Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 52662 +
- 05000413/LER-2007-002 +
- ML17325B209 +
- ML17325B090 +
- ML17319A593 +
- ML17317B100 +
- ML17317A813 +
- ML053630083 +
- ML20009C878 +
- ML18087A722 +
- ML19149A624 +
- NOC-AE-06002095, Request for Enforcement Discretion for Technical Specifications 3.3.3.6 and 3.7.1.2 +
- ML18348A628 +
- ML20050B067 +
- ML20041F583 +
- ML20040C607 +
- ML050060080 +
- NL-03-083, April 2003 Monthly Operating Report for Indian Point 3 +
- ML20082J652 +
- ML20081J046 +
- ML20079Q313 +
- ML20073L302 +
- ML20071Q145 +
- ML20150A607 +
- ML20148H741 +
- ML20141A483 +
- ML20134K152 +
- ML20067A975 +
- ML20153B637 +
- ML20153B136 +
- ML20151C268 +
- ML20205J993 +
- ML20207C293 +
- ML20203D610 +
- ML20065T245 +
- ML20212L902 +
- ML20245B737 +
- ML20248B403 +
- ML20236R078 +
- ML20215C188 +
- IR 05000254/1986009 +
- 0CAN069802, Monthly Operating Repts for May 1998 for ANO Units 1 & 2 +
- IR 05000254/1987013 +
- IR 05000254/1987002 +
- ML20112J645 +
- 2CAN109504, Monthly Operating Rept for Sept 1995 for ANO Unit 2 +
- NG-94-2882, Monthly Operating Rept for July 1994 for Duane Arnold Energy Ctr +
- BECO-90-120, Monthly Operating Rept for Sept 1990 for Pilgrim Nuclear Power Station +
- 05000324/LER-1987-010-03, :on 871104,inoperability of Reactor Bldg Fire Hose Station 2-RB-23 Occurred.Caused by Personnel Error Re Fire Drill.Procedural Revs to Ensure That Affected Sys Restored Following Drill Will Be Implemented +
- 05000352/LER-1987-054, :on 870927,surveillance Test of Channel E for Control Rod Block for Scram Discharge Vol Not Performed within Required Time.Caused by Personnel Error.Surveillance Performed & Tracking List Prepared +