEDURE RTN-HB-00018 PRANSFER LIOUID BETWEEN FLOOR DRAIN TANY.S A & B

~

RESP. DEPm.

4dH/A57'8 PREPARED BY M. M & /6--

/

/S[/Y h3 DATE APPROVED BY.

}

l/d//@/b nAmE ISSU,

/

l mhic nrocedure containe the foll.owi.not Paces 1-throuah 4

Attachments through Anocadicea throuah check 1.ist threuch

'G. '.

~*

a J

e

--..-~s,s.

n m,..r ;,..me.. e 7, <3_,. - r._

-r-

.,m.

~+

~

-e'e-w w

r-.w, ew y---

+n-m-g n+

e 7-,w,

-r--

w wer+m--

t

,w--*-

t- - - + -e-

0 e

Proced. No.

RTN-HB-00018 Rev.

1 B

TRANSFER LIOUID BE* WEEN FLOOR DRAIN PANKS A &

1.0 PURPOSE _AND 3 COPE mhis crocedure is to orovide instructions for transferrina Floor Drain Tank A (FDT A) to Floor Drain Tank B (FDT B) or for transferrino FUT B to FDP A.

2.0 PRECAUTIONS AND LIMITATIONS 2.1 To orevent overft.ow of FDP A or B do not 1.ineup tanka to receive linuid if level is above 85%.

To orevent cumo cav4.tation, do not ooerate 2.2 Floor Drain Tank Pumo A or B when the tank 1.evel i s 1.eam than 1.0%.

3.0 MATERIALS AND EQUIPMENT None 4.0 INI*IAL CONDITIONS Radwaste Buildina HVAC _ System is in ooeration.

4.1 l 4.2 F1.oor Drain Tank to be transferred is in a recircul.ation 1.ineuo as Der RTM-HB-00004,

" FLOOR DRAIN PANKS OPERATIONS".

I 5.0 PROCEDITRE 5.1 Transfer FD* A to FDP B 5.1.1 Ensure Checklimt No. 1, in procedure R*N-HB-0004, " FLOOR DRAIN TANKS OPERATION," has been comol.eted.

Close F1.oor Drain Tanks Pumos A & B Discharge

.5.1.2 Uontream Isolation, HB-V-0162.

5.1.

3 mo transfer contents of FDT A to FDT B using ank Pumo A, perform the followina:

Floor Drain m

5.1.3.1 Purn F1.oor Drain Tank Pumo A Hand Selector Switch HB-HSS/-1077 A (Panel HB-115) to the *ANK 1 cosition.

l NOTE If the PANK 1 nosition is not selected, lov lovel orotection is not orovided.

.J

r--

Proced. No.

RTN-HB-00018 Rev.

1 l 5.1. 3.2 murn F1.oor nrain Tank Pumo A Handswitch, I

MM-HS/-1077A, to the START cosition.

Release l

handmwitch to AUTO when the red licht comes on.

I NOTE Pumo shuts off in AUTO when I

tank level reaches 4%.

l 5.1.3.3 Monitor FDP A 1.evel on RB-LIS-1077A.

I 5.1.3.4 when desired volume has been transferred, turn I

handcwitch RB-PS/ 1.077A to STOP.cosition.

l 5.1. 4 To tranafer contents of FDT A to FDP B using

]

F1.cor Drain Tank Pumo B, oerform the followinct m nk Pump B Hand Selector 5.1.4.1 Turn Floor Drain a

Swi tch, HB-HSS/ 1.077B (Panel RB-115) to the l

TANK 1 cosition.

NOTE If the *ANK 1 Dosition is not selected, low level orotection l

1s not orovided, l 5.1.4.2 Turn Floor Drain mank Pumo B Handswitch, HB-HS/-1077B, to the START cosition.

Release handswitch to AUTO when _ the red licht comes on.

l MDTE Pumo shuts off in AUTO when l.

tank 1.evel. reaches 4%.

I 5.1.4.3 Monitor FDP A 1.evel on RB-LIS-1077A.

5.1.4.4 when desired vol.ume has been transferred, turn handswitch RB-HS/-1077B to STOP cosition.

I 5.1. 5 Ooen isol.ation HS-V-0162.

5.2 Transfer FDP B to FDT A 5.2.1 Ensure Check 1.ist No. 1, 4.n orocedure RTN-RB-00004, " FLOOR DRAIN TANKS OPERATION,' is comol.eted.

(

Ooen F1.oor Drain Tank A Recirculation In1.et 5.2.2 isol.ation RB-V-0191.

Close Floor Drain Tank B Recircul.ation Inlet 5.2.3 iaolation HB-V-0192.

C1.ose F1.oor Tank Pumos A & B Discharce Upstrean.

5.2.4 isolation, HB-V-0162.

t,

.~.

......, ~. _., :,, :..

,. =,,,,

n

--,..n,,-

9-

e Proced. No.

