Interim Deficiency Rept DER 83-68 Re Pk Battery Racks Constructed W/Nuts & Bolts Not Meeting Spec Requirements. Initially Reported on 830928.Due to Extensive Investigation & Evaluation Required,Final Rept Expected by 840118
ML20086G686
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/19/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-28471-BSK, DER-83-68, DER-83-681-BSK, NUDOCS 8401120352
Download: ML20086G686 (2)


Text

._

%:ElVED

!.'nc Arizona Public Service Company PHOENIX,' ARIZONA 85036 P.O. BOX 21566 e

December 19, 1983 ANPP-28471-BSK/KCP ggj0,Wfgg

'U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:

Mr. T. W. Bishop; Director Division of' Resident Reactor Projects and Engineering Programs

Subject:

Time Extension for Report - DER 83-68 l

A 50.55(e) Potentially Reportable Condition Relating To PK Battery Racks Were Constructed With Some Nuts And Bolts Which Do Not Meet The Specification Requirements.

. File: 83-019-026; D.4.33.2

Reference:

(A) Telephone Conversation between P. Johnson and R. Tucker on September 28; 1983 (B) ANPP-28133, dated October 28; 1983 (Interim Report)

Dear Sir:

~The NRC was notified of a potentially reportable deficiency in Reference. ( A), and an Interim Report was transmitted by Reference (B). At that time, it was estimated that a Final Report would be available by December 20;- 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by January 18, 1984, at which time a complete report will be submitted.

i i

There is no new information or change to the Interim Report at this time.

Very truly yours,

~

Cli.(_

/1 LLL i

l E. E. Van Brunt, Jr.

l APS Vice President, Nuclear Projects Management ANPP Project Director l

EEVBJr/KCP:ru cc: See Page 2 8401120352 831219 PDR ADOCK 05000528

+

$p S

PDR L

8h -

f.

O'*-

e-Mr. T. W. Bishop DER 83-68 Page 2 cc:

Richard DeYoung, Director Office of Inspection and Enforcement JU. S. Nuclear Regulatory Commission Washington,' D. C. 20555 T. Gi Woods, Jr.

G. C. Andognini-J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees

'J. R. Bynum D. D. Green /P. P. Klute A.-C.

Gehr W. J. Stubblefield W..G.. Bingham R. L. Patterson i

R.~W.-' Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore111 l-S. R. Frost J. Self-D. Canady f

-Records Center Institute of Nuclear Power Operations r

1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 r-E i

b' i

1 I

I I

i