Category:INSPECTION REPORT
MONTHYEARIR 05000338/19990031999-07-0202 July 1999 Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19990011999-04-12012 April 1999 Insp Repts 50-338/99-01 & 50-339/99-01 on 990131-0313. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.In Addition,Results of Insp by Region Based Fire Protection Specialist Encl IR 05000338/19980111999-03-0101 March 1999 Insp Repts 50-338/98-11 & 50-339/98-11 on 981220-990130.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000338/19980101999-01-14014 January 1999 Insp Repts 50-338/98-10 & 50-339/98-10 on 981108-1219.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196H4131998-11-0505 November 1998 Insp Repts 50-338/98-05 & 50-339/98-05 on 980713-31 & 0921- 25.Violation Noted.Major Areas Inspected:Review of Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Documents Used to Support Design & Performance IR 05000338/19980071998-08-18018 August 1998 Insp Repts 50-338/98-07 & 50-339/98-07 on 980720-23.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for North Anna Nuclear Station ML20216H6711998-04-0303 April 1998 Insp Repts 50-338/98-01,50-338/98-01 & 72-0016/98-01 on 980125-0307.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970111998-01-12012 January 1998 Insp Repts 50-338/97-11,50-339/97-11 & 72-0016/97-04 on 971102-1213.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970101997-10-0707 October 1997 Partially Withheld Insp Repts 50-338/97-10 & 50-339/97-10 on 970922-23 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plant Support by Regional Safeguards Specalist IR 05000338/19970041997-07-21021 July 1997 Insp Repts 50-338/97-04 & 50-339/97-04 on 970518-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19970051997-07-15015 July 1997 Insp Repts 50-338/97-05 & 50-339/97-05 on 970616-20.No Violations Noted.Major Areas Inspected:Plant Support ML20140F2651997-06-0606 June 1997 Insp Repts 50-338/97-03 & 50-339/97-03 on 970406-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000338/19970021997-05-0505 May 1997 Insp Repts 50-338/97-02 & 50-339/97-02 on 970223-0405.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137F7661997-03-21021 March 1997 Insp Repts 50-338/97-01 & 50-339/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19960131997-02-0707 February 1997 Insp Repts 50-338/96-13 & 50-339/96-13 on 961208-970111.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133J1991997-01-0606 January 1997 Insp Repts 50-338/96-12 & 50-339/96-12 on 961102-1207. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000338/19960101996-12-0202 December 1996 Insp Repts 50-338/96-10 & 50-339/96-10 on 960922-1102. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000338/19960111996-11-15015 November 1996 Insp Repts 50-338/96-11 & 50-339/96-11 on 961014-18.No Violations Noted.Major Areas Inspected:Plant Support ML20134G9071996-10-21021 October 1996 Insp Repts 50-338/96-09 & 50-339/96-09 on 960811-0921. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128K0591996-09-30030 September 1996 Insp Repts 50-338/96-08 & 50-339/96-08 on 960812-16.No Violations Noted.Major Areas Inspected:Cr Simulator,Tsc,Osc, EOF, & Joint Info Ctr IR 05000338/19960071996-09-0909 September 1996 Insp Repts 50-338/96-07 & 50-339/96-07 on 960810.Violations Noted.Major Areas Inspected:Licensee Operations,Engineers, Maint & Plant Support IR 05000338/19940291994-12-29029 December 1994 Partially Withheld Insp Repts 50-338/94-29 & 50-339/94-29 on 941128-1202 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000338/19930291994-01-12012 January 1994 Insp Repts 50-338/93-29 & 50-339/93-29 on Stated Date.No Violations Noted.Major Areas Inspected:Plant Status,Ler Followup,Safety Verification,Maintenance Observation, Surveillance Observation & Cold Weather Preparations ML20059B2881993-12-14014 December 1993 Insp Repts 50-338/93-27 & 50-339/93-27 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation & Surveillance Observation IR 05000338/19930241993-11-15015 November 1993 Insp Repts 50-338/93-24 & 50-339/93-24 on 930919-1016.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation, Surveillance Observation & LER Followup IR 05000338/19930281993-10-29029 October 1993 Insp Repts 50-338/93-28 & 50-339/93-28 on 931014-20. Violations Noted.Major Areas Inspected:Circumstances Surrounding Unit 2 High Head Safety Injection Subsystem Not Meeting TS Min Flow Requirement on 931014 IR 05000338/19930261993-10-27027 October 1993 Insp Repts 50-338/93-26 & 50-339/93-26 on 930927-1001.No Violations or Deviations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Involving Review of HP Activities Primarily Associated W/Unit 2 Refueling Outage IR 05000338/19930211993-10-20020 October 1993 Insp Repts 50-338/93-21 & 50-339/93-21 on 930920-24.No Violations Noted.Major Areas Inspected:Organization of Chemistry Dept & Units Responsible for Handling & Shipping of Radioactive Matl & Plant Water Chemistry IR 05000338/19930231993-10-15015 October 1993 Insp Repts 50-338/93-23 & 50-339/93-23 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Status, Operational Verification,Maint Observation,Training & Action on Previous Insp Items IR 05000338/19930251993-10-13013 October 1993 Insp Repts 50-338/93-25 & 50-339/93-25 on 930914-17.No Violations Noted.Major Areas Inspected:Eddy Current Exam of Steam Generator Tubes IR 05000338/19930201993-09-17017 September 1993 Insp Repts 50-338/93-20 & 50-339/93-20 on 930718-0821.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maint Observation, Surveillance Observation & Action on Previous Insp Items ML20056E8651993-08-0404 August 1993 Insp Repts 50-338/93-19 & 50-339/93-19 on 930620-0717. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Plant Status & Surveillance Observation ML20056D1671993-07-13013 July 1993 Insp Repts 50-338/93-18 & 50-339/93-18 on 930509-0619. Violations Noted.Major Areas Inspected:Examinations of Procedures & Representative Records,Interviews W/Personnel & Observaton of Activities in Progress IR 05000338/19930091993-03-24024 March 1993 Insp Repts 50-338/93-09 & 50-339/93-09 on 930208-12 & 22-55. No Violations Noted.Major Areas Inspected:Fitup,Preheat & Fabrication of Field Welds,Weld Repairs,Nde & Review of Fabrication Records IR 05000338/19930081993-03-15015 March 1993 Insp Repts 50-338/93-08 & 50-339/93-08 on 930117-0220. Violation Noted.Major Areas Inspected:Plant Status,License Event Rept & Surveillance Observation IR 05000338/19930011993-03-12012 March 1993 Insp Repts 50-338/93-01 & 50-339/93-01 on 930115-0211.Two Noncited Violations Identified.Major Areas Inspected:Program Organization & Mgt Controls,Hp Technician Training & Operational & Administrative Controls IR 05000338/19930061993-02-11011 February 1993 Partially Withheld Insp Repts 50-338/93-06 & 50-339/93-06 on 930125-29.No Violations Noted.Major Areas Inspected: Physical Security Program,Including Protected Vital Area Barriers.Portions Withheld (Ref 10CFR2.790) IR 05000338/19930051993-02-0505 February 1993 Insp Repts 50-338/93-05 & 50-339/93-05 on 930111-15.No Violations or Deviations Noted.Major Areas Inspected:Control of Heavy Loads in Containment & Crane Insps to Be Performed During SG Replacement Project IR 05000338/19930021993-02-0303 February 1993 Insp Repts 50-338/93-02 & 50-339/93-02 on 930104-08.No Violations Noted.Major Areas Inspected:Design Changes & Mod,Engineering Support Activities & Licensee Event Rept Followup IR 05000338/19920291993-01-13013 January 1993 Insp Repts 50-338/92-29 & 50-339/92-29 on 921122-1219.No Violations Noted.Major Areas Inspected:Operations,Maint, Minor Mods,Surveillances & Action on Previous Insp Findings IR 05000338/19920261992-12-31031 December 1992 Insp Repts 50-338/92-26 & 50-339/92-26 on 921130-1204.No Violations Noted.Major Areas Inspected:Organization & Staffing,Radiation Protection Training,Procedures & Work Controls ML20126E3431992-12-23023 December 1992 Insp Repts 50-338/92-30 & 50-339/92-30 on 921130-1204. Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans,Protected & Vital Area Barriers, Detection & Power Supply.Rept Partially Withheld IR 05000338/19920311992-12-17017 December 1992 Insp Repts 50-338/92-31 & 50-339/92-31 on 921207-10.No Violations or Deviations Noted.Major Areas Inspected: Emergency Operating Procedure & Abnormal Operating Procedure Followup IR 05000338/19920271992-12-16016 December 1992 Insp Repts 50-338/92-27 & 50-339/92-27 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:Primary Water Plant Chemistry,Confirmatory Measurements of non-radiological Samples & Radiological REMP IR 05000338/19920281992-12-15015 December 1992 Insp Repts 50-338/92-28 & 50-339/92-28 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:To Observe Certain Activities in Preparation for SG Replacement Project in Unit 1 & to Review Approved Welding Procedures IR 05000338/19920231992-12-11011 December 1992 Insp Repts 50-338/92-23 & 50-339/92-23 on 921018-1121.No Violations or Deviations Noted.Major Areas Inspected:Minor Mods,Operations,Maintenance,Surveillance,Esf Walkdown,Ler Followup & Actions on Previous Insp Findings IR 05000338/19920251992-11-25025 November 1992 Insp Repts 50-338/92-25 & 50-339/92-25 on 921102-06.No Violations Noted.Weaknesses Noted Re Heavy Loads Program. Major Areas inspected:post-refueling Startup Tests,Routine Surveillance of Core Performance & Control of Heavy Loads IR 05000280/19910221991-08-23023 August 1991 Insp Repts 50-280/91-22,50-281/91-22,50-338/91-18 & 50-339/91-18 on 910731 & 0801-02.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Pipe Wall Thinning Insp & Replacement Program IR 05000338/19910041991-03-0606 March 1991 Insp Repts 50-338/91-04 & 50-339/91-04 on 910128-0201.Major Areas Inspected:Observation of Inservice Insp Work Activities & Reactive Issues Re Relief Request for Noncode Repair on Unit 2 IR 05000338/19900251990-11-19019 November 1990 Insp Repts 50-338/90-25 & 50-339/90-25 on 900916-1020. Noncited Violation Noted.Major Areas Inspected:Operations, Maint,Surveillance,Mods,Operational Event Followup,Midloop Operations,Ler Followup & Action on Previous Insp Items 1999-07-02
