Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000309/LER-1988-005, :on 880523,potential Harsh Environ Postulated for Unqualified Solenoid Valves.Emergency Operating Procedures Revised to Manually Isolate Vent Lines Following Safety Injection Actuation Signal + (ML20247L725)
- IR 05000382/1989017 + (ML20247L726)
- ML20247L727 + (ML20247L727)
- ML20247L728 + (ML20247L728)
- ML20247L729 + (ML20247L729)
- ML20247L731 + (ML20247L731)
- ML20247L732 + (ML20247L732)
- IR 05000338/1989008 + (ML20247L737)
- ML20247L738 + (ML20247L738)
- ML20247L739 + (ML20247L739)
- ML20247L740 + (ML20247L740)
- ML20247L741 + (ML20247L741)
- IR 05000498/1989020 + (ML20247L745)
- ML20247L749 + (ML20247L749)
- IR 05000443/1989004 + (ML20247L751)
- 05000263/LER-1998-002-02, :on 980415,main Steam Isolation Valve Position Setpoint Outside Allowed Range,Was Found.Caused by Previous Testing Technique & Use of Particular Switch Model.Eight New Position Switches W/Less Deadband Installed + (ML20247L752)
- ML20247L754 + (ML20247L754)
- ML20247L755 + (ML20247L755)
- ML20247L756 + (ML20247L756)
- ML20247L757 + (ML20247L757)
- ML20247L758 + (ML20247L758)
- ML20247L759 + (ML20247L759)
- ML20247L761 + (ML20247L761)
- ML20247L762 + (ML20247L762)
- ML20247L765 + (ML20247L765)
- ML20247L768 + (ML20247L768)
- ML20247L769 + (ML20247L769)
- B13301, Forwards Nonproprietary Version of Documenting Fuel Assembly Repair Program & Informs That Util Experienced Problem W/Fuel Shipment from GE for Cycle 12 Refueling Outage.W/O Encl + (ML20247L774)
- ML20247L775 + (ML20247L775)
- IR 05000219/1989012 + (ML20247L778)
- ML20247L780 + (ML20247L780)
- ML20247L784 + (ML20247L784)
- ML20247L785 + (ML20247L785)
- ML20247L786 + (ML20247L786)
- ML20247L787 + (ML20247L787)
- IR 05000245/1989005 + (ML20247L788)
- ML20247L789 + (ML20247L789)
- ML20247L792 + (ML20247L792)
- ML20247L794 + (ML20247L794)
- ML20247L795 + (ML20247L795)
- ML20247L796 + (ML20247L796)
- ML20247L799 + (ML20247L799)
- ML20247L802 + (ML20247L802)
- ML20247L803 + (ML20247L803)
- 05000313/LER-1988-020-01, :on 881103,nonsafety-related Ventilation Sys Affected Penetration Room Ventilation Sys Capability to Process Penetration Leakage Following Design Basis Accident. Caused by Failure to Assess Sys Impact + (ML20247L806)
- ML20247L807 + (ML20247L807)
- 0CAN078910, Responds to Violations Noted in Insp Repts 50-313/89-18 & 50-368/89-18.Corrective Action:Individual Reprimanded for Failing to Adhere to Procedure Requirements.Individual Who Prepared Matl Ticket No Longer Employed on-site + (ML20247L808)
- 05000336/LER-1988-008, :on 880408,control Element Assembly (CEA) 22 Dropped Into Core & on 890409,CEA 4 Dropped Into Core.Caused by Overheating of Upper Gripper Coil Due to Air Flow Blockage of Hx.Coils & Loose Wire Replaced + (ML20247L810)
- ML20247L811 + (ML20247L811)
- IR 05000317/1989006 + (ML20247L812)
- ML20247L814 + (ML20247L814)