RTN-H3-00018 1

Rev.

  • o transfer contents of FOT B to FDP A usi.no Floor Drain Tank Pumn A, nerform the fol.lowino:

5.2.5 5.2.5.1 Turn F1.oor Drain *ank Pumo A Hand Se1.ector to the Switch, HB-HSS/-1077 A (Panel. HB-ll5)

PAMK 2 oosi. tion.

l NOTE If the TANK 2 nosition is not selected, low level orotection i= not orovided, 5.2.5.2 Purn Fioor Drain *ank Pumo A Handswitch, Release

)

HB-MS/-1077A to the START position.

I handmwitch to AUPO vhen the red itaht comes on.

l Pumo shuts off in AU*O when NOTE tank level reaches 4%.

B level. on HB-LIS-1077B.

l 5.2.5.3 Monitor FDP 5.2.5.4 when desired volume has been transferred, turn l

handswi tch HB-MS/-1077A to STOP cosition.

I A usinc o transfer contents of FDT B to FDP cerform the followinc m

' 5.2.6 Floor Drain Tank Pumo B, l

' '5.2.6.1 Purn Floor Drei.n Tank Pumo 3 Hand Selector Switch, HB-RSS/ 1.077B, (Phnel. HB '.15) to the l

)

l PANK 2 comition.

I NOTE If the TANK 2 cosition is not sel.ected, low level. orotection 19 not orovided.

5.2.6.2 Turn Floor Drain Tank Pumo B H:ndswitch, to the START cosition.

Release HB-MS/-10779, handswi.tch to AUTO when the red licht comes on.

l Pumo shuts off in AUTO when I

NOTE tank '. eval rea-hes 4%.

l 1 5.2.6.3 Monitor FDT B 1evel on HB-LIS-1077B.

5.2.6.4 When desired volume has been transferred, turn handswi.tch HB-HS/ 1.077B to STOP Dosition.

l 5.2.7 Close isolation HB-V-0191.

I 5.2.8 Ocen isolation HB-V-0192.

-l 5.2.9 Ooen isol.ation HR-V-0162.

s - -

-..c...,=

.g. ;,

~

- _. _ - _ _ - - -. _. _ _ _ _ - _ _ _ _. _ _ - - _ _. _ - _. _ _ _ _ ~ _ _ _ _ _ _ _ _ _ _ - -. _

Proc;d. NO.

RTN-HB-0.018 0

1 Rev.

6.0 REFERENCES

6.1 M-02HB02 A.2 M-02HB03 A.3 c4-02HB04 6.4 RW -HB-00004

?l 4,

-, - - ~ - ~ -

---.x,.,..,~,.,,..,r.

3.-.--,,,<--.....-..,--.,

'9

~

.a

<>4+?

//// p

[,8 ( 4, g*,

k*

IMAGE EVALUATION f4 4

k//j %j f>/

TEST TARGET (MT-3)

Y N gg,

777 k

\\\\\\\\\\///+ pjj s

1.0 l# EE E

[ll HE i,i ['

lilM

]

1.8

[i.25 i.4 i.6 150mm 4

6" 4

b+A<y 6

4%

  • N$+h///?'

t 7,

x

RTN-MB-00020 December 1, 1983 Revision 1 CALLAWAY PLANT NORMAL OPERA *ING PROCEDURE RTN-HB-00020

'RANSFER FLOOR DRAIN TANKS *O WASTE MONITOR TANK A AdMN PREPARED BY M / DAM RESP. nEPT.

i

/SL /% N-DATE APPROVED BY QJ OAPE ISSUED

/2//9/ 4--

/

t aim crocedure contains the fol.lowino r 1

through 13 Pacem throuch Attachments throuch Anoendices throuch Check 1.ist 1

t

.. ~.,

t.-------

y r.,. :,- -,

-,,,r.y.y c; j q q, w~ ~

.L. ;.. _.

. ~..- ~ ~..,

  • ~

Procsd. No. RTN-EB-000 20 Rev.

1 TRANSFER FLOOR DRAIN TANKS TO WASTE MONITOR TANK A 1.0 PURPOSE AND SCOPE This crocedure is to orovide instructions for transferring Floor Drain Tanks (FDT) A and B to Waste Monitor Tank (WMT) A usina anv of the foll.owinq flowcaths:

1.1 Via Linuid Waste (LW) Charcoal Adsorber and Waste Evaporator Condensate (WEC)

Demineralizer.

1.2 Via WMT Demineralizer only.

1. 3 Via LW Charcoal Adsorber and WMT Demineralizer.

2.0 PRECAUTIONS AND LIMITATIONS 2.1 To orevent ovei-flow of WMT A, do not line un tank to receive licuid if level exceeds 85%.

