MONTHYEARA99026, Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99023, Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99022, Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99021, Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99019, Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99016, Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195H9521999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2 A99013, Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With A990101, Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99002, Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98062, Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98057, Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98052, Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98048, Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With A98042, Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 2 A98041, Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 2 A98039, Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 2 A98035, Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 2 A98033, Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 2 A98029, Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 2 A98015, Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 2 A98004, Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 2 A97076, Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 2 A97069, Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 2 A97058, Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 2 A97036, Monthly Operating Repts for Jul 1997 for Zion Generating Station,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Zion Generating Station,Units 1 & 2 ML20217M4151997-07-31031 July 1997 Corrected Page to Monthly Operating Rept for Jul 1997 for Zion Generating Station,Unit 1 A97027, Monthly Operating Repts for June 1997 for Zion Generating Station,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Zion Generating Station,Units 1 & 2 ML20148L5771997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Zion Generating Station,Units 1 & 2 ML20141D8601997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Zion Station Units 1 & 2 ML20217M4011997-03-31031 March 1997 Corrected Page to Monthly Operating Rept for March 1996 for Zion Generating Station,Unit 1 ML20137Y1491997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Zion Unit 1 ML20136J5091997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Zion,Units 1 & 2 ML20135A5311997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Zion Station Units 1 & 2 ML20133M1891996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Zion Generating Station Units 1 & 2 ML20132D7401996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Zion Generating Station Units 1 & 2 ML20134K7121996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Zion Generating Station Units 1 & 2 ML20134K7531996-09-30030 September 1996 Corrected Monthly Operating Repts for Sept 1996 for Zion,Units 1 & 2 ML20129B3711996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Zion Generating Station ML20134K7491996-08-31031 August 1996 Corrected Monthly Operating Repts for Aug 1996 for Zion,Units 1 & 2 ML20217M4071996-04-30030 April 1996 Corrected Page to Monthly Operating Rept for Apr 1996 for Zion Generating Station,Unit 1 ML20149K2411996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Zion Unit 1 ML20149G2851994-09-30030 September 1994 Monthly Operating Repts for Sept 1994 for Zion Generating Station ML20058K2281993-11-30030 November 1993 Monthly Operating Rept for Nov 1993 for Zion Generating Station ML20058K2341993-10-31031 October 1993 Corrected Monthly Operating Rept for Oct 1993 for Zion Unit 2 ML20059K0731993-10-31031 October 1993 Monthly Operating Repts for Oct 1993 for Zion Generating Station Units 1 & 2 ML20058P1631993-09-30030 September 1993 Monthly Operating Repts for Sept 1993 for Zion,Units 1 & 2 ML20057B6921993-08-31031 August 1993 Monthly Operating Rept for Aug 1993 for Zion,Unit 1 ML20056D6881993-07-31031 July 1993 Monthly Operating Repts for Jul 1993 for Zion Generating Station,Units 1 & 2 ML20128K6951993-01-31031 January 1993 Monthly Operating Repts for Jan 1993 for Zion,Units 1 & 2.W/ 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217J4791999-10-18018 October 1999 SER Approving Exemption from Certain Requirements of 10CFR73 for Zion Nuclear Power Station,Units 1 & 2.NRC Concluded That Proposed Alternative Measures for Protection Against Radiological Sabotage Meets Requirements of 10CFR73.55 A99026, Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers A99023, Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20211K0401999-08-31031 August 1999 SER Accepting Approval of Defueled Station Emergency Plan & Exemption from Certain Requirements of 10CFR50.47, Emergency Plans for Plants,Units 1 & 2 A99022, Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99021, Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Zion