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000338/19990031999-07-0202 July 1999 Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19990011999-04-12012 April 1999 Insp Repts 50-338/99-01 & 50-339/99-01 on 990131-0313. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.In Addition,Results of Insp by Region Based Fire Protection Specialist Encl IR 05000338/19980111999-03-0101 March 1999 Insp Repts 50-338/98-11 & 50-339/98-11 on 981220-990130.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000338/19980101999-01-14014 January 1999 Insp Repts 50-338/98-10 & 50-339/98-10 on 981108-1219.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196H4131998-11-0505 November 1998 Insp Repts 50-338/98-05 & 50-339/98-05 on 980713-31 & 0921- 25.Violation Noted.Major Areas Inspected:Review of Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Documents Used to Support Design & Performance IR 05000338/19980071998-08-18018 August 1998 Insp Repts 50-338/98-07 & 50-339/98-07 on 980720-23.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for North Anna Nuclear Station ML20216H6711998-04-0303 April 1998 Insp Repts 50-338/98-01,50-338/98-01 & 72-0016/98-01 on 980125-0307.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970111998-01-12012 January 1998 Insp Repts 50-338/97-11,50-339/97-11 & 72-0016/97-04 on 971102-1213.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970101997-10-0707 October 1997 Partially Withheld Insp Repts 50-338/97-10 & 50-339/97-10 on 970922-23 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plant Support by Regional Safeguards Specalist IR 05000338/19970041997-07-21021 July 1997 Insp Repts 50-338/97-04 & 50-339/97-04 on 970518-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19970051997-07-15015 July 1997 Insp Repts 50-338/97-05 & 50-339/97-05 on 970616-20.No Violations Noted.Major Areas Inspected:Plant Support ML20140F2651997-06-0606 June 1997 Insp Repts 50-338/97-03 & 50-339/97-03 on 970406-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000338/19970021997-05-0505 May 1997 Insp Repts 50-338/97-02 & 50-339/97-02 on 970223-0405.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137F7661997-03-21021 March 1997 Insp Repts 50-338/97-01 & 50-339/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19960131997-02-0707 February 1997 Insp Repts 50-338/96-13 & 50-339/96-13 on 961208-970111.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133J1991997-01-0606 January 1997 Insp Repts 50-338/96-12 & 50-339/96-12 on 961102-1207. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000338/19960101996-12-0202 December 1996 Insp Repts 50-338/96-10 & 50-339/96-10 on 960922-1102. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000338/19960111996-11-15015 November 1996 Insp Repts 50-338/96-11 & 50-339/96-11 on 961014-18.No Violations Noted.Major Areas Inspected:Plant Support ML20134G9071996-10-21021 October 1996 Insp Repts 50-338/96-09 & 50-339/96-09 on 960811-0921. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128K0591996-09-30030 September 1996 Insp Repts 50-338/96-08 & 50-339/96-08 on 960812-16.No Violations Noted.Major Areas Inspected:Cr Simulator,Tsc,Osc, EOF, & Joint Info Ctr IR 05000338/19960071996-09-0909 September 1996 Insp Repts 50-338/96-07 & 50-339/96-07 on 960810.Violations Noted.Major Areas Inspected:Licensee Operations,Engineers, Maint & Plant Support IR 05000338/19940291994-12-29029 December 1994 Partially Withheld Insp Repts 50-338/94-29 & 50-339/94-29 on 941128-1202 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000338/19930291994-01-12012 January 1994 Insp Repts 50-338/93-29 & 50-339/93-29 on Stated Date.No Violations Noted.Major Areas Inspected:Plant Status,Ler Followup,Safety Verification,Maintenance Observation, Surveillance Observation & Cold Weather Preparations ML20059B2881993-12-14014 December 1993 Insp Repts 50-338/93-27 & 50-339/93-27 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation & Surveillance Observation IR 05000338/19930241993-11-15015 November 1993 Insp Repts 50-338/93-24 & 50-339/93-24 on 930919-1016.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation, Surveillance Observation & LER Followup IR 05000338/19930281993-10-29029 October 1993 Insp Repts 50-338/93-28 & 50-339/93-28 on 931014-20. Violations Noted.Major Areas Inspected:Circumstances Surrounding Unit 2 High Head Safety Injection Subsystem Not Meeting TS Min Flow Requirement on 931014 IR 05000338/19930261993-10-27027 October 1993 Insp Repts 50-338/93-26 & 50-339/93-26 on 930927-1001.No Violations or Deviations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Involving Review of HP Activities Primarily Associated W/Unit 2 Refueling Outage IR 05000338/19930211993-10-20020 October 1993 Insp Repts 50-338/93-21 & 50-339/93-21 on 930920-24.No Violations Noted.Major Areas Inspected:Organization of Chemistry Dept & Units Responsible for Handling & Shipping of Radioactive Matl & Plant Water Chemistry IR 05000338/19930231993-10-15015 October 1993 Insp Repts 50-338/93-23 & 50-339/93-23 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Status, Operational Verification,Maint Observation,Training & Action on Previous Insp Items IR 05000338/19930251993-10-13013 October 1993 Insp Repts 50-338/93-25 & 50-339/93-25 on 930914-17.No Violations Noted.Major Areas Inspected:Eddy Current Exam of Steam Generator Tubes IR 05000338/19930201993-09-17017 September 1993 Insp Repts 50-338/93-20 & 50-339/93-20 on 930718-0821.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maint Observation, Surveillance Observation & Action on Previous Insp Items ML20056E8651993-08-0404 August 1993 Insp Repts 50-338/93-19 & 50-339/93-19 on 930620-0717. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Plant Status & Surveillance Observation ML20056D1671993-07-13013 July 1993 Insp Repts 50-338/93-18 & 50-339/93-18 on 930509-0619. Violations Noted.Major Areas Inspected:Examinations of Procedures & Representative Records,Interviews W/Personnel & Observaton of Activities in Progress IR 05000338/19930091993-03-24024 March 1993 Insp Repts 50-338/93-09 & 50-339/93-09 on 930208-12 & 22-55. No Violations Noted.Major Areas Inspected:Fitup,Preheat & Fabrication of Field Welds,Weld Repairs,Nde & Review of Fabrication Records IR 05000338/19930081993-03-15015 March 1993 Insp Repts 50-338/93-08 & 50-339/93-08 on 930117-0220. Violation Noted.Major Areas Inspected:Plant Status,License Event Rept & Surveillance Observation IR 05000338/19930011993-03-12012 March 1993 Insp Repts 50-338/93-01 & 50-339/93-01 on 930115-0211.Two Noncited Violations Identified.Major Areas Inspected:Program Organization & Mgt Controls,Hp Technician Training & Operational & Administrative Controls IR 05000338/19930061993-02-11011 February 1993 Partially Withheld Insp Repts 50-338/93-06 & 50-339/93-06 on 930125-29.No Violations Noted.Major Areas Inspected: Physical Security Program,Including Protected Vital Area Barriers.Portions Withheld (Ref 10CFR2.790) IR 05000338/19930051993-02-0505 February 1993 Insp Repts 50-338/93-05 & 50-339/93-05 on 930111-15.No Violations or Deviations Noted.Major Areas Inspected:Control of Heavy Loads in Containment & Crane Insps to Be Performed During SG Replacement Project IR 05000338/19930021993-02-0303 February 1993 Insp Repts 50-338/93-02 & 50-339/93-02 on 930104-08.No Violations Noted.Major Areas Inspected:Design Changes & Mod,Engineering Support Activities & Licensee Event Rept Followup IR 05000338/19920291993-01-13013 January 1993 Insp Repts 50-338/92-29 & 50-339/92-29 on 921122-1219.No Violations Noted.Major Areas Inspected:Operations,Maint, Minor Mods,Surveillances & Action on Previous Insp Findings IR 05000338/19920261992-12-31031 December 1992 Insp Repts 50-338/92-26 & 50-339/92-26 on 921130-1204.No Violations Noted.Major Areas Inspected:Organization & Staffing,Radiation Protection Training,Procedures & Work Controls ML20126E3431992-12-23023 December 1992 Insp Repts 50-338/92-30 & 50-339/92-30 on 921130-1204. Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans,Protected & Vital Area Barriers, Detection & Power Supply.Rept Partially Withheld IR 05000338/19920311992-12-17017 December 1992 Insp Repts 50-338/92-31 & 50-339/92-31 on 921207-10.No Violations or Deviations Noted.Major Areas Inspected: Emergency Operating Procedure & Abnormal Operating Procedure Followup IR 05000338/19920271992-12-16016 December 1992 Insp Repts 50-338/92-27 & 50-339/92-27 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:Primary Water Plant Chemistry,Confirmatory Measurements of non-radiological Samples & Radiological REMP IR 05000338/19920281992-12-15015 December 1992 Insp Repts 50-338/92-28 & 50-339/92-28 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:To Observe Certain Activities in Preparation for SG Replacement Project in Unit 1 & to Review Approved Welding Procedures IR 05000338/19920231992-12-11011 December 1992 Insp Repts 50-338/92-23 & 50-339/92-23 on 921018-1121.No Violations or Deviations Noted.Major Areas Inspected:Minor Mods,Operations,Maintenance,Surveillance,Esf Walkdown,Ler Followup & Actions on Previous Insp Findings IR 05000338/19920251992-11-25025 November 1992 Insp Repts 50-338/92-25 & 50-339/92-25 on 921102-06.No Violations Noted.Weaknesses Noted Re Heavy Loads Program. Major Areas inspected:post-refueling Startup Tests,Routine Surveillance of Core Performance & Control of Heavy Loads IR 05000280/19910221991-08-23023 August 1991 Insp Repts 50-280/91-22,50-281/91-22,50-338/91-18 & 50-339/91-18 on 910731 & 0801-02.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Pipe Wall Thinning Insp & Replacement Program IR 05000338/19910041991-03-0606 March 1991 Insp Repts 50-338/91-04 & 50-339/91-04 on 910128-0201.Major Areas Inspected:Observation of Inservice Insp Work Activities & Reactive Issues Re Relief Request for Noncode Repair on Unit 2 IR 05000338/19900251990-11-19019 November 1990 Insp Repts 50-338/90-25 & 50-339/90-25 on 900916-1020. Noncited Violation Noted.Major Areas Inspected:Operations, Maint,Surveillance,Mods,Operational Event Followup,Midloop Operations,Ler Followup & Action on Previous Insp Items 1999-07-02
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000338/19990031999-07-0202 July 1999 Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19990011999-04-12012 April 1999 Insp Repts 50-338/99-01 & 50-339/99-01 on 990131-0313. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.In Addition,Results of Insp by Region Based Fire Protection Specialist Encl IR 05000338/19980111999-03-0101 March 1999 Insp Repts 50-338/98-11 & 50-339/98-11 on 981220-990130.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000338/19980101999-01-14014 January 1999 Insp Repts 50-338/98-10 & 50-339/98-10 on 981108-1219.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196H4131998-11-0505 November 1998 Insp Repts 50-338/98-05 & 50-339/98-05 on 980713-31 & 0921- 25.Violation Noted.Major Areas Inspected:Review of Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Documents Used to Support Design & Performance IR 05000338/19980071998-08-18018 August 1998 Insp Repts 50-338/98-07 & 50-339/98-07 on 980720-23.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for North Anna Nuclear Station ML20216H6711998-04-0303 April 1998 Insp Repts 50-338/98-01,50-338/98-01 & 72-0016/98-01 on 980125-0307.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970111998-01-12012 January 1998 Insp Repts 50-338/97-11,50-339/97-11 & 72-0016/97-04 on 971102-1213.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970101997-10-0707 October 1997 Partially Withheld Insp Repts 50-338/97-10 & 50-339/97-10 on 970922-23 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plant Support by Regional Safeguards Specalist IR 05000338/19970041997-07-21021 July 1997 Insp Repts 50-338/97-04 & 50-339/97-04 on 970518-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19970051997-07-15015 July 1997 Insp Repts 50-338/97-05 & 50-339/97-05 on 970616-20.No Violations Noted.Major Areas Inspected:Plant Support ML20140F2651997-06-0606 June 1997 Insp Repts 50-338/97-03 & 50-339/97-03 on 970406-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000338/19970021997-05-0505 May 1997 Insp Repts 50-338/97-02 & 50-339/97-02 on 970223-0405.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137F7661997-03-21021 March 1997 Insp Repts 50-338/97-01 & 50-339/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19960131997-02-0707 February 1997 Insp Repts 50-338/96-13 & 50-339/96-13 on 961208-970111.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133J1991997-01-0606 January 1997 Insp Repts 50-338/96-12 & 50-339/96-12 on 961102-1207. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000338/19960101996-12-0202 December 1996 Insp Repts 50-338/96-10 & 50-339/96-10 on 960922-1102. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000338/19960111996-11-15015 November 1996 Insp Repts 50-338/96-11 & 50-339/96-11 on 961014-18.No Violations Noted.Major Areas Inspected:Plant Support ML20134G9071996-10-21021 October 1996 Insp Repts 50-338/96-09 & 50-339/96-09 on 960811-0921. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128K0591996-09-30030 September 1996 Insp Repts 50-338/96-08 & 50-339/96-08 on 960812-16.No Violations Noted.Major Areas Inspected:Cr Simulator,Tsc,Osc, EOF, & Joint Info Ctr IR 05000338/19960071996-09-0909 September 1996 Insp Repts 50-338/96-07 & 50-339/96-07 on 960810.Violations Noted.Major Areas Inspected:Licensee Operations,Engineers, Maint & Plant Support IR 05000338/19940291994-12-29029 December 1994 Partially Withheld Insp Repts 50-338/94-29 & 50-339/94-29 on 941128-1202 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000338/19930291994-01-12012 January 1994 Insp Repts 50-338/93-29 & 50-339/93-29 on Stated Date.No Violations Noted.Major Areas Inspected:Plant Status,Ler Followup,Safety Verification,Maintenance Observation, Surveillance Observation & Cold Weather Preparations ML20059B2881993-12-14014 December 1993 Insp Repts 50-338/93-27 & 50-339/93-27 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation & Surveillance Observation IR 05000338/19930241993-11-15015 November 1993 Insp Repts 50-338/93-24 & 50-339/93-24 on 930919-1016.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation, Surveillance Observation & LER Followup IR 05000338/19930281993-10-29029 October 1993 Insp Repts 50-338/93-28 & 50-339/93-28 on 931014-20. Violations Noted.Major Areas Inspected:Circumstances Surrounding Unit 2 High Head Safety Injection Subsystem Not Meeting TS Min Flow Requirement on 931014 IR 05000338/19930261993-10-27027 October 1993 Insp Repts 50-338/93-26 & 50-339/93-26 on 930927-1001.No Violations or Deviations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Involving Review of HP Activities Primarily Associated W/Unit 2 Refueling Outage IR 05000338/19930211993-10-20020 October 1993 Insp Repts 50-338/93-21 & 50-339/93-21 on 930920-24.No Violations Noted.Major Areas Inspected:Organization of Chemistry Dept & Units Responsible for Handling & Shipping of Radioactive Matl & Plant Water Chemistry IR 05000338/19930231993-10-15015 October 1993 Insp Repts 50-338/93-23 & 50-339/93-23 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Status, Operational Verification,Maint Observation,Training & Action on Previous Insp Items IR 05000338/19930251993-10-13013 October 1993 Insp Repts 50-338/93-25 & 50-339/93-25 on 930914-17.No Violations Noted.Major Areas Inspected:Eddy Current Exam of Steam Generator Tubes IR 05000338/19930201993-09-17017 September 1993 Insp Repts 50-338/93-20 & 50-339/93-20 on 930718-0821.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maint Observation, Surveillance Observation & Action on Previous Insp Items ML20056E8651993-08-0404 August 1993 Insp Repts 50-338/93-19 & 50-339/93-19 on 930620-0717. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Plant Status & Surveillance Observation ML20056D1671993-07-13013 July 1993 Insp Repts 50-338/93-18 & 50-339/93-18 on 930509-0619. Violations Noted.Major Areas Inspected:Examinations of Procedures & Representative Records,Interviews W/Personnel & Observaton of Activities in Progress IR 05000338/19930091993-03-24024 March 1993 Insp Repts 50-338/93-09 & 50-339/93-09 on 930208-12 & 22-55. No Violations Noted.Major Areas Inspected:Fitup,Preheat & Fabrication of Field Welds,Weld Repairs,Nde & Review of Fabrication Records IR 05000338/19930081993-03-15015 March 1993 Insp Repts 50-338/93-08 & 50-339/93-08 on 930117-0220. Violation Noted.Major Areas Inspected:Plant Status,License Event Rept & Surveillance Observation IR 05000338/19930011993-03-12012 March 1993 Insp Repts 50-338/93-01 & 50-339/93-01 on 930115-0211.Two Noncited Violations Identified.Major Areas Inspected:Program Organization & Mgt Controls,Hp Technician Training & Operational & Administrative Controls IR 05000338/19930061993-02-11011 February 1993 Partially Withheld Insp Repts 50-338/93-06 & 50-339/93-06 on 930125-29.No Violations Noted.Major Areas Inspected: Physical Security Program,Including Protected Vital Area Barriers.Portions Withheld (Ref 10CFR2.790) IR 05000338/19930051993-02-0505 February 1993 Insp Repts 50-338/93-05 & 50-339/93-05 on 930111-15.No Violations or Deviations Noted.Major Areas Inspected:Control of Heavy Loads in Containment & Crane Insps to Be Performed During SG Replacement Project IR 05000338/19930021993-02-0303 February 1993 Insp Repts 50-338/93-02 & 50-339/93-02 on 930104-08.No Violations Noted.Major Areas Inspected:Design Changes & Mod,Engineering Support Activities & Licensee Event Rept Followup IR 05000338/19920291993-01-13013 January 1993 Insp Repts 50-338/92-29 & 50-339/92-29 on 921122-1219.No Violations Noted.Major Areas Inspected:Operations,Maint, Minor Mods,Surveillances & Action on Previous Insp Findings IR 05000338/19920261992-12-31031 December 1992 Insp Repts 50-338/92-26 & 50-339/92-26 on 921130-1204.No Violations Noted.Major Areas Inspected:Organization & Staffing,Radiation Protection Training,Procedures & Work Controls ML20126E3431992-12-23023 December 1992 Insp Repts 50-338/92-30 & 50-339/92-30 on 921130-1204. Violations Noted.Major Areas Inspected:Mgt Support & Security Program Plans,Protected & Vital Area Barriers, Detection & Power Supply.Rept Partially Withheld IR 05000338/19920311992-12-17017 December 1992 Insp Repts 50-338/92-31 & 50-339/92-31 on 921207-10.No Violations or Deviations Noted.Major Areas Inspected: Emergency Operating Procedure & Abnormal Operating Procedure Followup IR 05000338/19920271992-12-16016 December 1992 Insp Repts 50-338/92-27 & 50-339/92-27 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:Primary Water Plant Chemistry,Confirmatory Measurements of non-radiological Samples & Radiological REMP IR 05000338/19920281992-12-15015 December 1992 Insp Repts 50-338/92-28 & 50-339/92-28 on 921116-20.No Violations or Deviations Noted.Major Areas Inspected:To Observe Certain Activities in Preparation for SG Replacement Project in Unit 1 & to Review Approved Welding Procedures IR 05000338/19920231992-12-11011 December 1992 Insp Repts 50-338/92-23 & 50-339/92-23 on 921018-1121.No Violations or Deviations Noted.Major Areas Inspected:Minor Mods,Operations,Maintenance,Surveillance,Esf Walkdown,Ler Followup & Actions on Previous Insp Findings IR 05000338/19920251992-11-25025 November 1992 Insp Repts 50-338/92-25 & 50-339/92-25 on 921102-06.No Violations Noted.Weaknesses Noted Re Heavy Loads Program. Major Areas inspected:post-refueling Startup Tests,Routine Surveillance of Core Performance & Control of Heavy Loads IR 05000280/19910221991-08-23023 August 1991 Insp Repts 50-280/91-22,50-281/91-22,50-338/91-18 & 50-339/91-18 on 910731 & 0801-02.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Pipe Wall Thinning Insp & Replacement Program IR 05000338/19910041991-03-0606 March 1991 Insp Repts 50-338/91-04 & 50-339/91-04 on 910128-0201.Major Areas Inspected:Observation of Inservice Insp Work Activities & Reactive Issues Re Relief Request for Noncode Repair on Unit 2 IR 05000338/19900251990-11-19019 November 1990 Insp Repts 50-338/90-25 & 50-339/90-25 on 900916-1020. Noncited Violation Noted.Major Areas Inspected:Operations, Maint,Surveillance,Mods,Operational Event Followup,Midloop Operations,Ler Followup & Action on Previous Insp Items 1999-07-02
[Table view] Category:UTILITY
MONTHYEARIR 05000338/19900231990-10-0909 October 1990 Insp Repts 50-338/90-23 & 50-339/90-23 on 900819-0915. Violation Noted But Not Cited.Major Areas Inspected: Operations,Maint,Surveillances,Operational Event Followup, LER Followup & Evaluation of Licensee self-assessment IR 05000338/19900191990-09-14014 September 1990 Insp Repts 50-338/90-19 & 50-339/90-19 on 900820-24. Violations Noted But Not Cited.Major Areas Inspected: Licensee Radiation Protection Program Consisting of Review in Areas of External & Internal Exposure Control IR 05000338/19900181990-09-11011 September 1990 Insp Repts 50-338/90-18 & 50-339/90-18 on 900718-0818. Violations Noted.Major Areas Inspected:Operations,Maint, Surveillances,Operational Event Followup,Mods,Self Assessment Capabilities & LER Followup IR 05000338/19900201990-09-0606 September 1990 Insp Repts 50-338/90-20 & 50-339/90-20 on 900906.No Violations or Deviations Noted.Major Areas Inspected: Annual Emergency Preparedness Exercise IR 05000338/19900171990-07-27027 July 1990 Partially Withheld Insp Repts 50-338/90-17 & 50-339/90-17 on 900709-13 (Ref 10CFR2.790).No Violations or Deviations.Major Areas Inspected:Physical Security Program for Power Reactors & Security Plan & Implementing Procedures IR 05000338/19900131990-06-27027 June 1990 Insp Repts 50-338/90-13 & 50-339/90-13 on 900514-18 & 29. Noncited Violations Noted.Major Areas Inspected:Radiation Monitoring Sys,Water Chemistry & QC IR 05000338/19900141990-06-22022 June 1990 Insp Repts 50-338/90-14 & 50-339/90-14 on 900604-08.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Followup on Unresolved Item Identified During App R Triennial Insp on 880718-22 IR 05000338/19890261989-09-21021 September 1989 Insp Repts 50-338/89-26 & 50-339/89-26 on 890715-0822. Violation Noted.Major Areas Inspected:Plant Status,Maint, Surveillance,Esf Walkdown,Operational Safety Verification, Operating Reactor Events & LER Followup IR 05000338/19890221989-08-24024 August 1989 Insp Repts 50-338/89-22 & 50-339/89-22 on 890601-0714.No Violations or Deviations Noted.Major Areas Inspected:Plant Status,Maint,Surveillance,Esf Walkdown,Operational Safety Verification,Generic Ltr 88-17 & Plant Startup IR 05000338/19890271989-08-22022 August 1989 Insp Repts 50-338/89-27 & 50-339/89-27 on 890731-0804.No Violations or Deviations Noted.Major Areas Inspected: Followup on Licensee Action Re Previous Insp Findings. Weaknesses Noted Re Labeling of Instruments & App R Sys IR 05000338/19892001989-08-0808 August 1989 Safety Sys Outage Mod & Maint Team Insp Repts 50-338/89-200 & 50-339/89-201 on 890508-12 & 22-26.No Violations Noted. Major Areas Inspected:Implementation of Matl & Work Control Sys to Ensure Mod Conformed to Installation Requirements IR 05000338/19890241989-08-0707 August 1989 Insp Repts 50-338/89-24 & 50-339/89-24 on 890710-14.No Violations Noted.Major Areas Inspected:Functional Areas of Emergency Preparedness Program,Including Training,Audit Repts,Distribution of Changes to EPIPs & Staff Augmentation IR 05000338/19890211989-07-27027 July 1989 Insp Repts 50-338/89-21 & 50-339/89-21 on 890613-14.No Violations or Deviations Noted.Major Areas Inspected: Physical Security Program for Power Reactors,Specifically pre-employment Screening & Clearances ML20247D5441989-07-0707 July 1989 Insp Repts 50-338/89-12 & 50-339/89-12 on 890412-14 & 20-26. Violation Noted.Major Areas Inspected:Witnessing Containment Integrated Leak Rate Test,Reviewing Test Procedures & Evaluating Test Results IR 05000338/19890121989-07-0707 July 1989 Corrected Pages 1 & 2 to Insp Repts 50-338/89-12 & 50-339/89-12 on 890412-14 & 20-26.Violation Noted.Major Areas Inspected:Containment Integrated Leak Rate Test,Test Procedures,Evaluation of Test Results & Previous Items IR 05000338/19890191989-06-30030 June 1989 Insp Repts 50-338/89-19 & 50-339/89-19 on 890605-08.Major Areas Inspected:Solid Wastes,Transportation of Radioactive Matls & Radwaste & Followup on previously-identified Insp Findings IR 05000338/19890201989-06-28028 June 1989 Insp Repts 50-338/89-20 & 50-339/89-20 on 890605-09 & 12-13. No Violations or Deviations Noted.Major Areas Inspected: Results of 10-yr Ultrasonic Exam of Unit 1 Reactor Pressure Vessel & Observation of Inservice Activities ML20246J9231989-06-27027 June 1989 Insp Repts 50-338/89-14 & 50-339/89-14 on 890418-0531. Violation Noted.Major Areas Inspected:Plant Status, Maint,Surveillance,Esf Walkdown,Operational Safety Verification,Operating Reactor Events & LER follow-up IR 05000338/19890091989-06-0909 June 1989 Insp Repts 50-338/89-09 & 50-339/89-09 on 890522-24.No Violations or Deviations Noted.Major Areas Inspected:Primary & Secondary Chemistry,Radwaste Processing,Radioactive Effluents & Environ Monitoring IR 