- 05000285/LER-1998-007, :on 980522,TS Violation of ISI Reporting Requirements,Was Noted.Caused by Interpretation of Requirements of 10CFR50.55a(g)(5)(iv) Which Differs from Nrc.Listing of Exams Given to NRC + (ML20249B873)
- 05000331/LER-1998-006, :on 980519,discovered That Visual Exam Had Not Been Performed on Standby Liquid Control Sys Explosive Valves Prior to Returning Sys to Svc.Caused by Failure to Identify Requirement to Perform VT-2 Exam.Procedure Revised + (ML20249B874)
- ML20249B875 + (ML20249B875)
- NOC-AE-000192, Forwards Response to Violations Noted in Insp Rept 50-499/98-05.Corrective Actions:Fire Watch Posted in 2A Isolation Valve Cubicle Until Wood Is Removed + (ML20249B876)
- ML20249B878 + (ML20249B878)
- ML20249B879 + (ML20249B879)
- ML20249B880 + (ML20249B880)
- 05000285/LER-1998-006, :on 980521,outside of Design Basis for LOCA W/Plant Shutdown Was Noted.Caused by Lack of Defined Design Basis for Operability Requirements.Updated USAR & Procedures to Include Operability Requirements + (ML20249B881)
- LIC-98-0082, Responds to NRC Re Violations Noted in Insp Rept 50-285/98-07 on 980415-0424.Corrective Actions:Oppd Adopted Policy to Note Achieved Exam Coverage on Each ISI Exam Rept + (ML20249B882)
- ML20249B883 + (ML20249B883)
- ML20249B884 + (ML20249B884)
- ML20249B885 + (ML20249B885)
- ML20249B886 + (ML20249B886)
- ML20249B888 + (ML20249B888)
- ML20249B889 + (ML20249B889)
- ML20249B890 + (ML20249B890)
- ML20249B892 + (ML20249B892)
- ML20249B893 + (ML20249B893)
- ML20249B894 + (ML20249B894)
- ML20249B895 + (ML20249B895)
- ML20249B897 + (ML20249B897)
- ML20249B899 + (ML20249B899)
- ML20249B900 + (ML20249B900)
- ML20249B901 + (ML20249B901)
- ML20249B902 + (ML20249B902)
- ML20249B903 + (ML20249B903)
- ML20249B904 + (ML20249B904)
- ML20249B905 + (ML20249B905)
- ML20249B906 + (ML20249B906)
- ML20249B907 + (ML20249B907)
- L-98-027, Forwards Rev 8 to Physical Security Plan.Encl 1 Identifies & Describes Plan Changes,Which Indicated W/Rev Bars in Left Margin of Physical Security Plan.Rev Withheld,Per 10CFR2.790(d) + (ML20249B908)
- ML20249B909 + (ML20249B909)
- ML20249B910 + (ML20249B910)
- ML20249B911 + (ML20249B911)
- RBG-44548, Forwards Response to Violations Noted in Insp Rept 50-458/98-05.Corrective Actions:Design Change Documents Implemented After 970511,as Result of High Negative Pressure Condition in Annulus & Auxiliary Bldg + (ML20249B912)
- ML20249B913 + (ML20249B913)
- ML20249B914 + (ML20249B914)
- ML20249B915 + (ML20249B915)
- ML20249B916 + (ML20249B916)
- ML20249B917 + (ML20249B917)
- ML20249B918 + (ML20249B918)
- ML20249B919 + (ML20249B919)
- ML20249B920 + (ML20249B920)
- ML20249B921 + (ML20249B921)
- ML20249B922 + (ML20249B922)
- ML20249B923 + (ML20249B923)
- ML20249B926 + (ML20249B926)
- ML20249B927 + (ML20249B927)
- ML20249B928 + (ML20249B928)
- ML20249B931 + (ML20249B931)
- ML20249B932 + (ML20249B932)