2.2 To orevent oumo cavitation, do not coerate FDT Pumo A or B when' tank level is less than 10%.

2.3 FDT Pumos A and B Discharge Filter should be reolaced when the differential pressure reaches 20 osid.

2.4 FDT Pumos A and B Discharge Strainer should be cleaned when the differential oressure reaches 20 osid.

3.0 MATERIALS AND EOUIPMENT None.

4.0 INITIAL CONDITIONS 4.1 Radwaste Buildina HVAC System is in operation.

4.2 FDT's have been samo3ed and meet chemistry soecifications.

4.3 Floor Drain Tank to be transfered is in a recirculation lineuo as per RTN-HB-00004,

" FLOOR DRAIN TANKS OPERATIONS." _g7_--,-..-....,.,-.3.,..--.;--..

m.

m:,.-

.e...... c n,,--

m.:n.u _w

\\

Proccd. No. RTN-HB-00020

~

1 Rev.

5.0 PROCEDURE Lineuo to transfer FDP A and B throuch LW Char-5.1 coal. Adsorber and WEC Demineraliser.

in orocedure RTN-HB-00003, Ensure Checklist #1 5.1.

1

" WASTE EVAPORATOR CONDENSATE TANK OPERATION",

is comol.eted.

Ensure "hecklist 41 in crocedure RTN-HB-0000!i, 5.1. 2

" WASTE MONITOR TANKS OPERATION", is comoleted.

Ensure Checklist 41 in procedure RTN-HB-00004, 5.1.3

" FLOOR DRAIN TANKS OPERATION", is comoleted.

Close WEC Tank Inlet Isolation HB-V-0068.

l 5.1..A Open FDT Pumos Discharge Header Filter to LW l 5.1.5 Charcoal Adsorber Isolation HB-V-0325.

Close LW Charcoal Adsorber Inlet Isolation l 5.1.6 HB-V-0059, Doen WEC Filter Discharge to WMT/Demineralizer 5.1.7 Isolation HB-V-0139.

Close WMT Demineralizer Inlet Isoiation 5.1.8 HB-V-0167.

Open WEC/FDT filters to WMT A Isolation 5.1.4 HB-V-0207.

Close WMT filter outlet to WMT.A Isolation 5.1.10 HB-V-0173.

Transfer FDT A Via LW Charcoal Adsorber and WEC 5.2 Demineralizer Ensure Steos 5.1.1 through 5.1.10 have been 5.2.1 c

oerformed.

Ensure FDT A Floor and Eculoment Drain Header 5.2.2 is closed.

Looo Seal Inlet Isolation HB-V-0156 Ensure FDT A Recirculation Inlet Isolation 5.2.3 HB-V-0191 is ooen.

Ensure FDT B Recirculation Inlet Isolation 5.2.4 HB-V-0192 is closed.

i l

l 1,

I

..-.-,,..,..m

,-..;.-~. -..,.~. n.

s ~ -

.a.

ProcGd. No. RTN-HB-00020 1

Rev.

I i

  • o transfer FDP A contents using FDP Pumo A, 5.2.5 nerform the fol. lowing:

5.2.5.1 Turn FDT Pumo A Hand Se1.ector Switch RB-HSS/-1077A (Panel HB-ll5) to the TANK 1 oosition.

l NOTE If the TANK 1 coaition is not selected, 1.ow 1.evel orotection in-not orovided.

Pumo A Handswitch, HB-HS/-1077A, to 5.2.5.2 Turn FDP the START cosition.

Release handswitch to AUTO when red ' light comes on.

NOTE Pumo shuts off in AUTO when tank level reaches 4%.

5.2.5.3 Monitor FDT A level 'on HB-LIS-1077 A and WMT A 1.evel on HB-LIS-1082.

5.2.5.4 when desired volume has been transferred, turn hand = witch MB-HS/-1077 A to the STOP position.

5.2.6 mo transfer FDP A contents usino FDT Pumo B, cerform the fol.lowino:

Pumo B Hand Selector Switch, l 5.2.6.1 Turn FDT HB-RSS/-1077B (Panel HB-115) to the TANK 1

)

oosition.

I NOTE If the TANK 1 cosition is not sel.ec ted, low 1.evel orotection is not orovided.

5.2.6.2 Turn FDT Pumo B Handswitch, FB-RS/-1077B, to the START oosition.

Release handswitch to AUTO l

when red light comes on.

NOTE Pump shuts off in AUTO when tank level reaches 4%.

l ' 5.2.6.3 Monitor FDT A level on HB-LIS-1077A and WMT A l

1.evel. on HB-LIS-1082.

5.2.6.4 When desired volume has been transferred, turn handswitch HB-HS/-1077B to the STOP position.

Onen WEC Tank Inlet Isolation HB-V-0068.

l 5.2.7

. _---~~r--

~

c--

... 7ym.

n

-e:.~.r.:.--- w-. g._,~~.

~

1 w.

m

Procad. No. RTN-HB-00020 1

kav.