05000339/19892001989-06-0707 June 1989 Insp Rept 50-339/89-200 on 890213-17 & 0227-0303.Potential Enforcement Items Noted.Major Areas Inspected:Evaluation of Planned Design Changes & Mods Against Regulatory Requirements & Licensee Commitments ML20245D5481989-06-0707 June 1989 Insp Repts 50-338/89-11 & 50-339/89-11 on 890403-07. Violations,Deviations & Unresolved Items Noted.Major Areas Inspected:Licensee Conformance to Reg Guide 1.97, Instrumentation for Light Water Cooled Nuclear Power.. IR 05000338/19890171989-06-0606 June 1989 Partially Withheld Insp Repts 50-338/89-17 & 50-339/89-17 on 890501-05 (Ref 10CFR2.790(d) & 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Core Insp Program. Noncited Violation Re Improper Badging Noted ML20244E5611989-06-0606 June 1989 Insp Repts 50-338/89-18 & 50-339/89-18 on 890515-19. Violations Noted.Major Areas Inspected:Areas of Inservice Insp - Observation of Work & Work Activities IR 05000338/19890131989-06-0202 June 1989 Insp Repts 50-338/89-13 & 50-339/89-13 on 890418-20. Violations Noted.No Deviations Identified.Major Areas Inspected:Areas of Welding safety-related Components & Review of Reactor Vessel 10-yr Ultrasonic Exam Program ML20245D3511989-06-0202 June 1989 Insp Repts 50-338/89-15 & 50-339/89-15 on 890501-05. Violation Noted.Major Areas Inspected:Radiation Protection Program,Including Review of Areas of External & Internal Exposure Control & Program to Maintain Doses ALARA ML20244B8151989-05-17017 May 1989 Insp Repts 50-338/89-08 & 50-339/89-08 on 890321-0417 & 0425-0503.Violations Noted.Major Areas Inspected:Plant Status,Maint,Surveillance,Operational Safety Verification, Operating Reactor Events & LER Followup IR 05000338/19890041989-04-26026 April 1989 Insp Repts 50-338/89-04 & 50-339/89-04 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected:Seismic Analyses for as-built safety-related Piping Sys Per IE Bulletin 79-14 IR 05000338/19890101989-04-17017 April 1989 Insp Repts 50-338/89-10 & 50-339/89-10 on 890403-07.No Violations or Deviations Noted.Major Areas Inspected:Safety Sys Outage Mod Insp Followup ML20245C0071989-04-13013 April 1989 Insp Repts 50-338/89-05 & 50-339/89-05 on 890320-24. Violations Noted.Major Areas Inspected:Radiation Protection Program in Areas of Organization & Mgt Controls,Training & Qualifications & Internal Exposure Control IR 05000338/19890051989-04-13013 April 1989 Insp Repts 50-338/89-05 & 50-339/89-05 on 890320-24. Violations Noted.Major Areas Inspected:Radiation Protection Program in Areas of Organization & Mgt Controls,Training & Qualifications & Internal Exposure Control IR 05000338/19890031989-04-12012 April 1989 Insp Repts 50-338/89-03 & 50-339/89-03 on 890203-0320. Violations Noted.Major Areas Inspected:Plant Status,Maint, Surveillance,Esf Walkdown,Operational Safety Verification, Operating Reactor Events & LER Followup IR 05000338/19890071989-04-11011 April 1989 Insp Repts 50-338/89-07 & 50-339/89-07 on 890313-17.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Work Observation,Inserice Insp Data Review & Licensee Recovery Efforts from 890225 Hot Leg Plug Failure ML20247F0791989-03-23023 March 1989 Insp Repts 50-338/89-02 & 50-339/89-02 on 890221-23.No Violations Noted.Major Areas Inspected:Licensee Response to Emergency Response Facility Appraisal Open Items & Emergency Preparedness Program Enhancement Items IR 05000338/19880361989-03-21021 March 1989 Insp Repts 50-338/88-36 & 50-339/88-36 on 881231-890202. Violations Noted Re Failure to Take Prompt Corrective Action Re Inadequate Instrument Air Quality.Major Areas Inspected: Plant Status,Maint,Surveillance & LERs IR 05000338/19890061989-03-20020 March 1989 Insp Repts 50-338/89-06 & 50-339/89-06 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Eddy Current Exam of Steam Generator Tubing & Reviews of NDE Procedures IR 05000338/19880261989-02-16016 February 1989 Suppl to Insp Repts 50-338/88-26 & 50-339/88-26.Results of Analysis & Evaluation of Health Physics Counting Room Indicate Considerable Improvement Between Licensee & NRC Data for Radionuclides IR 05000280/19880401988-10-26026 October 1988 Insp Repts 50-280/88-40,50-281/88-40,50-338/88-28 & 50-339/88-28 on 880926-30.No Violations or Deviations Noted. Major Areas Inspected:Control Room Habitability & Insp Followup Items IR 05000338/19880271988-10-24024 October 1988 Insp Repts 50-338/88-27 & 50-339/88-27 on 880820-0916.No Violations Noted.Major Areas Inspected:Plant Status,Maint, Surveillance & Operational Safety Verification,Including Reviews of Backshift Operations IR 05000338/19880291988-10-19019 October 1988 Insp Repts 50-338/88-29 & 50-339/88-29 on 880912-16.No Violations or Deviations Noted.Major Areas Inspected: IE Bulletin 79-14 IR 05000338/19880301988-10-0707 October 1988 Insp Repts 50-338/88-30 & 50-339/88-30 on 880912-16.No Violations or Deviations Noted.Major Areas Inspected: Requested Actions on NRC Bulletins,Temporary Instruction 2500/26 & Licensee Action on Previous Insp Followup Items ML20155C2181988-09-26026 September 1988 Insp Repts 50-338/88-24 & 50-339/88-24 on 880815-19. Violations Noted.Major Areas Inspected:Emergency Preparedness,Including Emergency Plan & Implementing Procedures & Emergency Facilities Equipment ML20154R3651988-09-20020 September 1988 Insp Repts 50-338/88-26 & 50-339/88-26 on 880815-19.No Violations or Deviations Noted.Major Areas Inspected: Confirmatory Measurements & Counting Room QA for in-plant Radiochemical Analyses ML20155A1911988-09-15015 September 1988 Insp Repts 50-338/88-22 & 50-339/88-22 on 880716-0819. Violations Noted.Major Areas Inspected:Plant Status,Maint, Sueveillance,Esf Walkdown,Operational Safety Verification, Operating Reactor Events & LER Followup IR 05000338/19880131988-09-13013 September 1988 Insp Repts 50-338/88-13 & 50-339/88-13 on 880718-22. Violation Noted.Major Areas Inspected:Triennial post-fire Safe Shutdown Capability Reverification & Assessment, Including App R Compliance & post-fire Shutdown Capability IR 05000338/19880251988-09-0707 September 1988 Insp Repts 50-338/88-25 & 50-339/88-25 on 880808-12.No Violations,Deviations or Program Weaknesses Noted.Major Areas Inspected:Plant Chemistry,Chemical Corrosion & Pipe Wall Thinning IR 05000338/19880141988-08-18018 August 1988 Insp Repts 50-338/88-14 & 50-339/88-14 on 880627-30.No Violations or Deviations Noted.Major Areas Inspected: Emergency Response Facility & Equipment,Interviews W/Util Personnel & Equipment for Emergency Response Organization IR 05000338/19880211988-08-12012 August 1988 Insp Repts 50-338/88-21 & 50-339/88-21 on 880611-0715.No Violations or Deviations Noted.Major Areas Inspected: Plant Status,Ler,Review of Inspector Followup Items,Monthly Maint Observation & Operator Safety Verification ML20151W7621988-08-0909 August 1988 Insp Repts 50-338/88-18 & 50-339/88-18 on 880606-10. Violations Noted.Major Areas Inspected:External Exposure Control & Assessment,Control of Radioactive Matls, Contamination,Surveys & Monitoring & Solid Waste IR 05000338/19880171988-07-0808 July 1988 Insp Repts 50-338/88-17 & 50-339/88-17 on 880606-10.No Violations or Deviations Noted.Major Areas Inspected:Review & Evaluation of Inservice Insp Data from Unit 2,1987 Refueling Outage & Maint Records Review of Coolant Pump IR 05000338/19880121988-07-0606 July 1988 Insp Repts 50-338/88-12 & 50-339/88-12 on 880420-22.No Violations or Deviations Noted.Major Areas Inspected:Snubber Surveillance Program & Followup on Licensee Action on Previous Insp Findings 1990-09-06
