Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248D480 + (ML20248D480)
- ML20248D482 + (ML20248D482)
- ML20248D486 + (ML20248D486)
- ML20248D489 + (ML20248D489)
- ML20248D492 + (ML20248D492)
- ML20248D494 + (ML20248D494)
- ML20248D496 + (ML20248D496)
- ML20248D497 + (ML20248D497)
- ML20248D498 + (ML20248D498)
- ML20248D502 + (ML20248D502)
- ML20248D503 + (ML20248D503)
- SNRC-1621, Advises of Deferral of Completion of Certain ASLB Settlement Agreements or Commitments on Encl List & Deferral of Implementation of Inservice Insp & Inservice Testing Programs,Per Agreement W/State of Ny Not to Operate Plant + (ML20248D504)
- ML20248D508 + (ML20248D508)
- 05000499/LER-1989-020, :on 890829,all Three Operating Turbine Driven Feedwater Pumps Tripped.Caused by Momentary Interruption of Control Power to Feedwater Pump Overspeed Protection Circuits Due to Failure of Inverter + (ML20248D509)
- ML20248D510 + (ML20248D510)
- ML20248D515 + (ML20248D515)
- ML20248D517 + (ML20248D517)
- ML20248D518 + (ML20248D518)
- ML20248D521 + (ML20248D521)
- ML20248D522 + (ML20248D522)
- IR 05000341/1989023 + (ML20248D524)
- ML20248D527 + (ML20248D527)
- ML20248D529 + (ML20248D529)
- ML20248D531 + (ML20248D531)
- ML20248D533 + (ML20248D533)
- ML20248D537 + (ML20248D537)
- ML20248D538 + (ML20248D538)
- ML20248D539 + (ML20248D539)
- 05000271/LER-1998-010, :on 980428,determined That Installation of Wetwell Hardened Vent Sys Challenged Containment Systems in Event of Postulated Loca.Caused by Human Error.Closed Safety Class MOV in Vent Line as Interim Action + (ML20248D540)
- ML20248D543 + (ML20248D543)
- ML20248D545 + (ML20248D545)
- ML20248D547 + (ML20248D547)
- ML20248D549 + (ML20248D549)
- ML20248D550 + (ML20248D550)
- NPL-98-0438, Submits Suppl to Extend Commitment Date Re Response to Violations Noted in Insp Repts 50-266/97-15 & 50-301/97-15. Hardware Changes to Enhance Availability of Lights Have Been Identified + (ML20248D551)
- ML20248D553 + (ML20248D553)
- ML20248D554 + (ML20248D554)
- PY-CEI-NRR-2283, Responds to NRC Re Violations Noted in Insp Rept 50-440/98-07.Corrective Actions:Individual Involved in Tagging Error Completed Remediation Program & Resumed Related Responsibilities & Personnel Briefed on Tagging + (ML20248D555)
- U-601497, Responds to NRC Requesting Addl Info Re Response to Violations Noted in Insp Rept 50-461/89-03.Corrective Action:Computerized Link Between Existing Controlled Document & Work Package Computer Data Bases Being Developed + (ML20248D559)
- ML20248D561 + (ML20248D561)
- B13356, Forwards Inservice Insp Summary Rept for Northeast Utils Millstone Nuclear Power Station Unit 1 1989 Refueling Outage, Per ASME Code Section XI & Tech Spec 6.9.2.a + (ML20248D562)
- ML20248D563 + (ML20248D563)
- ML20248D567 + (ML20248D567)
- 0CAN059809, Provides Required Info for Plant Re Errors or Changes in Eccs,Sys Evaluation for Annual Rept for 1997.CECPD-279,Suppl 9 Rept Encl + (ML20248D568)
- ML20248D569 + (ML20248D569)
- ML20248D570 + (ML20248D570)
- ML20248D573 + (ML20248D573)
- ML20248D574 + (ML20248D574)
- ML20248D576 + (ML20248D576)
- ML20248D577 + (ML20248D577)
- ML20248D578 + (ML20248D578)