Pumos Discharce Header Filter to LW Close FDT l 5.2.8 rharcoat Adsorber Imolation HB-V-0325.

Ooen LW Charcoal Adsorber Inlet Isolation l 5.2.9 HB-V-0054 Close WEC Filter Discharge to WMT/Demineralizer l 5.2.10 Isol.ation HB-V-0139.

4 Ocen WMT Demineralizer Inlet Isolation l-5.2.11 FB-V-0167.

Close WEC/FDT Filters to WMT A Isolation l 5.2.12 HB-V-0207.

Ooen WMT Filter Outlet to WMT A Isolation l 5.2.13 HB-V-01.73.

Refer to accrooriate Floor Drain Tanks techni-l 5.2.14 cal orocedure for desired lineuo.

Transfer FDT B Via LW Charcoal Adsorber and WEC 5.3 Demineralizer Ensure Steos 5.1.1 throuah 5.1.10 have been 5.3.1 conoleted.

Ensure FDP B Floor and Enuipment Drain Header Looo Seal Inlet Isolation HB-V-0151 is closed.

5.3.2 Ensure FDT A Recirculation Inlet Isolation 5.3.3 HB-V-0191 is closed.

Ensure FDT B Recirculation Inlet Isolation 5.3.4 HB-V-0192 is open.

To transfer FDT B contents usino FDT Pumo A, l 5.3.5 l

oerform the followinct 5.3.5.1 Turn FDT Pumo A Hand Selector Switch, HB-HSS/-1077A (Panel HB-115) to the TANK 2 l

cosition.

If the TANK 2 position is not l

NOTE selected, low level protection l

is not provided.

I,,_7 7,m.,...., m.m...,._,

...,. r,.

m,,m_.,..; _. c g

,g.,. g 7. _

,g,....:.

Proccd. No. RTN-MB-00020 1

Rev.

to l 5.3.5.2 Turn FDT Pumo A Handswitch, HB-MS/-1077A, Release handswitch to A l

the START position.

l when red licht comes on.

Pumo shuts off in AUTO when I

NOTE tank level reaches 4%.

l l.5.3.5.3 Monitor FDT B level on HB-LIS-1077B and WMT A l

level on HB-LIS-1082.

I 5.3.5.4 When desired volume has been transferred, turn handswitch HB-HS/-1077A to the STOP position.

I To transfer FDT B contents usina FDT Pumo B, l 5.3.6 I

cerform the followina:

Pumo B Hand Selector Switch, l 5.3.6.1 Turn FDP l

HB-HSS/-1077B (Panel HB-115) to the TANK 2 l

oosition.

If the TANK 2 nosition is not I

NOTE I

selected, low level protection la not orovided.

I I 5.3.6.2 Turn FDT Pumo B Handswitch HB-MS/-1077B to the START cosition.

Releaso handswitch to AUTO when red licht comes on.

Pumo shuts off in AUTO when NOTE tank level reaches 4%.

i l 5.3.6.3 Monitor FDT B level on HB-LIS-1077B and WMT A i

l 1evel on EB-LIS-1082.

l 5.3.6.4 When desired volume has been transferred, turn i

handswitch RB-HS/-1077B to the STOP position.

I Ooen WEC Tank Inlet Isolation HB-V-0068.

l 5.3.7 Close FDT Pumos Discharge Header Filter to LW 5.3.8 Charcoal. Adsorber Isolation HB-V-0325.

Doen LW Charcoal Adsorber Inlet Isolation 5.3.4 HB-V-0059.

Close WEC Filter Discharge to WMT/Demineralizer l 5.3.10 Isol.ation HB-V-0139.

Ocen WMT Demineralizer Inlet Isolation l 5.3.11 RB-V-0167. -.--..~,n,,-n,--m-,..w~....,.-.,------;.-..-,..

e Proccd. No. RTN-HB-00020 L

Rev.

Close WEC/FDT Filters to WMT A Isolation I 5. 3.1.2 HB-V-0207.

Ooen WMT Filter Outlet to WMT A Isolation l 5.3.13 HB-V-0173.

Refer to acorooriate Floor Drain Tanks techni-

! 5.3.14 cal. crocedure for desired lineuo.

Lineue To Transfer FDT A and B Throuch WMT 5.4 Demineralizer On1v Ensure Checklist 41 in orocedure RNT-HB-00005, is comol.eted.

5.4.1

" WASTE MONITOR TANKS OPERATION",

Ensure Checklist 41 in crocedure RTN-HB-00004, is completed.

5.4.2

" FLOOR DRAIN TANKS OPERATION",

Ooen FDT Pumos Discharge Header Filter Outlet 5.4.3 Isolation HB-V-0166.

Transfer FDT A Via WMT Demineralizer Oniv_

5.5 throuch 5.4.3 are completed.