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000338/19990031999-07-0202 July 1999 Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19990011999-04-12012 April 1999 Insp Repts 50-338/99-01 & 50-339/99-01 on 990131-0313. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.In Addition,Results of Insp by Region Based Fire Protection Specialist Encl IR 05000338/19980111999-03-0101 March 1999 Insp Repts 50-338/98-11 & 50-339/98-11 on 981220-990130.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000338/19980101999-01-14014 January 1999 Insp Repts 50-338/98-10 & 50-339/98-10 on 981108-1219.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20196H4081998-11-0505 November 1998 Notice of Violation from Insp on 980713-31 & 0921-25. Violation Noted:As of 980712,AFW Pipe Supports Were Not Constructed IAW Details Shown on Design Drawings as Listed ML20196H4131998-11-0505 November 1998 Insp Repts 50-338/98-05 & 50-339/98-05 on 980713-31 & 0921- 25.Violation Noted.Major Areas Inspected:Review of Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Documents Used to Support Design & Performance ML20155B0671998-10-0202 October 1998 NRC Operator Licensing Exam Repts 50-338/98-301 & 50-339/98-301 (Including Completed & Graded Tests) for Tests Administered on 980817-21 & 31-0903 IR 05000338/19980071998-08-18018 August 1998 Insp Repts 50-338/98-07 & 50-339/98-07 on 980720-23.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise for North Anna Nuclear Station ML20216H6711998-04-0303 April 1998 Insp Repts 50-338/98-01,50-338/98-01 & 72-0016/98-01 on 980125-0307.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970111998-01-12012 January 1998 Insp Repts 50-338/97-11,50-339/97-11 & 72-0016/97-04 on 971102-1213.No Violations Noted.Major Areas Inspected: Operations,Engineering,Maintenance & Plant Support IR 05000338/19970101997-10-0707 October 1997 Partially Withheld Insp Repts 50-338/97-10 & 50-339/97-10 on 970922-23 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Plant Support by Regional Safeguards Specalist IR 05000338/19970041997-07-21021 July 1997 Insp Repts 50-338/97-04 & 50-339/97-04 on 970518-0621.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19970051997-07-15015 July 1997 Insp Repts 50-338/97-05 & 50-339/97-05 on 970616-20.No Violations Noted.Major Areas Inspected:Plant Support ML20140F2651997-06-0606 June 1997 Insp Repts 50-338/97-03 & 50-339/97-03 on 970406-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20148B6541997-05-0505 May 1997 Notice of Violation from Insp on 970223-0405.Violation Noted:Operators Failed to Verify That Unit 1 & 2 RCPs 1 Seal Leakoffs & Unit 2 Nr 46 Nuclear Power Range Chart Recorders Were Operational IR 05000338/19970021997-05-0505 May 1997 Insp Repts 50-338/97-02 & 50-339/97-02 on 970223-0405.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137F7411997-03-21021 March 1997 Notice of Violation from Insp on 970112-0222.Violation Noted:As of 970213,radiation Monitors Installed in Fuel Handling & Storage Locations,Did Not Provide Full Coverage for Area Used for New Fuel Receipt ML20137F7661997-03-21021 March 1997 Insp Repts 50-338/97-01 & 50-339/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000338/19970991997-02-21021 February 1997 SALP Repts 50-338/97-99 & 50-339/97-99 for 941225-970111 IR 05000338/19960131997-02-0707 February 1997 Insp Repts 50-338/96-13 & 50-339/96-13 on 961208-970111.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20133J1991997-01-0606 January 1997 Insp Repts 50-338/96-12 & 50-339/96-12 on 961102-1207. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20133G8881997-01-0606 January 1997 Notice of Violation from Insp on 961103-1207.Violation Noted:Licensee Failed to Ensure That Safeguards Area Walls Met Design Basis for Containing Pump Seal Leakage Described in Updated Final Safety Analysis Rept Section 15.4.1.8 ML20133C9491996-12-27027 December 1996 EN-96-098:order Prohibiting Involvement in NRC Licensed Activities Will Be Issued on or About 970102 to Unlicensed Individual Formerly Employed as Contract Millwright.State of VA Will Be Notified ML20149M5831996-12-0202 December 1996 Notice of Violation from Insp on 960922-1102.Violation Noted:Rce Had Not Been Completed for Several Pump 1-CH-P-1A Seal Failures Which Occurred Between 960211 & 0718 IR 05000338/19960101996-12-0202 December 1996 Insp Repts 50-338/96-10 & 50-339/96-10 on 960922-1102. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000338/19960111996-11-15015 November 1996 Insp Repts 50-338/96-11 & 50-339/96-11 on 961014-18.No Violations Noted.Major Areas Inspected:Plant Support PNO-II-96-081, on 961112,Unit 2 Experienced Turbine Generator Trip from 100% Power.Investigation Into Cause of Turbine Generator Trip Revealed Ground Fault on Main Generator Stator Phase a Windings.Addl Followup Will Be Performed1996-11-13013 November 1996 PNO-II-96-081:on 961112,Unit 2 Experienced Turbine Generator Trip from 100% Power.Investigation Into Cause of Turbine Generator Trip Revealed Ground Fault on Main Generator Stator Phase a Windings.Addl Followup Will Be Performed ML20134G7971996-10-21021 October 1996 Notice of Violation from Insp on 960811-0921.Violation Noted:Procedure for Irradiated Fuel Damage While Refueling, 0-AP-30 Inadequate ML20134G9071996-10-21021 October 1996 Insp Repts 50-338/96-09 & 50-339/96-09 on 960811-0921. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128K0591996-09-30030 September 1996 Insp Repts 50-338/96-08 & 50-339/96-08 on 960812-16.No Violations Noted.Major Areas Inspected:Cr Simulator,Tsc,Osc, EOF, & Joint Info Ctr ML20134C6401996-09-0909 September 1996 Notice of Violation from Insp on 960810.Violation Noted: on 940802,inadequate Maint Procedure Was Used to Control Maint Activities Affecting Quality IR 05000338/19960071996-09-0909 September 1996 Insp Repts 50-338/96-07 & 50-339/96-07 on 960810.Violations Noted.Major Areas Inspected:Licensee Operations,Engineers, Maint & Plant Support IR 05000338/19940291994-12-29029 December 1994 Partially Withheld Insp Repts 50-338/94-29 & 50-339/94-29 on 941128-1202 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors IR 05000338/19930291994-01-12012 January 1994 Insp Repts 50-338/93-29 & 50-339/93-29 on Stated Date.No Violations Noted.Major Areas Inspected:Plant Status,Ler Followup,Safety Verification,Maintenance Observation, Surveillance Observation & Cold Weather Preparations ML20059L0511994-01-0404 January 1994 EN-94-001:on 940107,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $15,000 Will Be Issued.Action Based on Two Previous Similar Severity Level IV Violations Issued on 901207 & 920515 ML20059B2521993-12-14014 December 1993 Corrected NOV from Insp on 931017-1120,including Response Instruction ML20059B2881993-12-14014 December 1993 Insp Repts 50-338/93-27 & 50-339/93-27 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation & Surveillance Observation ML20059B2751993-12-14014 December 1993 Notice of Violation from Insp on 931017-1120.Violation Noted:On 931029,periodic Test Procedure 2-PT-82H Was Not Implemented Correctly & While Performing Step 6.4.5,operator Incorrectly Placed Control Switch Breaker in pull-to-lock IR 05000338/19930241993-11-15015 November 1993 Insp Repts 50-338/93-24 & 50-339/93-24 on 930919-1016.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maintenance Observation, Surveillance Observation & LER Followup IR 05000338/19933011993-11-12012 November 1993 Exam Rept 50-338/93-301 on 931008-15.Exam Results:Eight ROs & Six SROs Passed Written & Operating Exams.Exam for Both Units IR 05000338/19930281993-10-29029 October 1993 Insp Repts 50-338/93-28 & 50-339/93-28 on 931014-20. Violations Noted.Major Areas Inspected:Circumstances Surrounding Unit 2 High Head Safety Injection Subsystem Not Meeting TS Min Flow Requirement on 931014 IR 05000338/19930261993-10-27027 October 1993 Insp Repts 50-338/93-26 & 50-339/93-26 on 930927-1001.No Violations or Deviations Noted.Major Areas Inspected: Licensee Radiation Protection Program,Involving Review of HP Activities Primarily Associated W/Unit 2 Refueling Outage IR 05000338/19933001993-10-20020 October 1993 Exam Repts 50-338/93-300 & 50-339/93-300 on 930825-0910 & 930921-24.Exam Results:Six SROs & Five ROs Received Written & Operating Exams.All Operators Passed Exams IR 05000338/19930211993-10-20020 October 1993 Insp Repts 50-338/93-21 & 50-339/93-21 on 930920-24.No Violations Noted.Major Areas Inspected:Organization of Chemistry Dept & Units Responsible for Handling & Shipping of Radioactive Matl & Plant Water Chemistry IR 05000338/19930231993-10-15015 October 1993 Insp Repts 50-338/93-23 & 50-339/93-23 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Status, Operational Verification,Maint Observation,Training & Action on Previous Insp Items IR 05000338/19930251993-10-13013 October 1993 Insp Repts 50-338/93-25 & 50-339/93-25 on 930914-17.No Violations Noted.Major Areas Inspected:Eddy Current Exam of Steam Generator Tubes IR 05000338/19930201993-09-17017 September 1993 Insp Repts 50-338/93-20 & 50-339/93-20 on 930718-0821.No Violations Noted.Major Areas Inspected:Plant Status, Operational Safety Verification,Maint Observation, Surveillance Observation & Action on Previous Insp Items ML20056E8521993-08-0505 August 1993 Notice of Violation from Insp on 930620-0717.Violation Noted:Operating Procedure 1-OP-6.5.A Not Implemented Properly,In That While Performing Step 5.3.4.e,operator Failed to Fully Open EDG Exhaust Muffler Bypass Valve ML20056E8651993-08-0404 August 1993 Insp Repts 50-338/93-19 & 50-339/93-19 on 930620-0717. Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Plant Status & Surveillance Observation ML20056D1581993-07-13013 July 1993 Notice of Violation from Insp on 930509-0619.Violation Noted:Hydrogen Analyzer Determined to Be Inoperable from 930209 to 0509 W/O Implementing Requirements of Action Statement 1999-07-02
[Table view] |
See also: IR 05000338/1987032
Text
,
t** 88 0 j
'
3 A UNITED STATES
g g NUCLEAR REGULATORY COMMISSION-
o e REGION 11
[ 101 MARIETTA ST., N.W. ]
4,,,, ATLANTA, GEORGIA 30323 !
