Amend 248 to License DPR-59,revising Definition for Logic Sys Functional Testing & Extending Surveillance Interval for Certain Instrumentation
ML20198B509
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/11/1998
From: Bajwa S
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20198B514 List:
References
NUDOCS 9812210002
Download: ML20198B509 (7)


Text

^-

ny%

UNITED STATES p

NUCLEAR REGULATORY COMMISSION If WASHINGTON, D.C. 20565-0001 l

\\p*****/

]

POWER AUTHORITY OF THE STATE OF NEW YORK DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.*

License No. DPR-59 j

1.

The Nuclear Regulatory Commission (the Commission) has found that:

i A.

The application for amendment by Power Authority of the State of New York (the licensee) dated March 30,1998, as supplemented October 27,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conductad in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-59 is hereby amended to read as fo!!ows:

l 9812210002 981211 DR ADOCK 05000333 PDR l<

I u '

(2) Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 248 and the Environmental Protection Plan contained in Appendix B are incorporated into Facility License No. DPR-59. PASNY shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effec'Jve as of the date of its issuance and is to be implemented within 30 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION l

S. Singh Bajwa, Director Project Directorate I-1 1

Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Attachment Changes to the Technical Specifications Date of Issuance: Decsber 11,1908 r

4

1 4

ATTACHMENT TO LICENSE AMENDMENT NO. PM FACILITY OPERATING LICENSE NO. DPR-59 DOCKET NO. 50-333 i

Revise Appendix A as follows:

Remove Paaes

' Insert Paaes 2

2 79 79 81 81 Revise Appendix B as follows:

Remove Paael insert Paaes 38 38

..,3 4

'l i

~

[

JAFNPP t

1.0 (cont'd)

C.

Cold Condition - Reactor coolant temperature A212*F.

4.

Instrument Check - An instrument check is a qualitative determination of acceptable operability by D.

Hot Standbv Condition - Hot Standby condition moans observation of instrument behavior during operation.

operation with coolant temperature >212*F, the Mode This determination shall include, where possible, t

i Switch in Start-up/ Hot Standby and reactor pressure comparison of the instrument with other

< 1,040 psig.

independent instruments measuring the same i

variable.

E.

Immediate - Immediate means that the required action will be initiated as soon as practicable considering the safe 5.

Instrument Channel Functional Test - An instrument operation of the unit and the importance of the required channel functional test means the injection of a.

action.

simulated signal into the instrument primary sensor 1

where possible tn verify the proper instrument I

F.

Instrumentation channel response, alarm and/or initiating action.

[

1.

Functional Test - A functional test is the manual 6.

Primary Containment isolation Actuation operation or initiation of a system, subsystem, or Instrumentation Response Time for Main Steam Line

[

component to verify that it functions within design isolation is the time interval which begins when the i

tolerances (e.g., the manuai start of a core spray monitored parameter exceeds the isolation actuation pump to verify that it runs and that it pumps the set point at the channel sensor and ends when the i

required volume of water).

Main Steam Isolation Valve solenoids are l

de-energized (16A-K14, K16, K51, & K52 pilot i

2.

Instrument Channel Calibration - An instrument solenoid relay contacts open). The response time i

channel calibration means the adjustment of an may be measured in one continuous step or in instrument signal output so that it corresponds, overlapping segments, with verification that all withir acceptable' range, and accuracy, to a known components are tested.

value(s) of the parameter which the instrument l

monitors. Calibration shall encompass the entire 7.

Logic System Functional Test - A logic system instrument channel including actuation, alarm or functional test shall be a test of all required logic i

trip.

components (i.e., all required relays and contacts, i

trip units, solid state logic elements, etc.) of a logic i

3.

Instrument Channel-An instrument channel means circuit, from as close to the sensor as practicable up l

an arrangement of a sensor and auxiliary equipment to, but not including, the actuated device, to verify

[

required to generate and transmit to a trip system a operability. The logic system functional test may be single trip signal related to the plan

  • parameter performed by means of any series of sequential,

[

monitored by that instrument channel.

overlapping, or total system steps so that the entire logic system is tested.

[

8.

Protective Action - An action initiated by the i

Protection System when limiting safety system j

setting is reached. A protective action can be at a channel or system level.

l t

i Amsndment No. O, 104, 100, 200, 248 l

2 l

JAFNPP TABLE 4.2-1 (Cont'd)

PRIMARY CONTAINMENT ISOLATION SYSTEM INSTRUMENTATION TEST AND CAllBRATION REQUIREMENTS i

Logic System Functional Test (Notes 7 & 9)

Frequency 1)

Main Steam Line isolation Valves R

Main Steam Line Drain Valves Reactor Water Sample Valves 2)

RHR - Isolation Valve Control R

Shutdown Cooling Valves 3)

Reactor Water Cleanup Isolation R

4)

Drywell isolation Valves R

TIP Withdrawal Atmospheric Control Valves 5)

Standby Gas Treatment System R

Reactor Building isolation 6)

HPCI Subsystem Auto isolation R

7)

RCIC Subsystem Auto isolation R

i NOTE: See notes following Table 4.2-5.

Amendment No. 14,13,53,89,10S,120,1SO,181,la^, 227,2S 79

JAFNPP TABLE 4.2-2 (Cont'd)

CORE AND CONTAINMENT COOLING SYSTEM INSTRUMENTATION TEST AND CALIBRATION REQUIREMENTS r

Logic System Functional Test Frequency 1)

Core Spray Subsystem SA (Notes 7 & 9) 2)

Low Pressure Coolant injection Subsystem SA (Notes 7 & 9) 3)

Containment Cooling Subsystem R

4)

HPCI Subsystem R (Notes 7 & 9) 5)

ADS Subsystem SA (Notes 7 & 9)

NOTE: See notes following Table 4.2-5.

I i

Amendment No. O, 02, 00, 101, 227, 248 81

JAFNPP

.e TABLE 3.10-2 MINIMUM TEST AND CALIBRATION FREQUENCY FOR RADIATION MONITORING SYSTEMS"'

s instrument Instrument Channel Instrument Channel Logic System Instrument Channels Check" Functional Test" Calibration Functica Test"'*'

M in Stack Exhaust Monitors and Recorders Daily Quarterly Quarterly RLfuel Area Exhaust Monitors and Recorders Daily Quarterly Quarterly R; actor Building Area Exhaust Monitors, Recorders, Daily Quarterly Quarterly Once per

[

and Isclation 24 Months Turbine Building Exhaust Monitors and Recorders Daily Quarterly Quarterly Radwaste Building Exhaust Monitors and Recorders Daily Quarterly Quarterly SJAE Radiation Monitors /Offgas Line Isolation Daily Quarterly Quarterly Once per 24 Months Mcin Control Room Ventilation Monitor Daily Quarterly Quarterly Mechenical Vacuum Pump Isolation

  • Once per g

i 24 Months I::

Liquid Radwaste Discharge Monitor /

Daily When Quarterly Quarterly Once per l

laciation""*"""

Discharging 24 Months Liquid Radwaste Discharge Flow Rate-Daily Quarterly Once per M:asuring Devices'd 18 Months Uquid Radwaste Discharge Radioactivity Daily Quarterly Once per Recorder '*

18 Months Normal Service Water Effluent Daily Quarterly Quarterly SBGTS Actuation Once per 1

24 Months Amendment No. 03, 127, 210, 233, 248 38

-