5.5.1 Ensure Steos 5.4.1 Ensure FDT A Floor and Ecuioment Drain Header Looo Seal Inl.et Isolation HB-V-0156 is closed.

5.5.2 4

Ensure FDT A Recirculation Inlet Isolation 4

5.5.3 HB-V-0191 is open.

Ensure FDT B Recirculation Inlet Isolation 5.5.4 RB-V-0142 is closed.

FDT Pumo A, To transfer FDT A contents using I 5.5.5 cerform the following:

I 5.5.5.1 Turn FDT Pumo A Hand Selector Switchto the TANK 1 l

HB-HSS /-1077 A (Panel RB-115) l comition.

If the TANK 1 position is not NOTE selec ted, low level orotection is not orovided.

_l -

. -v.--. ~. - ;..,~.

m.-, m,

..,-- -~~. - n -,7;-

~ - - ~,. n....,. -:,nn.

.a.

Procrd. No. RTN-HB-00020 1

Rev.

to the.

5.5.5.2 Turn FDT Pumo A Handswitch HB-HS/-1077A, l

l S* ART position.

Release handswitch to AUTO l

when red licht comes on.

Pump shuts off in AUTO when l

NOTE tank level reaches 4%.

I I 5.5.5.3 Monitor FDT A level on HB-LIS-1077A and WMT A I

level on HB-LIS-1082.

5.5.5.4 When desired volume has been transferred, turn l

handswitch HB-HS/-1077A to the STOP position.

I To transfer FDT A contents using FDT Pumo B, l 5.5.6 I

cerform the following:

l 5.5.6.1 Turn FDT Pumo B Hand Selector Switch, I

HB-MSS /-1077B (Panel HB-115) to the TANK 1 l

cosition.

NOTE If the TAMK 1 cosition is not selected, low level protection I

la not provided.

to l 5.5.6.'2 Turn FDT Pumo B Handswitch, MB-HS/-3 077B,the STA l

I when red licht comes on.

Pumo shuts off in AUTO when I

MOTE tank level reaches 4%.

I 5.5.6.3 Monitor FDT A level on 7B-LIS-1077A and WMT A l

level on HB-LIS-1082.

l 5.5.6.4 When desired volume has been transferred, turn handswitch HB-HS/-1077B to the STOP cosition.

l

-l.5.5.7 Close isolation HB-V-0166.

Refer to approcriate Floor Drain Tanks techni-l 5.5.8 cal orocedure for desired lineuo.

Transfer FDT B Via WMT Demineralizer Oniv_

5.6 Ensure Steos 5.4.1 throuch 5.4.3 are comoleted.

5.6.1 Ensure FDT B Floor and Eauinment Drain Header Looo Seal Inlet Isolation HB-V-0151 is closed.

5.'6.2

! - - - - - ---me-se,,-: -..~m.,,n.p m -,- _w.,---, -~n-q3'.~3. m---..---,.-~- -

.n-e

Procad. No. RTN-HB-00020 1

1 Rev.

4 l

l Ensure FDT A Recirculation Inlet Isolation 5.6.3 HB-V-0191 is closed.

Ensure FDT B Recirculation Inlet Isolation -

5.6.4 HB-V-0192 is open.

To transfer FDT B contents using FDT Pumo A, l 5.6.5 oerform the following:

l 5.6.5.1 Turn FDT Pumo A Hand Selector Switch, I

HB-HSS/-1077A (Panel HB-1.15) to the TANK 2 I

cosition.

I NOTE If the TANK 2 oosition is not I

sel.ec ted, low level protection I

is not orovided.

to 5.6.5.2 Turn FDT Pumo A Handswitch, HB-HS/-1077A, the START cosition.

Release handswitch to AUTO when red light comes on.

NOTE Pumo shuts off in AUTO when tank level reaches 4%.

5.6.5.3 Monitor FDT B level on HB-LIS-1077B and WMT A ll' level on HB-LIS-1082.

5.6.5.4 When desired volume has been transferred, turn l

handswitch HB-HS/-1077A to the STOP cosition.

I To transfer FDT B contents usina FDT Pump B, 5.6.6 perform the following:

I 5.6.6.1 Turn FDT Pumo B Hand Selector Switch, HB-HSS/-1077B (Panel KB-115) to the TANK 2 l

Domition.

l NOTE If the TANK 2 position is not

]

selected, low level protection I

is not provided.

l 5.6.6.2 Turn FDT Pumo B Handswitch RB-RS/-1077B to the 1

START cosition.

Release handswitch to AUTO l

when red licht comes on.

Pumo shuts off in AUTO when I

NOTE tank level reaches 4%.

l 1 5.6.6.3 Monitor FDT B level on HB-LIS-1077B and WMT A l

level on RB-LIS-1082. -...

m y ;.,..-.=

~~

.....-..,,-,..=.,.>.7,

Procad. No. RTN-HB-00020 Rev.

