ML20073L302
| ML20073L302 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 04/30/1991 |
| From: | Sieber J, Winger M DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9105130277 | |
| Download: ML20073L302 (9) | |
Text
._
_% kh_
%$YE-
$d Duquesne Lidit 1~.-...-
% or c.,
P O f t.
4 u,.,
...m....i n e y m iby 8,1991 Beaver Valley Pcwcr Station Unit 1 - Docket No. 50-334, License lio. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Cooratirn PRoort U. S. Nuclear Rogulatory Comntission Document Control Desk Washington, D.C.
20555 Gentlenen:
In accorrlance with Apperdix A,
Technical Specifications, the Monthly Operating Report is subnitted for Unit 1 ard thit 2 for the month of April, 1991.
Very truly yours, L,'
M.D.Sieber
- [icePresident Nuclear Group MAW /mng Enclosures cc: NRC Regional Offiot King of Prussia, PA
/
9105130277 910430
/' k PDR ADOCK 05000334
/ 4, < )' '
R PDR
/h
- /
4 NARPATIVE SLt9%RY OF PON ELY OPGATING EXP mIINCE UNIT I APRIL 1991 April 1
'Ihe unit operated at a nominal value of 100% output.
through
- l April 4 April 5 At 2100- hours the Unit's output was reduced to 80% to load follow.
April 6 At-2200 hours the Unit's output was increased to a nominal value of 100%.
l April 7
'Ihe Unit operated at a naminal value of 100% output.
i through April 11 April 12 At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> the Unit's output was ranped down 'in preparation.for-the Unit's eight refueling outage. At-2142 hours the unit was removed frca service to begin the Unit's eight refueling outage. At 2155 hours0.0249 days <br />0.599 hours <br />0.00356 weeks <br />8.199775e-4 months <br /> the reactor was taken subcritical.
April 13 At 0754 hours0.00873 days <br />0.209 hours <br />0.00125 weeks <br />2.86897e-4 months <br /> the Unit entered Mode 4.-
April 14 At 0210 hours0.00243 days <br />0.0583 hours <br />3.472222e-4 weeks <br />7.9905e-5 months <br /> the Unit entered Mode 5.
April 15
'Ihe Unit remained in Mode 5.
through April-20 April 21 At 2330 hours0.027 days <br />0.647 hours <br />0.00385 weeks <br />8.86565e-4 months <br /> the Unit entered Mode 6.
t i
April 22
'Ihe Unit remained in Mode 6 for refueling.
3 through Q eil 30 F
4 i
i 3-l 1
i P
I i
i
.,_..---,,,,_.m,-._,--,.m....
,..,r.,
1 2
OPERATING DATA REPORT 1
DOCKET NO.
50-334 REPORT DATE:
05/03/91 i
COMPLETED BY: M.A.WINGl:R TELEPil0NE (412) 393 7621
?
OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: APRIL 1991 l
- 3. LICENSED TilERMAL POWER (MWt):
2652 4.
NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Cross MWo):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810 8.
IF CilANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICil RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A i
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
719.0 2879.0 131471.0
- 12. No. OF HRS REACTOR WAS CRITICAL:
284.9 2104.4 82398.8
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8 1
- 14. HOURS GENERATOR WAS ON LINE:
284.7 2070.5 80615.5
- 15. UNIT RESERVE SHUTDOWN 1100RS :
0.0 0.0 0.0 I. 6. GROSS THERMAL ENERGY GEN, (MWH):
734753.0 5316347.0 191604794,;
- 17. GROSS ELECT. ENERGY GEN. (MWH):
234808.0 1715918.0 61548647.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
220450.0 1621310.0 57485510.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 39,6 71.9 63.5
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 39.6 71.9 63.5 21 UNIT CAPACITY FACTOR (MDC): PCT 37.9 69.5 56.9
- 22. UNIT CAPACITY FACTOR (DER): PCT 36.7 67.4 55.2 23.' UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 15.3 16.3
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _06-21-91
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N /A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 4
_.-.m
_m..
.m m._
UNIT SHUTDOWNS AND POWER REDUCTIONS Docket so.
50-334 Unit Name BVPS Unit #1 Date miy T.
1991 Completed By M.A.
Winger REPORT MONTH APRIL 1991 Telephone (412) 393-7621 Method of Licensee Cause & Corrective-Duration Shutting Event System Component Action to Co.
Date Typet (Nours)
Reason 2 Down Reactor 3 Report #
Code 4 Code 5 Prevent Recurrence 11 910405 S
0 N
5 m/A ZZ ZZZZ2i Reduced output from 100% to 80% to load follow.
12 910412 S
O N
5 N/A ZZ ZZZZZZ Ramped power down prior to beginning 8th refueting outage.
13 910412 S
434.3 C
1 t/A RC FUELNX Unit shutdown for 5th refueling outage.
F-Forced Reason:
Method:
Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Explain) 1-Manual Preparrtion of Dets Entry Sheets B-Maintenance or Test 2-Manual Scram for Licensee Event Report (tER) File C-Refueting 3-Automatic Scram (NUREG0161).
D-Regulatory Restriction 4-Cont'd. from Previous Month E-operatos Training & License Exam 5-Reduction 5
F-Adelnistrative 9-Other Exhibit I-Same Source.