l
Report Nos.: 50-338/87-32 and 50-339/87-32 l
Licensee: Virginia Electric and Power Company
Richmond, VA 23261
Docket Nos.: 50-338 and 50-339 License Nos.: NPF-4 and NPF-7 '
Facility Name: North Anna 1 and 2
1
Inspection Conducted: October 5-9, 1987 1
Inspectors: /k/[#I /2#
A. Ruff,'RIE
~
g-' W - 7 7
Date Signed
' 'T[/
%L 8//Dr / $
S.' D. 'Al xEifder, NRR
d/ ' N-W'
/ Date Signed-
,K // -2C- t *~)
C N RII Date Signed
[m bm A k
CNaulk, RII
~
// - E T - E N -l
Date Signed / !
Cb W AD W lb? k W/ //- M- f'7
B. Levis, RIl
fr Date Signed ]
l
Consultants: T. ilumphrey, Idaho National Engineering Laboratory (INEL) i
J. Stoffell, INEL
V. Nicolette, Sandia National Laboratories
Approved by C ff / // - fP P[
T. E. Conlo1, Chief Date Signed '
Plant Systems Section
Division of Reactor Safety
i
SUMMARY
Scope: This special, announced inspection was in the area of Environmental
Qualification (EQ) of Electrical Equipment and included a review of Virginia
Power Company's implementation of the requirements of 10 CFR 50.49 for North
Anna and an inspection of electrical _ equipment within the scope of
10 CFR 50.49.
.
l
8712200068 8712 l
PDR ADOCK 0 '
G '
l ______________________a
.
.
2
Electrical Equipment requiring Environmental Qualification at North Anna Unit 1
and Unit 2 are qualified to the requirements of IEB 79-01B and NUREG-0588,
Category II, respectively. The NRC inspectors examined Virginia Power
Company's program for establishing the qualification of equipment within the
scope of 10 CFR 50.49. The program was evaluated by examination of Virginia
Power Company's qualification documentation files, review of procedures for
controlling the EQ efforts, and verification of adequacy and accuracy of the
program for maintaining the qualified status of the applicable equipment at
North Anna.
Based on the inspection findings, which are discussed in more detail in
paragraphs 5 through 13, the inspection team determined that Virginia Power Co.
has implem nted a program to meet the requirements of 10 CFR 50.49 for North ,
Anna although some deficiencies were identified. '
Results: Four violations were identified: (1) EQ Station Maintenance Program
Procedures, paragraph 12; (2) Limitorque Motor Operators, paragraph 13.c.(3);
(3) Performance Characteristics, paragraph 13.c.(4); and (4) Raychem Splice
Sleeves in Unqualified Configurations, paragraph 13.c.(11).
i
i
i
j
,
t _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . __
_ _ _ _ _ _ ________________.________;
.
.
REPORT DETAILS
1. Persons Contacted
Licensee Employees
- W. L. Stewart, V. P. Nuclear Operations
- J. L. Wilson, Manager, Nuclear Operations Support
- E. W. Harrell, Station Manager, Nuclear (North Anna)
- M. L. Bowling, Assistant Station Manager, Nuclear Safety and Licensing
- N. E. Hardwick, Manager, Nuclear Programs and Licensing
- R. W. Calder, Manager, Nuclear Engineering
- R. F. Driscoll, Manager, Quality Assurance North Anna
- G. L. Pannell, Director Safety Evaluation and Control
- H. L. Sutton, Nuclear Specialist
- D. B. Roth, Nuclear Specialist
- H. V. Le, Station EQ Coordinator
- P. T. Knutsen, Supervisor Nuclear Engineering
- M. G. Pinion, Engineering EQ Coordinator
- P. E. Conner, Electrical Engineering
- W. F. Murray, Nuclear Engineering
- B. L. Ingraham, Nuclear Engineering
- J. W. Shim, Nuclear Engineering
- M. E. McClendon, Nuclear Engineering
Other licensee employees contacted included craftsmen, engineers,
technicians, operators, mechanics, security force members, and office
personnel.
Other Organizations
- L. P. Gradin, Director of Engineering, Ecotech, Inc.
NRC Personnel and Resident Inspectors
- E. Merschoff, Chief, Vendor Inspection Branch, Division of Reactor
Inspection and Safeguards, NRR
- A. Herdt, Chief, Engineering Branch, Division of Reactor Safety, RII
J. Caldwell, Senior Resident Inspector
L. King, Resident Inspector
.
.
2
2. Exit Interview
The inspection scope and findings were summarized on October 5, 1987, with
those persons indicated in paragraph 1 above. The inspectors described
the areas inspected and discussed in detail the inspection findings. No
dissenting comments were received from the licensee. The following new
items were identified during this inspection:
a. Violation 50-338, 339/87-32-01, EQ Maintenance Requirements in
Qualification Document Review (QDR) Files not adequately
addressed in the Station Maintenance Program Procedures,
paragraph 12.
b. Violation 50-338, 339/87-32-02, Unqualified Limitorque
Operators, paragraph 13.c.(3).
c. Violation 50-338, 339/87-32-03, Performance Characteristics not
Adequately Addressed in the QDR File, paragraph 13.c.(4).
d. Unresolved Item 50-338, 339/87-32-04, Test Anomalies from
Victoreen Test Report not Adequately Addressed in the QDR File,
paragraph 13.c.(5).
e. Violation 50-338, 339/87-32-05, Raychem Splice Sleeves in
Unqualified Configuration, paragraph 13.c.(11).
The licensee did identify some material as proprietary during this
inspection, but this material is not included in this inspection report.
3. Licensee Action on Previous Enforcement Matters
NRC's unresolved item 50-338, 339/87-01v05 concerning Raychem splices is
closed with this report. Raychem splices are discussed in paragraph
13.c(11).
4. Unresolved Items
Unresolved items are matters about with more information is required to-
determine whether they are acceptable or may involve violations or
deviations. One unresolved item identified during this inspection is
discussed in paragraph 13.c.(5).
.
5. Electrical Equipment Environmental Qualification
a. EQ Program and Procedure Review
The inspectors reviewed Virginia Power Co./ North Anna EQ program
directives to verify establishment of an EQ program in compliance
with 10 CFR 50.49 including the following:
-
Nuclear Operations Department Policy Statement N0DPS-SP-01,
Environmental Qualification Program
_ _____ _ ____ _ _ -
- _ _ _ _ _ _ _ _ _ _ _ - _ _
.
.
3
- Nuclear Operations Departmer,t Policy Statement, N0DPS-M-02,
Preventive Maintenance Program
- Nuclear Operations Department Standard, N0DS-M-02, Station
Maintenance Program
- Nuclear Operations Department Standard N0DS-SP-01, The Standard
for the Environmental Qualification Program, dated November 26,
1985
- Virginia Power General Engineering Standard, STD-GN-0025,
Equipment Qualification Standard
- North Anna Administrative procedure ADM-3.10, Environmental
Qualification Program
- North Anna Administrative procedure ADM-3.7, Engineering Work
Requests
- North Anna Administrative procedure ADM-16.4, Maintenance
Program
-
North Anna Administrative procedure ADM-16.9, Maintenance
-
North Anna Administrative procedure ADM-16.16, Nuclear Plant
Reliability Data System c9d Equipment Failure Evaluation and
Trending
-
General Engineering Nuclear Standard STD-GN-0023, Electrical
Procurement Standard
-
General Engineering Nuclear Standard, STD-GN-0001, Instructions
for DCP Preparation
-
Engineering and Construction Nuclear Design Control Manual I
Procedure No. 3.5, Design Document Preparation and Revision
The above procedures along with procedures discussed elsewhere in the
report confirm that an EQ program has been established for North
Anna. The procedures define the scope of the EQ Program and
responsibilities of various organizations for implementing it. The
procedures assign the Engineering and Construction Department (E & C)
responsibility to maintain the EQ Master List as a controlled.
document and to assemble and control documentation to support
~
qualification of equipment identified in the EQ Master List. E&C
also maintains the environmental zone descriptions, j
)
.