1 5.6.6.4 When desired volume has been transferred, turn handswitch HB-HS/-1077B to the STOP position.

} 5.6.7 Close isolation HB-V-0166.

l 5.6.8 Refer to accropriate Floor Drain Tank technical procedure for desired lineuo.

5.7 Lineuo to Transfer FDT A and B Throuch LW Charcoal Adsorber and WMT Demineralizer Ensure Checklist #1 in crocedure RTN-HB-00005, 5.7.1

" WASTE MONITOR TANKS OPERATION", is completed.

5.7.2 Ensure Checklist #1 in procedure RTN-HB-00003,

" WASTE EVAPORATOR CONDENSATE TANK OPERATION",

is comoleted.

Ensure Checklist #1 in orocedure RTN-HB-00004, 5.7.3

" FLOOR DRAIN TANKS OPERATION", is como3eted.

Ooen FDT Pumps Discharge Header Filter to LW 5.7.4 Charcoal Adsorber Isolation HB-V-0325.

Close LW Charcoal Adsorber I'nlet Isolation 5.7.5 HB-V-0054

~

C.ose LW Charcoal Adsorber and WEC Demin-l 5.7.6 eralizer Byoass HB-V-0062.

5.7.7 Onen WEC Demineralizer Bypass Isolation HB-V-0061.

5.7.8 Close WEC Demineralizer Outlet Isolation HB-V-0063.

l 5.7.9 Open WEC Filter Discharge to WMT/Demineralizer Isolation HB-V-0139.

l 5.7.10 Close WEC Tank Inlet Isolation HB-V-0068.

Transfer FDT A Via LW Charcoal Adsorber and WMT 5.8 Demineralizer 5.8.l' Ensure Steos 5.7.1 through 5.7.10 are comoteted.

5.8.2 Ensure FDT A Floor and Ecuipment Drain Header Loco Seal Inlet Isolation HB-V-0156 is closed.

_q

.,---.:-,...c------...

.. n --.,,. 7... -->

---........-~~,-.n.c,.n

4 Proced. No. RTN-HB-00020_

1 d

R$v.

Ensure FDT A Recirculation Inlet Isolation 5.8.3 HB-V-0191 is ooen.

Ensure FDT B Recirculation Inlet Isolation 5.8.4 HB-V-0192 is closed.

To transfer FDT A contents usino FDT Pump A, l5.8.5 oerform the followino:

Pump A Fand Selector Switch to the TANK 1 5.8.5.1 Turn FDPBB-HSS/-1077 A (Panel HB-115)

J I

cosition.

If the TANK 1 position is not I

NOTE selected, low level orotection I

is not provided.

l Pumo A Handswitch, HB-HS/-1077A to the l 5.8.5.2 Turn FDP Release handswitch to AUTO l

START cosition.

when red licht comes on.

l Pumo shuts off in AUTO when I

NOTE tank level reaches 4%.

l 5.8.5.3 Monitor FDT A level on HB-LIS-1077A and WMT A level on HB-LIS-1082.

turn l 5.8.5.4 When desired volume has been transferred,hand I

To transfer FDT A contents using FDT Pump B, 5.8.6 perform the followino:

I 5.8.6.1 Turn FDT Pumo B Hand Selector Switchto the TANK l

HB-HSS/-1077B (Panel HB-115) l oosition.

If the TANK 1 cosition is not NOTE selected, low level protection

/

is not oronided.

i 5.8.6.2 Turn FDT Pumo B Handswitch HB-HS/-1077B to Release handswitch to AUTO START position.

when red light comes on.

l Pump shuts off in AUTO when I

NOTE tank level reaches 4%.

l' 5.8.6.3 Monitor FDT A level on HB-LIS-1077A and WMT 1.evel on HB-LIS-1082. ~ ~,.. -.... -..

p..., ; 7 7,.

.. e - %-.._,. m.-

~,.,

--~4

g. 3.. : r

. ~,

.., - -.. - ~.... - - - -

n.-

wnn

Proccd. No. RTN-HB-00020_

1 R2v.

l 5.8.6.4 When desired volume has been transferred,to the STOP cosition.

turn handswitch HB-HS/-1077B l

Close isolation HB-V-0325.

l 5.8.7 Ooen isolation HB-V-0059.

l 5.8.8 Ocen bvoass HB-V-0062.

l 5.R.4 Close icofation HB-V-0061.

I 5.8.10 Onen isolation HB-V-0063.

l 5.8.11 Close isolation HB-V-0134 I 9.8.12 Ooen isolation HB-V-0068.

I 5.8.13 Refer to accrocriate Floor Drain Tank technical I 5.8.14 orocedure for desired 1.ineuo.

Transfer FDT B Via LW Charcoal Adsorber and WMT 5.4 Demi ne ral.izer_

Ensure Steos 5.7.1 through 5.7.10 are 5.9.1 comoleted.

