Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000423/1989012 + (ML20247L930)
- ML20247L931 + (ML20247L931)
- ML20247L933 + (ML20247L933)
- ML20247L935 + (ML20247L935)
- ML20247L936 + (ML20247L936)
- ML20247L940 + (ML20247L940)
- ML20247L941 + (ML20247L941)
- ML20247L943 + (ML20247L943)
- ML20247L947 + (ML20247L947)
- RBG-31280, NPDES Noncompliance Notification:On 890719,estimated 22,250 Gallons Wastewater Released.Cause of Excursion Unknown.Util Continuing Investigation Into Exact Cause of Total Suspended Solids & Will Provide Further Info in Subsequent Ltr + (ML20247L948)
- ML20247L949 + (ML20247L949)
- ML20247L950 + (ML20247L950)
- ML20247L954 + (ML20247L954)
- 05000413/LER-1989-012, :on 890107,6,900-volt Tie Breaker Tripped After Reactor Coolant Pump 1C Started,Causing Blackout & Loss of Power to RHR Pump,Fuel Cooling Pump & Component Cooling Pump.Caused by Error in Relay Installation + (ML20247L956)
- ML20247L958 + (ML20247L958)
- ML20247L960 + (ML20247L960)
- IA-89-326, Advises That Proposed Objectives for 1989 Annual Exercise of Radiological Emergency Plan Acceptable for Intended Purpose + (ML20247L961)
- ML20247L961 + (ML20247L961)
- ML20247L963 + (ML20247L963)
- IR 05000298/1989022 + (ML20247L964)
- 05000410/LER-1989-003, Forwards Corrected Copy of LER 89-003-00 Submitted on 890320.Typo Identified on Page 5 of 7 Corrected + (ML20247L966)
- 05000413/LER-1988-026, :on 881126,static Inverter 1EID & 120-volt Ac Power Panelboard Experienced Undervoltage Condition for Approx 2 & Multiple ESF Alarms Displayed.Caused by Low Voltage Condition in Inverter + (ML20247L967)
- ML20247L969 + (ML20247L969)
- SVP-98-175, Informs NRC of Status of Plant Voluntary pre-startup Commitments, & Internal Assessment of Restart Readiness + (ML20247L971)
- ML20247L974 + (ML20247L974)
- ML20247L976 + (ML20247L976)
- ML20247L979 + (ML20247L979)
- ML20247L980 + (ML20247L980)
- PLA-3194, Forwards Change CC to Physical Security Plan.Change Withheld (Ref 10CFR73.21) + (ML20247L981)
- ML20247L983 + (ML20247L983)
- ML20247L984 + (ML20247L984)
- ML20247L986 + (ML20247L986)
- ML20247L987 + (ML20247L987)
- IR 05000295/1989025 + (ML20247L988)
- ML20247L991 + (ML20247L991)
- 05000313/LER-1988-030, :on 890620,determined That Unacceptable Modeling Technique Used in Stress Calculations,Potentially Affecting Seismic Capabilities of Eccs.Mods of Affecting Piping Completed + (ML20247L993)
- ML20247L994 + (ML20247L994)
- HL-5629, Agrees on Behalf of Util That Util Will Comply W/Listed Commitment Re Implementation of Thermo-Lag Fire Barrier Corrective Actions at Plant + (ML20247L996)
- ML20247L997 + (ML20247L997)
- ML20247L998 + (ML20247L998)
- ML20247M000 + (ML20247M000)
- ML20247M001 + (ML20247M001)
- ML20247M003 + (ML20247M003)
- ML20247M004 + (ML20247M004)
- ML20247M006 + (ML20247M006)
- ML20247M008 + (ML20247M008)
- ML20247M010 + (ML20247M010)
- ML20247M012 + (ML20247M012)
- ML20247M016 + (ML20247M016)
- ML20247M018 + (ML20247M018)
- ML20247M020 + (ML20247M020)