Nuclear Power Station,Units 1 & 2.With A99019, Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations A99016, Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20195H9521999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2 A99013, Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results A990101, Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Zion Nuclear Power Station,Units 1 & 2.With ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with A99002, Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98062, Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Zion Nuclear Power Station,Units 1 & 2.With ML20196J0061998-11-19019 November 1998 Rev 66 to Topical Rept CE-1-A, QA Program ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB A98057, Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98052, Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Zion Nuclear Power Station,Units 1 & 2.With A98049, Special Rept 304-123-98-001SR:on 980902,valid Failure Rept for 2A EDG Occurred.Cause Unknown.Util Submitted Written Certification of Permanent Cessation of Operations at Zion Station,Units 1 & 21998-09-25025 September 1998 Special Rept 304-123-98-001SR:on 980902,valid Failure Rept for 2A EDG Occurred.Cause Unknown.Util Submitted Written Certification of Permanent Cessation of Operations at Zion Station,Units 1 & 2 ML20195D1221998-08-31031 August 1998 DSAR, for Zion Station A98048, Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Zion Station,Units 1 & 2.With ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept A98042, Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Zion Station,Units 1 & 2 ML20236U6331998-07-24024 July 1998 Safety Evaluation Supporting Amends 179 & 166 to Licenses DPR-39 & DPR-48,respectively ML20236S3281998-07-20020 July 1998 Safety Evaluation Supporting Certified Fuel Handlers Training & Retraining Program A98041, Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Zion Nuclear Station,Units 1 & 2 ML20236J7911998-06-12012 June 1998 LER 98-S02-00:on 980517,first Shift Security Officer Reported Being Wounded by Unknown Subject Who Fled Area. Caused by accidental,self-inflicted Gunshot Wound.Removed Officer from Duty & Charged Officer W/Filing False Rept A98039, Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Zion Generating Station,Units 1 & 2 A98035, Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Zion Station,Units 1 & 2 A98033, Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Zion Station,Units 1 & 2 A98029, Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Zion Station,Units 1 & 2 A98015, Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Zion Station,Units 1 & 2 ML20199K1651998-01-23023 January 1998 Rev 65h to Topical Rept CE-1-A, Comm Ed QA Tr ML20198P8361998-01-0909 January 1998 SER Accepting Determination of Zone of Influnce for Coatings in Containment of Plant,Units 1 & 2 ML20198P8721998-01-0909 January 1998 Safety Evaluation Accepting Request for Alternative Insp Requirements for Augmented Exam of Reactor Presure Vessels for Zion Nuclear Power Station,Units 1 & 2 A98034, 1997 Annual 10CFR50.59 Summary Rept1997-12-31031 December 1997 1997 Annual 10CFR50.59 Summary Rept ML20216D3611997-12-31031 December 1997 Unicom Corp 1997 Summary Annual Rept A98004, Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Zion Station,Units 1 & 2 ML20202F1451997-12-0303 December 1997 Independent Investigation Team Rept on Safety Conscious Work Environment at Zion Station ML20202F0761997-12-0202 December 1997 Safety Evaluation Denying Licensee Proposed Alternative Contained in Request for Relief CR-13,Rev 1,of Removing Only Insulation Classified as Removable.Staff Determined That Submittal Does Not Provide Acceptable Level of Quality A97076, Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Zion Station,Units 1 & 2 ML20199J5931997-11-26026 November 1997 SG Insp Results,Fall 1996 Refueling Outage 14 (Z2R14) A97063, Special Rept 295-123-97-002SR:on 971014,failure of 1B EDG Occurred.Exam of Nipple Fractured Surface Revealed Failure Occurred Through Thread Root.Unit 1 Defueled & Unit 2 in Mode 5 Throughout Event1997-11-13013 November 1997 Special Rept 295-123-97-002SR:on 971014,failure of 1B EDG Occurred.Exam of Nipple Fractured Surface Revealed Failure Occurred Through Thread Root.Unit 1 Defueled & Unit 2 in Mode 5 Throughout Event A97069, Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Zion Station,Units 1 & 2 ML20211M0181997-10-0707 October 1997 Special Rept 295-123-97-001SR:on 970904,OA Motor Declared Inoperable Due to Pin Hole Leaks Identified on Pressure Regulating Relief valve,0FP0052.Procedure Was Rewritten to Ensure 0FP0052 Would Maintain Same Pressure When Fully Open A97058, Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Zion Generating Station,Units 1 & 2 ML20210V2401997-09-19019 September 1997 Rev 65g to Topical Rept CE-1-A, Comm Ed QA Manual 1999-09-30
[Table view] |
Text
. - - . . - - - - _.