Ensure FDT B Floor and Enuloment Drain Header Looo Seal Inl.et Isolation HB-V-0151 is closed.

5.4.2 Ensure FDT A Recirculation Inlet Isolation 5.9.3 HB-V-0191 is closed.

Ensure FDT B Recircul.ation Inlet Isolation 5.4.4 HB-V-0192 is ooen.

  • o transfer FDT B contents usino FDT Pumo A, l

5.4.9 cerform the followinot I

} 5.9.5.1 Turn FDT Pumo A Hand Selector Switch, to the TANK 2 MB-9SS /-1077 A (Panel HB-115) 1 oosition.

If the TANK 2 cosition is not selected, low level orotection NOTE is not orovided.

I I

11 -

,,-.,.-m,,n - n,,

,-,,:n,

.v.-. 7 -

-m -

-,.. e r..

-.....- -.n...a.g. 3.- ---,.

v' g,g' b

44 ye

-ev-y-my-r-

-y-,-

--wy w

y y--

%+w e7*

e Procad. No. RTN-HB-00020 1

Rev.

5.4.5.2 Turn FDT Pumo A Handswitch HB-RS/-1077A to the l

l START cosition.

Release handswitch to AUTO I

when red licht -comes on.

I NOTE Pumo shuts off in AUTO when tank level reaches 4%.

l I 9.4.9.3 Monitor FDT B level on HB-LIS-1077B and WMT A l

level on HB-LIS-1082.

5.4.5.4 When desired volume has been transferred, turn l

handswitch HB-HS/-1077A to the STOP position.

I To transfer FDT B contenta usino FDT Pumo B, I 5.9.6 I

cerform the followinct I s.4.4.1 Purn FDP Pumo B Hand Selector Switch, I

HB-MSS /-1077B (Panel HB-115) to the TANK 2 l

oosition.

I NO*E If the TANK 2 oosition is not I

selected, low 1.evel protection I

is not orovided.

I 5.4.6.2 Turn FDP Pumo B Handswitch HB-HS/-1077B to the START cosition. -Release handswitch to AUTO l

l when red licht comes on.

I NOTE Pumo shuts off in AUTO when l

tank level reaches 4%.

5.4.6.3 Monitor FDT B level on HB-LIS-1077B and WMT A l

l 1evel on HB-LIS-1082.

l 5.4.6.4 When desired volume has been transferred, turn handswitch HB-HS/-1077B to the STOP position.

I 1 5.4.7 riose isolation HB-V-0325.

I 5.9.8 Ouen isolation HB-V-0059.

I 5.4.4 Ooen bvoass HB-V-0062.

] 5.4.10 Close isolation HB-V-0061.

I ?. 4.11 Open isol ation HB-V-0063.

I 5.4.12 Cloae isolation HB-V-0139.. :n yg--vgre ne p < v w- -

~.v-

.; >~~~~ - -~~ -- n

~ m:e. w: :,m c...

. g33 m -: z c

,4,=b g.

7+,

  • ~

e Proccd. No. RTN-HB-00020 1

R2v.

Open isolation -HB-V-0068.

l 5.4.13 Refer to aoorooriate Floor Drain Tank technical 1 5.9.14 orocedure for desired lineuo.

6.0 REFERENCES

6.1 M-02HB02 6.2 M-02MB03 6.3 E-03HB07B RTN-HB-00003 6.4 RTN-HB-00004 6.5 6.6 R*N-HB-00005

[

l i

l

%9 13 -

-~:- --

~rr m m --=--- y-

- - -m- ~, -

y,

- ym - w.,~::~

rv -n~;,
c;, ;

p~;~~;g 7; =w, cm-y-

w.g

=---.%-

-r

,+-g-y c

--9-.,

,.m. -..-.wem

,4---e y.

9---md

,e

-g

~

s RTN-HC-00001 Dscsmber 1, 1983 Revision 1 FALLAWAY PLANT NORMAL OPERATING PROCEDURE RW-HC-00001 LOAD CEMENT STORAGE SILO M.M4d&--

A d W 4 5"/~f PREPARED BY

/

RESP. OEPP.

/M!//- $ 3 DATE d'

APPROVED BY

}

f I /e9//$

DATE ISSUED

/

/

This crocedure contains the followina r 1

throuch 2

Paaes throuch Attachments throudh Accendices through Check 1.ists i

i 4

F 1 e l

l t

I

. " * *"-~~~'Nt"e****M l

7Y T"'f 9QU%" ~"7 5 ***, T?,t** ? *". ? P'**

  • l

" *:? T"--

. *[g*)" %{L*.*}.78 fQ *"T OP'". 7.* *;

~-,. -->...

q-

~---s

~e-,--

y3

<.wnn -my

-,m p,o-m.p-

-m-

- - - - - ~ -

em w

-m,-

-v w

,-wwm

--~..,..._,.,,;.

