Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206T283 + (December 11, 1998)
- 05000364/LER-1998-007-01, :on 981116,ESF Actuation Occurred During DG 1000 Kw Load Rejection Test.Caused by Poor Jumper Electrical Connection.Improved Jumpers Will Be Used on Appropriate Terminals in Load Rejection Test Procedures.With + (December 11, 1998)
- 05000412/LER-1998-014-01, :on 981112,inadequate Source Range High Voltage Setpoint Led to Failure to Comply with Tss.Caused by Human Error.High Voltage Setpoint for Source Range N32 Was Adjusted to 1600 Vdc IAW W Technical Info.With + (December 11, 1998)
- ML20198B517 + (December 11, 1998)
- ML20198A232 + (December 11, 1998)
- ML20198C943 + (December 11, 1998)
- NPL-98-1020, Forwards Rev 1 to Calculation PBNP-IC-33, 4.16KV RT UV Matrix Relays Uncertainty/Setpoint Calculation. Calculation Verifies That Setpoint Calculation Provided with 980528 Submittal Is Conservative,Per 980911 RAI + (December 11, 1998)
- ML20198A239 + (December 11, 1998)
- ML20198C191 + (December 11, 1998)
- ML20198E297 + (December 11, 1998)
- ML20199D838 + (December 11, 1998)
- ML20197J972 + (December 11, 1998)
- ML20198B509 + (December 11, 1998)
- 05000315/LER-1998-031, :on 980610,potential Common Mode Failure of RHR Pumps Were Noted.Caused by Inaccurate Values.Accurate Miniflow Numbers Have Been Determined by Flow Testing + (December 11, 1998)
- 05000315/LER-1998-031-01, Forwards LER 98-031-01,re Potential Common Mode Failure of RHR Pumps Due to Use of Inaccurate Values.Commitment Made by Util,Listed + (December 11, 1998)
- IR 05000528/1998008 + (December 11, 1998)
- ML17059C423 + (December 11, 1998)
- ML17059C419 + (December 11, 1998)
- ML20198C105 + (December 11, 1998)
- ML20198C522 + (December 11, 1998)
- ML20198B476 + (December 11, 1998)
- ML17313A700 + (December 11, 1998)
- ML20198G678 + (December 11, 1998)
- ML20198L867 + (December 11, 1998)
- ML20198C747 + (December 11, 1998)
- 05000266/LER-1998-028, :on 981113,surveillances Required by Section XI Pressure Test Program Were Missed.Caused by Failure to Take Timely Action on & Implement Corrective Actions for ASME Program Problems.Completed 40 Month Pressure Test + (December 11, 1998)
- IR 05000443/1998009 + (December 11, 1998)
- ML20198L343 + (December 12, 1998)
- ML20198L362 + (December 12, 1998)
- ML20202D016 + (December 12, 1998)
- ML20198A676 + (December 12, 1998)
- ML20198A995 + (December 13, 1998)
- ML20206N469 + (December 13, 1998)
- IR 05000461/1998026 + (December 13, 1998)
- ML20198E292 + (December 13, 1998)
- ML17265A671 + (December 14, 1998)
- ML20202B201 + (December 14, 1998)
- ML20198Q426 + (December 14, 1998)
- ML20198P040 + (December 14, 1998)
- ML20198N946 + (December 14, 1998)
- ML20198N748 + (December 14, 1998)
- ML20198N700 + (December 14, 1998)
- ML20198J771 + (December 14, 1998)
- ML20198H315 + (December 14, 1998)
- ML20198H230 + (December 14, 1998)
- ML20198H093 + (December 14, 1998)
- ML20198G645 + (December 14, 1998)
- ML20198F000 + (December 14, 1998)
- ML20198E797 + (December 14, 1998)
- ML20198E768 + (December 14, 1998)
- ML20198E755 + (December 14, 1998)
- ML20198D817 + (December 14, 1998)
- IR 05000364/1999301 + (December 14, 1998)
- ML20198D671 + (December 14, 1998)