ML20083G860

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 83-67 Re ex-core Detector Encls Below Design Basis Flood Level.Initially Reported on 830928. Investigation in Progress.Next Rept Will Be Submitted by 840202
ML20083G860
Person / Time
Site: Palo Verde  
Issue date: 12/19/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-28459-BSK, DER-83-67, NUDOCS 8401120304
Download: ML20083G860 (2)


Text

c o.o.

>Jgcgig w

fly' Arizona Public Service Company P O. BOX 21666

  • PHOENIX, art 2ONA 85036 December 19, 1983

//# /g ANPP-28459-BSK/KCP ngl @ viy:

U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek',. CA 94596-5368 Attention:

Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension for Report - DER 83-67 A 50.55(e) Potentially Reportable Condition Relating To Ex-Core Detector Enclosures Are Below The Design Basis Flood Level.

File: 83-019-026; D.4;33.2 Reference :

(A) Telephone Conversation between P. Johnson and R. Tucker on September 28, 1983 (B) ANPP-28134, dated October 28, 1983 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportablc deficiency in Ref erence ( A), and an Interim Report was transmitted by Reference (B). At that time, it was estimated that a Final Report would be available by December 16, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by February 2, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly your,

CLLL N1 8401120304 831219 E. E. Van Brunt, Jr.

PDR ADOCK 05000528 APS Vice President, S

PDR Nuclear Projects Management ANPP Project Director EEVBJr/KCP:ru s

cc: See Page 2 9

do

+ -.

C

?c Mr.(T.W.: Bishop DER 83-67 Page 2 cc:

Richard DeYoung, Director Office of Inspection and Enforcement "U. S. Nuclear Regulatory Commission Washington, D.. C. 20555 T. G. Woods,fJr.

^

.GfC.'Andognini

' J. A. Roedel D. B. Fasnacht A. C. Rogers.

B. S; Kaplan-W. E.' Ide

- J. Vorees J. R. Bynum

-D. D. Green /P. P. Klute A. C. Gehr W. J. Stubblefield.

-W. G. Bingham R.EL. Facterson

'R. W. Welcher R. M. Grant-D. R. Hawkinson L. ~ E. Vorderbrueggen G. A. Fiore111 S. R. Frost J. Self-D. ' Canady Records Center Institute of Euclear Power Operations 1100 circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339

.