Procsd. No.

RTN-HC-00001 Rav.

1 LOAD CEMENT STORAGE SILO

~

PURPOSE AND SCOPE 1.

0 mhis crocedure is to orovide instructions for 1oadina the Cement Storace St.lo (S-HC-10 A).

Initiation of theme stens should becin uoon deli.very bv the bul.k cement aucolier.

2.0 PRECAUTIONS AND LIMITATIONS Resotratorv orotection may be recuired to ore-2.1 vent the innal.ation of cement dust.

To orevent overoressurizing the Cement Storace 2.2 Silo, ensure the silo Safety Relief Valve

  • wings f reel.v without bindinc at civot ooints.

3.0 MATERIALS AND EOUIPMENT l 3.1 Kev to Air comorensor But1. ding l 3.2 Work Glovec 4.0 INITIAL CONDITIONS Truck cositioned near Kamlok Fitting on the 4.1 4 inch fill 1.i n e.

correct cement tvoe has been verified.

4.2 Radwaate buildino RVAC is in coeration.

4.3 dri.ver has been informed as to how I 4.4 Delivery l

much cement to transfer.

5.0 PROCEDURE Perform Checklist No. 1 in crocedure.

5.1

" CEMENT FILLING STATION R*N-HC-00004, I

OPERATION" to energize the Cement Filling Station.

Remove Kamlok Cover on 4-inch fill line.

5.2 Attach feed hose from bulk cement delivery 5.3 truck to Kamlock Connection.

Set selector switch HC-SS-0028 (near the 4-inch l

5.4 fill line) to ON.

To orevent comoacting of l

CAUTION:

l l

cement, do not otrerfill tank.

l n--

,,<--...---,..y-:..-----~~w.

p m ~ m - n.~: ; r-: ~ :

--w g r.,

s '.,,

~_5 ;,

i

' *~

l Procad. No.

RPN-HC-00001 Rev.

1 Enaure creen FILL SILO PERMISSIVE licht 5.5 (located above HC-SS-0028) and Day Tank Vent Silo fillina ooerations shall not Fans are on.

is not on.

begin i f FILL SILO PERMISSIVE 1.ight NOPE: If the FILL SILO PERMISSIVE licht is not on, the Silo High Level sensor and Day Tank Vent Fans are not energized.

Ensure creen SILO HIGH LEVEL OPERABLE licht l 5.6 (1.ocated inside back canel of Cement Fil.linq I

Station Control Panel.) is on.

This 1.icht indicates that the I

NOTE:

l Hiah Level. Sensor is ooerable.

Have cement deliverv truck driver transfer 5.7 cement using truck's enuloment.

NOTE: Driver may notice soillace if rel.ief valve lifts, Cement Storace Sito until the Hich Level l 5.8 Fill.

A1. arm in received.

Have truck driver cut off cement sucol.v from truck.

l 5.,9 De-energize horn al. arm by turnino sel.ector switch HC-SS-0028 to OFF.

SILO HIGH LEVEL licht will NOTE: remain illuminated.

Blow the hose and fill line clear of cement, l 5.10 then remove l 5.1.1 Have truck driver turn off blowera, hose.

Reolace the Kamlok Cover on the 4-inch fill l 5.1.2

^

1. ine.

6.0 REFERENCES

l 6.1 M '.35-0450 l 6.2 RTM-HC-00004

. 7...r._

,:-v--,.1-w

- m -

,7,_,7...e ~.s 3

-,. - m _.. n y -...-... ~.

~

,,,s

1. '

a.

e e

a UNION ELECTRIC NUCLEAR OPERATIONS CON' ROLLED DOCUMD."" TRANSM!**A' AND RECE!?! FOR.M

6. & w (gg /hauv Aas.Ja my

"~u To:

gW m' 3 c 24437 Vol. #

7 4

Manual II s

Transmittal -

790 FROM: Docu knt Con:rol Oa:e:

12/19/93 En:1 sure (s): RTN INDEX RTN-HB-00001 Rev. 1 RTN-HB-00002 Rev. 1 RTN-HB-00006 Rev. 1 RTN-HB-00007 Rev. 1 RTN-HB-00018 Rev. 1 RTN-HB-00020 Rev. 1 RTN-HC-00001 Rev. 1 JFK/bef

?! ease leser: :he en:1: sed =a:erial in:: v::: Manual /? ::edure File.

Re: urn snee: :::

'-. P. Kanye F".S Sucervisor. Occumen Cent :1 Union Ele:::1: C:=:any a*laway Plan: - CA -6 A:know'edgema.::

I have becugn: y Manual!?rocedure File :: :urren: sta:us by :ncorpera:ing :he above ma:erial. Su:erseded pages have been removed and des:royed.

Signa:ure:

Date:

7:*,.E *Af.lf CA-#31A

.s eV.. ~.t o s

-