G-Operational Error (Eartain)
H-Other (Explain).
. -_. _ ~
AVIRAGE IRILY LNIT IGTR IlVIL tbchet No.59-334 Unit fWPS thit 1 Date lhv 7, 1991 Corpleted L7/ M. A. Wimet.
7blerhono f 4121393-762J IWni APRIL 1991 DAY AVEP/M IRILY IUffR LLVIL IAY AVEPJCE IRILY 1%TR LLVIL
(!Se-lict)
(We-! Jet) 1 808 17 0
2 813 18 0
3 808 19 0
4 000 20 0
5 792 21 0
3 6
629 22 0
7 791 23 0
8 783 24 0
t 9
783 25 0
10 800 26 0
11 804 27 0
32 666 28 0
13 0
29 0
14 0
30 0
15 0
I 16 0
l INSTRUCI' IONS On this formt, list the average daily unit power IcVel in Ise-liet for each day in the reporting month. Ctanpute to the nearest whole magawatt.
l l
10RPATIVE SIMenly or WfflitLY OPDMTDC IXPIRIDJCE LUIT II AIRIL 1991 April 1 The Lhit cperated at a imimi value of 100% output.
through Ipril 30 J
1 1
1
.l I
a i
i f
l
,n ----,,,,-n, n -
OPERATING DATA RI11PT DOCRET bo.
50 412 REPORT DATE 05/03/91 COMPLETED BY: M.A.VINUIR T L l.E PiloS E (412) 371 70/1 PERATING STA'1Ci
- 1. UNIT 11AME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: APRIL 1991
- 3. LICENSED TilERMAL POWER (MWt):
2652 4 NAMEPLATE PATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
870 7.
MAX. DEPENDABLE CAPACITY (Net MWe):
820 8.
IT CllANGES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT, GIVE REASONS:
9 POWER LEVEL TO WillCll RESTRICTED, IF ANY (Net MWe):
Unne
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR To DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
719.0 2879.0 30254.0
- 12. No. OF HRS. REACIOR WAS CRITICAL 719.0 2879.0 25226.3
- 13. REACTOR RESERVE SHUTDOWN HOURS-0.0 0.0 0.0 14 HOURS GENERATOR WAS ON LINE:
719,0 2879.0 25040.8
- 15. UNIT RESERVE SilVTDOWN HOURS:
0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN, (MWH).
1899670,0 7558219.0 00665835.4
- 17. GROSS ELECT ENERGY GEN. (MWH):
608200.0 2438800.0 19475600.0
- 18. NET ELECTRICAL ENER W ucN. (MWH):
577017.0 2315015.0 18358339.0
- 19. UNIT SERVICE FACTOP- (PERCENT) 100.0 100.0 82.8
- 20. UNIT AVAILABILITY " ACTOR:(PERCENT) 100.0 100.0 82.8
- 22. UNIT CAPACITY FACTOR (DER): PCT 96.0 96.2 72.6
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 4.7 24 SilVTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DUPATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR '10 COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCI AL OPEPATION N/A N/A
AVIR/4E MILY LNIT I%TR 11VIL tocket IJo. 50-412 Unit INPs Unit 2
!Mto liw 7,1991 orpletta by li,Adapr
'Iblefhono,L412) 393-7621 MJim! /TRIL 199,J DAY AVIRtGE IAILY TG'IR LEVII DAY AVIRtc0 DAILY IOGR ILVIL
(!No-!!ct)
(!Ne-!1ot) 1 811 17 807 2
811 18 803 3
811 19 802 4
807 20 798 5
803 21 807 6
807 22 798 7
800 23 802 8
794 24 802 9
798 25 803 10 807 26 802 11 811 27 794 12 806 28 794 j
13 807 29 790 14 802 30 794 l
15 802 16 803 DUIRIATIOtiS on this fornat, list the average daily unit pcw.r level in !Ne-Not for each day in the reportirg unnth. Orpute to the nearest whole megawatt.
l l
__.._m
_.... __ ~...._ m _. -..
_...._.__m__.
.mm i
i U3tt SEUTDO3:5 Ac0 POWER REDUCTIoss Docket Oo.
__50-412 Unit meme svPS Unit e2 Date
_may T.
1991 REPORT M04TM APRIL 1991 Completed By
_m.a. Wiance Telephone
_.t412) 393-7621
_T a
Method of Licensee Y
Duration Co.
Date Typel (Nours) acason2 Down teactor3 Report #
Code 4 Code 5 shutting Event system Component Cause L Corrective action to Prevent # cc ur renc e Cone 1
1 i
i 1
2 F-Forced Reason:
4 3
S-Scheduled A-Equipment Failure (Esplein)
Method:
B-Maintenance or Test 1-Manuet Exhibit G-Instructions for C-Refueting 2-Manual scram preparation of Date Entry sheets 3-Automatic scran f or L icensee E vent report (LER) File D-Regulatory testriction (suaEG0161).
6-Cont'd. from Previous Month E-Operator Training & License Eman F-Administrative 5-Reduction 5
9-Other C-Operational Error (Emplain)
Exhibit I-same s ource.
M-Other (Emplain) d
-