I OPERATING DATA REPORT DOCKETNO. 50-898 DATE dB of #6 COMPLETED BY (2 Musfra TELEPHONE 'M MX/(/
OPERATING STAT 1JS Sft/ Notes
- 1. Unit Nesse:
- 2. Reporting Period [tWD ft, o/o/ To 2V00 F4,4/3/
- 3. Lassesed TW Power (MWt): s'A50
- 4. Namspiste Rating (Gross MWe): /of6
- 5. Design Electrical Rating (Not MWe): /dVO
- 6. Eh DependeWe Cepecity (Gross MWe): /085
- 7. Mashoum DepsedeMe Cepecify (Net MWe): /oVO
- g. If Changse Occur in Caposity Ratings (Items Number 3 Thsough 7) Since Last Report, Give Reasons:
AIR
- 9. Power level To Which Restrictsd,If Any (Net MWe): A/A
- 10. Reasses For Restrictions. If Any: A/A This Month Yr to.Dete Cummistive
- 11. HoursIn Reporting Posted 7YNd 7YNO //.D 950,d
- 12. Number of neurs Reseter Was CIstical 7VV, O '7 VV, O 7 9 V /3/), V
- 13. Resener Resern Shutdown Hours 6. O O. O A /08/J ,
I4. Heure Gementer On Ume 7YY' o 7Yy, a 72.350.2 \
- 15. Umse Reser= Shusdown uomo o/> /1 A o,/) !
- 16. Geess Therusel Bassgy Generated (MWH) c7.3 W 887 c23 W ff7 805,9/o8 /54
)
- 17. Geess Electrieel Energy Generated (MWH) 78f/e30 71# /a30 /4.5/r/ va8
. 14. Met Elecerleel Bassgr Genosseed (MWM) 75333/ 75d43/ /a5l/03.y_59
- 19. Unit Servies Facter /00.O /C0.O A f, 3
- 20. Unis Avensbasty Foster /d9.o /60,o /#,3
- 21. Unit Cepecity Facter (Using MDC Net) 47 Y 97 V 5/. V ,
- 22. Unit C.,ecity Feeter (Using DER Net) 97 Y 97. Y SV, V '
- 23. Use Faced omtage Rete o, O O.D /3.'/
- 24. Sheedowne Scheduled Over Next 6 Months (Type. Dete, and Duration of Each):
- 25. If Shot Down At End Of Report Perled. Estimated Date of Startup:
- 26. Unite la Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY y#
COMMERCIAL OPERATION k
R D
b / /
AVERAGE DAILY UNIT POWER LEVEL
~
DOCKET NO.
WI l Afif .
UNIT DATE M 07 [b COMPLETED BY tb TELEPHONE d*MdYd8 MON 11t & W$ibll
/
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) g /D0b 1y /0l?
2 l0kh I8 lb/Y 3 !O 19 /A/
< /0/9 20 /0/3
$ lOl 21 l0/I 6 !! 22 /O/!
7 /O 23 /O[1 s /n/& 2< /d//
, /6/7 2, /A/3 10 /O! 26 ![
11 l0b ~17 Il
,2 l0/7 2s /6//
13 !! 29 !
14 /h 30 !!
15 31 !
16 INSTRUCTIONS
~
On this format list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
i (9/77)
UNIT SHUTDOWNS AMD POWER RN
$0'h Z/dN d4/f 2
/ DATE REPORTMONTH 3@R C0tWLETEDBY /k#W AuM/A/
TELEPH0ffE (3t2l'Nd,9dW
~
g- = 4=3 ~
Licensee E Cause & Correctiw
$I
~
No. Date I. ] Ewn E Action to
- j[ #v 3
I 2 g gpj g d
Repwt #
fu Prevent Recurrence A0 lA-] M C N O 0 d l0 5 02 M ee nedach ots a vno.
