_ - _ .
u .: ,
e
,
'
'
.
'
+a
JUL 211989
L
>
,
Docket / License Nos.~: 50-317/DPR-53
50-318/DPR-69
1
Baltimore Gas and~ Electric Company
1 ATTN: -Mr. George C. Creel:
Vice President, Nuclear Energy
'Calvert Cliffs Nuclear Power Plant
i
- MD. Routes 2 & 4
Post Office Box 1535
Lusby, Maryland 20657
Gentlemen:
l'$
L
Subject: NRC Region-I Combined Inspection Report Nos. 50-317/89-06 and
50-318/89-06
'This. transmits the April 4 - May 15,1989, resident inspection findings by
Messrs. H. Eichenholz and V. Pritchett at the Calve'rt. Cliffs'. Nuclear Power
Plant, . Lusby,' Maryland.
Those findings were based on observation of 'activ-
ities,
interviews,-~and ' document. reviews, which have been discussed with
Mr. Russell of your . staff.
.
An apparent violation of NRC requirements is cited in Appendix A and categor--
s
ized under the NRC Enforcement Policy, 10 CFR 2, Appendix C.
A reply is -
'
required in accordance with Appendix A.
The requirement that -you' reply. is
exempt. from clearance by the Office of Management and Budget under the- Paper-
~
work Reduction Act of 1980, PL 96-511.
We ' continue to observe difficulties in the identification of items and
procedural' changes -requiring safety evaluation and review by the ~ Plant Onsite
Safety Review Committee as required by 10 CFR 50.59 and the Technical
- Specifications (See Report Details Section 4). There is an apparent lack of
adequate . instructions in your control procedures to identify what represents
changes to-safety related systems requiring prior review and approval. This is
of concern to the NRC since the lack of sufficient control and definition of
change of procedural intent could result in reoccurrence of the events similar
to that discussed in Section 4.1 and potential configuration problems for
safety related systems.
Your response to the ' enclosed Notice of Violation
-should also address this issue.
'%
OFFICIAL RECORD COPY
CIR CC 89-06 - 0001.0.0
,
_
07/19/89
[
8908010349 890721
g
Q
- r
C)'
.PDR- ADOCK 05000317
,
.
_
. - -
.
1-
1
'
~
r
'
'
Baltimore Gas and Electric Company
2
g
Your cooperation with us is appreciated.
Sincerely,
&issal SICTd By
James 1. Wiggins, Chief
Reactor Projects Branch No. 1
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Combined Inspection Report Nos. 50-317/89-06 and 50-318/89-06
cc w/encls:
J. Lippold, General Supervisor, Technical Services Engineering
T. Magette, Administrator, Nuclear Evaluations
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maryland (2)
bec w/encis:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encis)
J. Wiggins, DRP
L. Tripp, DRP
D. Limroth, DRP
S. McNeil, NRR
4
1l
/ f
'
'
!
1P
I DRP
R :DRP
'Id:DRP
'
!
tchett/mjd
Eichenholz
LTripp
JWiggins
I
,
7/1/89
I
7/1/89
7/1 /89
7/)[)/89
0FFICIAL RECORD COPY
CIR CC 89-06 - 0002.0.0
!
07/06/89
!
!
e
u_______.__
__ _
l