Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20237D924 + (ML20237D924)
- ML20237D925 + (ML20237D925)
- ML20237D926 + (ML20237D926)
- ML20237D927 + (ML20237D927)
- ML20237D928 + (ML20237D928)
- ML20237D929 + (ML20237D929)
- 05000353/LER-1998-006, Forwards LER 98-006-00 Re Failure to Perform 4KV Emergency D24 Bus Undervoltage Channel Calibr Surveillance Test Prior to TS Due Date.Cause of 980726 Event Is Attributed to Personnel Error + (ML20237D930)
- ML20237D933 + (ML20237D933)
- 05000353/LER-1998-006-01, :on 980726,noted Failure to Perform 4KV Emergency D24 Bus Undervoltage Channel Calibr Surveillance Test Prior to TS Due Date.Caused by Personnel Error. Counseled Personnel & Conducted Training Re Event + (ML20237D938)
- ML20237D940 + (ML20237D940)
- ML20237D941 + (ML20237D941)
- ML20237D942 + (ML20237D942)
- ML20237D944 + (ML20237D944)
- ML20237D945 + (ML20237D945)
- ML20237D946 + (ML20237D946)
- ML20237D947 + (ML20237D947)
- ML20237D949 + (ML20237D949)
- TXX-7082, Final Deficiency Rept CP-87-87 Re Chemical Vol & Control Sys Relief Valve Piping.Initially Reported 870903.Valve Will Be Relocated in Order to Comply W/Asme Boiler & Pressure Valve Code Requirements + (ML20237D952)
- ML20237D954 + (ML20237D954)
- ML20237D955 + (ML20237D955)
- ML20237D956 + (ML20237D956)
- ML20237D957 + (ML20237D957)
- ML20237D958 + (ML20237D958)
- ML20237D959 + (ML20237D959)
- TXX-7054, Final Deficiency Rept CP-87-118 Re Steam Generator Blowdown Isolation.Initially Reported on 871023.Use of non-nuclear Safety Detection & Control to Isolate Steam Generator Blowdown Lines Not Deficiency in Design or Const + (ML20237D961)
- TXX-7031, Supplemental Deficiency Rept CP-86-46 & Interim Deficiency Rept CP-86-76 Re Gould Battery Racks.Initially Reported on 861021.Deficient Battery Racks Will Be Disassembled,Reworked & Components Replaced as Necessary.Next Rept by 880308 + (ML20237D962)
- ML20237D963 + (ML20237D963)
- ST-HL-AE-2442, Final Deficiency Rept Re Class 1E Cable Splices.Initially Reported on 870918.Stop Work Order F-02 Issued on 871001, Stopping Installation of All Raychem Matl in Class 1E Electrical Cable Splices + (ML20237D964)
- PY-CEI-NRR-2291, Requests Relief Per 10CFR50.55a(g)(5)(iii) & (IV) from Certain Exam Requirements of Section XI of ASME Boiler & Pressure Vessel Code.Summaries of Proposed Relief Requests & Detailed Relief Requests,Encl + (ML20237D965)
- TXX-7003, Interim Deficiency Rept CP-87-97 Re Flexible Conduit Insps QC Records.Initially Reported on 870908.Stated Conditions Identified in Corrective Action Request CAR-075.Evaluation Continuing.Next Rept Anticipated by 880314 + (ML20237D966)
- ML20237D969 + (ML20237D969)
- TXX-6994, Interim Deficiency Rept CP-86-38 Re Traceability of 1E Pigtail Extensions.Initially Reported on 860527.Caused by Failure of Procedures to Adequately Address Installation & Insp Criteria.Next Rept Will Be Issued by 880301 + (ML20237D970)
- ML20237D972 + (ML20237D972)
- ML20237D973 + (ML20237D973)
- ML20237D974 + (ML20237D974)
- ML20237D975 + (ML20237D975)
- ML20237D977 + (ML20237D977)
- ML20237D980 + (ML20237D980)
- ML20237D982 + (ML20237D982)
- ML20237D984 + (ML20237D984)
- ML20237D987 + (ML20237D987)
- ML20237D988 + (ML20237D988)
- ML20237D989 + (ML20237D989)
- ML20237D990 + (ML20237D990)
- ML20237D991 + (ML20237D991)
- ML20237D992 + (ML20237D992)
- PNO-II-98-037A, on 980807,update Shutdown in Excess of 72 H Made.Licensee Has Cleaned & Satisfactorily Inspected IC Flow Channels.Licensee Identified Discrepancies in Bolting of IC Intermediate Deck Door Frames & Hinges.Conditions Addressed + (ML20237D993)
- ML20237D994 + (ML20237D994)
- ML20237D995 + (ML20237D995)
- ML20237D997 + (ML20237D997)
- ML20237D998 + (ML20237D998)