J l I 2 3 4 F: Forced "" ** d i Reason: Exhibit G-Instructions l S: Scheduled A Equipment Failwe(Emplain) s. Manual Paration of Data B-Etenance of Test 2-Manual scras EntryP sheets for Licensee IW C Refueling 3-Aute scram Ewns Repwt (LER) File (NUREG-D Regulatory Restriction 4-centinued 0161)
E4perator Training & IJeanse Examination j:l*$*dI'**d F Administrattw 5 G4perational Errw(Empisin) Exhibit I Some Source (9/77) Hether(Emplain)
r OPERATING DATA REPORT DOCKETNO. IO ~M DATE O2 07 h COMPLETED BY 6 /h>Sf1C TELEPHONE 7%:'#0W OPERATING STATUS
- 1. Unit Nesse: M
- 2. Reporting Period:[M & C/ o/ 78 M M o/3/
- 3. Licemend Thennel Power (MWt): 3DO
- 4. Nesmoplate Rating (Gross MWe): /C#5
- 5. Design Electrical Rating (Not MWe): /OVO
- 6. Meshness DependeWe Cepecity (Gross MWe): /df5
- 7. m=i=- DependeWe Cepecify (Net MWe): /oVO S. If Cheeses Occur in Cepecity Ratings (Iteme Number 311moug! 7) Since Last Report, Give Reasons:
A/R
- 9. Power Level To Which Restricted,If Any Net MWe): M
- 10. Reasses For Restrictions,If Any:
This Month Yr.te.Dete Cumudstive
- 11. Hours in Reporting Period 79# O 7F#o 92/o73,d
- 12. Numbw Of House Reactor Wu CIitical /22 / /22, / 7/, MO e A 13.' Reeceer Rosem Shutdown Hows C,O 6. o 246./ .
- 14. Hours Generator On use O.O O. O / N A D , '7 l
- 15. Unit Rosem Shutdown Heers AO d. O o.O l
- 16. Gme Thermal Insegy Generated (MWH) O O #Co/o72565
- 17. Gme Electrical Enugy Generated (MWH) D D /4SE59'5 ;
- 18. mt Enocerlent Isergy Geesessed (MWH) -/L663 -/4663 6 0 b /o v 7 7 9 l
- 19. Unit Servios Factor dO /J. O A9 ff
- 20. Unit AvailPh80ty Factor O.O /).M /R 8
- 21. Unit cepecky Factor (Using MDC Net) - /. (o - /. /o .3 F. 5
- 22. Unit cepecity Factor (Using DER Net) ~/ lo - / /e 3 7. 5 ,
- 23. Unit Forced Outage Rats O. O _
d, O /5. X l
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Dete.end Duration of Each):
- 25. If Shot Down At End Of Report Period. Estimated Date of Startup: ebruO ry' 4, 8%
- 26. Units in Test States (Prior to Commercial Operation): Forecent Achieved INITIAL CRITICALITY INITIAL ELECTRICITY g COMMERCIAL OPERATION (9/77)
~ .
e.
AVERAGE DAILY UNIT POWER LEVEL
~
DOCKET NO.
%&iLF.
unit
-DATE b OO d7
' COMPLE1ED BY 1/ lb TELEPHONE OIk 7EbE@
MONTH -
J DAY ~ AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) i -7 i, -R/
2
~
18 ~M
~ -
3 19 4 '/O 20 5 '! 21 ~b 6 ~! 22 'Od
~Nb 7 23
- /6 24 ~20
- , - /5 25 -20 10 ~/ 26 11 ~ / 27 i2 - /f 2 - efd 13
~! 29 O
' ~
14 30 !
15 31 ~/
- i. c?/
INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute o the nearest whole megawatt.
