Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248D440 + (ML20248D440)
- ML20248D441 + (ML20248D441)
- ML20248D446 + (ML20248D446)
- ML20248D448 + (ML20248D448)
- ML20248D449 + (ML20248D449)
- 05000321/LER-1989-003-01, :on 890302,determined That Monthly Functional Test Required by Tech Specs Tables 4.1-1 & 4.2-9 Not Performed Since 881210.Caused by Software Deficiency.Test Performed & Surveillance Task Reactivated + (ML20248D450)
- ML20248D452 + (ML20248D452)
- ML20248D454 + (ML20248D454)
- ML20248D459 + (ML20248D459)
- ML20248D461 + (ML20248D461)
- ML20248D463 + (ML20248D463)
- ML20248D464 + (ML20248D464)
- ML20248D465 + (ML20248D465)
- ML20248D466 + (ML20248D466)
- B13330, Responds to NRC Bulletin 88-003, Inadequate Latch Engagement in HFA-Type Latching Relays Mfg by Ge. Insp of 46 Relays Considered Class 1E Completed.Five Deficient Relays Replaced + (ML20248D469)
- ML20248D470 + (ML20248D470)
- ML20248D472 + (ML20248D472)
- ML20248D480 + (ML20248D480)
- ML20248D482 + (ML20248D482)
- ML20248D486 + (ML20248D486)
- ML20248D489 + (ML20248D489)
- ML20248D492 + (ML20248D492)
- ML20248D494 + (ML20248D494)
- ML20248D496 + (ML20248D496)
- ML20248D497 + (ML20248D497)
- ML20248D498 + (ML20248D498)
- ML20248D502 + (ML20248D502)
- ML20248D503 + (ML20248D503)
- SNRC-1621, Advises of Deferral of Completion of Certain ASLB Settlement Agreements or Commitments on Encl List & Deferral of Implementation of Inservice Insp & Inservice Testing Programs,Per Agreement W/State of Ny Not to Operate Plant + (ML20248D504)
- ML20248D508 + (ML20248D508)
- 05000499/LER-1989-020, :on 890829,all Three Operating Turbine Driven Feedwater Pumps Tripped.Caused by Momentary Interruption of Control Power to Feedwater Pump Overspeed Protection Circuits Due to Failure of Inverter + (ML20248D509)
- ML20248D510 + (ML20248D510)
- ML20248D515 + (ML20248D515)
- ML20248D517 + (ML20248D517)
- ML20248D518 + (ML20248D518)
- ML20248D521 + (ML20248D521)
- ML20248D522 + (ML20248D522)
- IR 05000341/1989023 + (ML20248D524)
- ML20248D527 + (ML20248D527)
- ML20248D529 + (ML20248D529)
- ML20248D531 + (ML20248D531)
- ML20248D533 + (ML20248D533)
- ML20248D537 + (ML20248D537)
- ML20248D538 + (ML20248D538)
- ML20248D539 + (ML20248D539)
- 05000271/LER-1998-010, :on 980428,determined That Installation of Wetwell Hardened Vent Sys Challenged Containment Systems in Event of Postulated Loca.Caused by Human Error.Closed Safety Class MOV in Vent Line as Interim Action + (ML20248D540)
- ML20248D543 + (ML20248D543)
- ML20248D545 + (ML20248D545)
- ML20248D547 + (ML20248D547)
- ML20248D549 + (ML20248D549)
- ML20248D550 + (ML20248D550)