(9/77)
i uM TSNuvooWNB ANDPOWER REDUCDONS DOCKETND. 5 0'3 i
UDST MAbdE I/oAl Une f 1
' DATE UlflR 000etATEDSY 6. A/shet REPORT Adoping 1ER.EPIIONE N2 W6 Sof y i
i i
~ 3 --
g be.ne g. L c s.a cm,.ciw j No. Date .3I h *];3sc Ewn ' Action to j $ al jdi g Report ,
hu p,, ,, g c.,,,,,
j d i
l h Nb N b YYY 0 Y ~~ $ $& U d 0 l Nby l
i l
1 2 3 4 F: Forced ""
- d Reason: Exhibit G lastrusik.ns 5: Sch.duled A Equipnient Failure (Explain) s.ttanval fw Pr ation of Data a u.w== of Test 2-Planual saran Entry a for Licensee C Refuelin. 3-Acte serme Event Repwe (LER) File (NUREG-R 4-centinued 0161)
- ng;d ""
D.RagulatLestric.
E o ,.r.to tion us.ne. Emi.e l
F Adminiarative 5 G4perational Erew(Emplain) Exhibis 1 Same Sousse 19/77) Hether(Emplain) l
NOVEMBER
SUMMARY
OF OPERATING EXPERIENCE UNIT l-The unit entered the reporting period at a power. level of 1052 MWe (99%
reactor power). The' unit remained on line the entire. report period, ending at a power level of 1053 MWe (99% reactor power) having and availability factor of 100% and a capacity factor of 97.7%.
Unit 2 The unit entered the report period shutdown for the continuation of . Cycle VIII-IX refueling outage. On December 26, at 2155 hours0.0249 days <br />0.599 hours <br />0.00356 weeks <br />8.199775e-4 months <br />, the unit was made critical. The unit remained critical for the remainder of the report period.
1052t 0505A
January Major Safety Related Maintenance Eauipment Work Performed 2A Charging pump room cooler Replaced Cooler 2A Containment spray pump motor Resurfaced bearings and shaft.
2B Containment spray pump discharge . Adjusted bypass breaker to compensate stop valve for pump pressure.
l Hydraulic control valve Reversed E2 & E3 to correct
- 2RH HCV606 direction of setpoint station output.
1C service water pump Removed grade 5 bolts and replaced with grade 8 bolts l
l l
l l
1052t l 0505A l
REFUELING INFORMATION REQUEST Questions:
- 1. Name of facility.
- 2. Scheduled date for next refueling shutdown.
- 3. Scheduled date for restart following refueling.
- 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?
If answer is yes, what, in general, will these be?
If answer is no~, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?
If no such review has taken place, when is it scheduled?
- 5. Scheduled date (s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been
- requested or is planned, in number of fuel assemblies.
- 9. .The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
i l
Page 1 of 3 1052t 0505A
Unit 1 - Answers
- 1. Zion Unit 1
- 2. June 26,1986,1s one scheduled date for the next refueling outage.
- 3. October 23, 1986 is the scheduled date for initial criticality following refueling.
- 4. A reload safety evaluation review will take place March 31, 1986 and may identify any unreviewed safety questions. The receipt of new fuel for the next Unit I refueling will require a Technical Specification change to allow on-site storage of fuel enriched up to 3.7 w/o U-235.
- 5. Changes have been submitted.
- 6. None
- 7. .The number of fuel assemblies a) in the core is 193, and b) in the spent fuel storage pool which have been discharged by Zion Unit 1 is 497.
' ~
- 8. The prese'nt licensed spent fuel pool storage capacity (shared with Zion Unit 2) is 2112 fuel assemblies. The installation of the new storage racks has been completed.
- 9. In 1995, Zion Station will lose full core discharge capability. This date is based on a December,1983 study.
Page 2 of 3 1052t 0505A
Unit 2 - Answers
- 1. Zion Unit 2
- 2. The Unit shutdown on September 6, 1985 for the current refueling outage.
- 3. January 26, 1986 the unit was made critical after refueling.
- 4. The January,1986 startup will require two Technical Specifications to be approved; they are for RCFC damper-removal and the reactor vessel specimen capsule withdrawal schedule.
- 5. Changes have been submitted.
- 6. None.
- 7. The number of fuel assemblies a) in the core is~193, and b) in the spent fuel storage pool which have been discharged by Zion Unit 2 is 511.
- 8. The present licensed spent fuel pool storage capacity (shared with Zion Unit 1) is 2112 fuel assemblies. The installation of the new storage racks has been completed.
- 9. In 1995, Zion Station will lose full core discharge capability. This date is based on a December,1983 study.
Page 3 of 3 1052t 0505A
Zion Station Offsite Dose Calculation manual Zion Sections 7,2 and 8.0 Revision 11 Revision 11 SECTION PAGE CHANGE Table 7.2-1/ Uw value (water usage) has been changed to the 7 . 2-1 value 0.083 liters /hr upon NRC reviewer's request to provide agreei?ent with Reg. Guide 1.109.
Figure 7.2-1 Unrestricted area boundary has been moved to the shore line since no control can be exerted on the lake.
8.1/8.1 -1 With NRC concurrence assumption b has been_ revised so the a constant radionuclide mix based on isotopic release data averaged over seven years (1977 through June 1984) is now used.
8.1/8.1 -4 Mis-typed valves RV001, RV0002, RV0003, and RV004 were corrected.
8.1/8.1-4 To add more specificty, the phrase "through valves RV0005 and RV0006" was added to the last sentence of paragraph one.
8.1/8.1-5 A discussion of the service building ventilation monitoring system has been added per NRC reviewer's request.
Table 8.1-1/8.1-8 The composition of the mix noted on page 8.1-1 was added.
Table 8.1-2/8.1-9 Corrected mis-typed valve RV0004.
Figure 8.1-1 Figure was added per NRC reviewer's request to clarify release pathway.
Figure 8.2-1 Figure was added per NRC reviewer's request to clarify release pathway.
Table 8.4-1, Item 2/8.4-3, 8.4-4 TLD locations have now been listed explicity for.
clarification, '
1052t 0505A
SECTION PAGE CHANGE Table 8.4-1, 'Per agreement with NRC staff, surface water (public Item 3/8.4-4 water supply) analysis to only require gamma isotopic and tritium analysis.
Table 8.4-1, Addition of tritium analysis ter cooling water sample Item 3/8.4-5 to this section based on NRC Reviewer's request.
Table 8.4-1 The sediment sample collection frequency was revised Item 3/8.4-5 to match Tech.' Spec. frequency.
Ta bl e . 8.4-1, Per agreement with NRC staf f, milk collection Item 4/8.4-5 changed to semi-monthly during grazing season.
Table 8.4-1 Addition of collection and analysis of food Item 4/8.4-6 products when milk sampling is not performed per NRC request.
Table 8.4-1/8.4-6 Footnotes to table revised to read correctly.at NRC reviewer's request.
Table 8.4-3/8.4-7 Reporting level table has been revised to be made consistent with Tech. Specs.
Table 81.4-2/
8.4.8 through 8.4-10 LLD table has been revisd to be consistent with Tech Specs per NRC reviewer's request.
Figure. 8.4-1 Figure has been updated to show water and milk sample locations.
Figure 8.4-2 Figure has been revised to reflect TLD numbering revision.
Figure 8.4-3 Figure has been revised to include water and fish sampling locations.
l t
1052t 0505A
. m
[h CommomvealthEdison O" 101 Shiloh Blvd.
Zion, minois 60099 February 7, 1986 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555
, Attention: Document Control Desk j
Dear Sir:
Enclosed please find the Operating Status Report for the month of January, 1986 for Zion Generating Station.
Very truly urs, G. .
4 Plimi St tion Manager Zion Station l GLA/ss Enclosure (11) cc: D. P. Galle J. G. Keppler (NRC)
L. D. Butterfield H. E. Bliss INPO R. Johnson Division of Env. Health