4
6. Environmental Qualification Master List (EQML)
The licensee is required to maintain an up to date list of the equipment
that must be qualified under 10 CFR 50.49. This list is entitled
Environmental Qualification Master List (EQML) and was prepared as
described in the licensee's Equipment Qualification Design Standard
STD-GN-0025, Rev. 3, Appendix B. The list was based on a review of the
Final Safety Analysis Report (FSAR), Technical Specifications, Emergency
Operating Procedures, and flow / electrical diagrams for Class 1E electrical
equipment that can be exposed to the harsh environmental effects of Design
Basis Accidents and which are required to function to bring the plant to a
safe shutdown condition. Other equipment evaluated included certain Post
Accident Monitoring (PAM) equipment and nonsafety related electrical
equipment whose failure under postulated harsh environmental conditions
could prevent the satisfactory accomplishment of safety functions.
i The licensee's first EQML was submitted in response to IEB 79-01B. It was
l reviewed and accepted by NRC on May 20, 1981. Subsequent and revised
l EQML's were also submitted to NRR for review. This review is detailed in
the Safety Evaluation Report, dated December 11, 1984. ;
l Equipment Qualification Standard, STD-GN-0025, Rev. 3, Section 4.2, is
'
used to maintain the list in an updated condition. This standard was
reviewed and determined to be adequate for establishing the methodology
for the preparation and maintenance of the EQML. To assess the
l
'
completeness of the current EQML, the Safety Injection System was selected
as the system for review. Associated flow diagrams (11715-FM-0958,
11715-FM-096A and 11715-FM-096B) and electrical elementary diagrams
(11715-ESK-6EQ, 11715-ESK-6ER) were reviewed to determine the system
components, such as; Motor Operated Valves (M0V's), Solenoid Valves
(S0V's), motors, and instrumentation that are required to bring the plant
to a safe shutdown condition. All items required to be on the EQML were
identified on the EQML. An item of concern was noted when reviewing the
Station's Emergency Operating Procedures. Step 7 of 1-EP-0, Reactor Trip
or Safety Injection, Rev.1.00, dated June 12, 1987, required the operator
to verify Charging /SI Flow by checking Flow Indicators, FI-1961,1962,
1963, 1943 or 1943-1. Flow Transmitters FT-1943 and 1943-1 provide
redundant indication of total system flow and were on the EQML. Flow
'
Transmitters 1961, 1962 and 1963, which provide individual SI flow to each
cold leg, were not on the EQML. The team's concern was that an
unqualified transmitter could provide inaccurate flow determination during
Design Basis Accidents and potentially mislead the operator. To alleviate
this concern Virginia Power committed to reviewing all their Emergency
Operating Procedures and delete references to unqualified instrumentation.
7. IE Information Notices (IENs) and Bulletins (IEBs)
The NRC inspectors reviewed and evaluated the licensee's activities
concerning the review of EQ-related IENs and Bulletins. The inspector's
review included examination of procedures and EQ documentation packages
relative to Information Notices and Bulletins. The procedure review
1
1
-_____ _ _ _ _ _ _ _
.
.
5
determined that the licensee does have a system for distributing,
reviewing, and evaluating IENs and Bulletins relative to equipment within
the scope of 10 CFR 50.49, and that IENs and Bulletins are addressed in
appropriate component EQ files. During the review of individual component
qualification files, the inspectors did not identify any concerns with
respect to Information Notices and/or Bulletins.
8. EQ Equipment Replacement and Spare Parts Procurement
General Engineering Nuclear Standard procedure STD-GN-0025, Equipment
Qualification Standard, defines the methodology used by the licensee to
ensure compliance with 10 CFR 50.49, and identifies actions to be taken to
maintain the qualification of equipment throughout its installed life.
This procedure delineates the requirements for procurement of new
equipment, i.e., first time purchase, replacement-in-kind equipment,
upgraded replacements, modules, and parts. Requirements: have been
established for upgrade of replacement equipment in accordance with 10 CFR
50.49(1); and sound reasons to the contrary have been documented for not
upgrading replacement equipment to this rule.
Administrative controls applicable to the preparation, review, approval,
document control, and change control of procurement documents are
described in the Nuclear Operations Department Standards and their
supporting procedures. Nuclear Operations Department standard number
NODS-MM01, Procurement Process, delineate the specific responsibilities of
personnel involved in the procurement process. It also defines the
equipment quality classification to be used in the procurement process,
and describes the various modes that may be employed in the procurement of
new or replacement equipment and spare parts. Applicable regulatory
requirements, design bases, and other requirements necessary to assure
adequate quality are delineated in the following lower tier implementing -
procedures:
-
ADM-4.0, Procurement Document Control, dated May 21, 1987
-
Engineering and Construction Nuclear Design Control Manual
No. 4.1, Procurement, Revision 2
- STD-GN-0011, Guidelines for Procurement Reviews, Revision 2
-
Nuclear Design Control Program Procedure No. 3.6, Procurement
Document Preparation, Revision 2.
Addendum No. 2 to ADM-4.0 provides specific guidance in the procurement of
electrical equipment. It requires procurement of new equipment, within
the scope of 10 CFR 50.49, to- be accomplished via an Engineering- Work
Request (EWR) or a Design Change Package (DCP). Additionally,-purchase
requisitions prepared for replacement equipment that are not required to be
upgraded are required to stipulate compliance with the equipment
qualification test report, and requires the vendor to supply a Certificate
of Conformance (C of C). Direct replacement of modules or spare parts are
-a
_ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
6
required to be procured from the original vendor who provides a C'of C
that their qualification report number is applicable to the replacement
module or part. The vendor is also required to identify any material
changes to the module or part since the qualification test was performed.
For situations where the vendor will not certify that the qualification
test report is applicable or; will not identify material changes or;
cannot be placed on the approved vendors list, an EWR is prepared and
forwarded to the engineering department for resolution. Engineering then
determines the item's critical attributes, its ability to perform its
safety related function, and the acceptable parameters for verification of
these attributes.
The adequacy of the implementation of the procurement procedural controls
was assessed by review of EWR Nos.86-012, 86-047,86-165, 85-829 and
related procurement documents. No violations or deviations were
identified in this area.
9. Control of EQ Related Modifications
Licensee design control program provides controls that ensure applicable
regulatory requirements and design bases are correctly translated into
specifications, drawings, procedures, and instructions to form a Design
Change Package (DCP). The following procedures delineate the design
controls applicable to plant modifications that impact electrical
equipment within the scope of 10 CFR 50.49:
-
STD-GN-0001, Instructions for DCP Preparation, Revision 8
-
STD-GN-0025, Equipment Qualification Standard, Revision 3
-
Engineering and Construction Nuclear Design Control Manual
Procedure No. 3.2, Design Change Package Preparation,
Revision 14
Procedure No. 3.5, Design Document Preparation and
Revision, Revision 2
Procedure STD-GN-0001 requires that an EQ review be performed on proposed
plant modifications to determine if material and/or equipment used or
affected by the modification are listed or should be listed on the
Environmental Qualification Master List (EQML). This review is intended
to ensure that affected equipment on the EQML or new equipment to be added
to the EQML has been reviewed, procured, and documented to meet the
requirements of 10 CFR 50.49. Changes to the EQML are included as an
Appendix to the DCP, and these changes are further documented on a EQML
Change form. Requirements have also been established for review of the
Environmental Zone Descriptions (EZDs) and updated FSAR to ensure that
equipment located in areas subject to submergence are qualified for this
type of service. Specific guidance for the preparation and revision of
the EQML, Qualification Data Review (QDR) packages, and EZDs are further
delineated in procedure number 3.5
!
.
7
The inspector reviewed three design change packages involving EQ related
modifications to determine the adequacy of the design controls regarding
EQ requirements. Acceptable procedural interface requirements were
identified with respect to personnel, training and knowledge of licensee's
employees involved with the DCPs preparation. Additionally, no EQ
deficiencies were identified in the DCPs reviewed.
10. EQ Training
Procedure ADM-3.10 delineates the requirements for the development and
implementation of a training program for personnel involved in various i
aspects of the EQ program. Responsibility has been assigned to the
Superintendent of Training for training of station personnel in the
requirements of the program, and the retention of training records which
provides objective evidence of completed training. The Environmental
Qualification Coordinator has also been assigned responsibility for
coordination and overview of the EQ training program with the Training
Department. He ensures that appropriate personnel are scheduled for EQ ,
'
training classes, and provides EQ related information for incorporation in
the lesson plans.
The inspector conducted interviews with licensee personnel to ascertain I
the scope and depth of the EQ training provided. Additionally, objective
evidence in the form of completed training records was requested for
selected members of the engineering staff, (both on-site and off-site).
The licensee presented completed "Envi ronmental Qualification
Certification of Training / Orientation" forms for nine staff members
involved in various EQ related activities. Review of the completed
training forms revealed that a mandatory reading list raouirement had been
established. This list dealing with EQ requirements consisteo cf IE
Circulars, Information Notices, and Bulletins, NUREGs, Franklin Research
Center (FRC) Technical Evaluation Reports, NRC correspondence, and
applicable industry codes and standards. No violations or deviations were ;
identified in this area. !
11. QA/QC Interface
The Manager of Quality Assurance and his staff has been assigned
responsibility for monitoring compliance with the QA Program for the
operational phase of the nuclear power stations. He also provides
technical support of quality related efforts associated with plant
modifications, operation and maintenance activities. The inspector
determined that u audit of the EQ Program was performed on October 10,
1984 with the audit findings documented in Audit Report No. N-84-34. The
scope of the audit covered a review of station activities to verify
compliance with the EQ program contained in the 1981 Safety Evaluation
Report (SER) and associated commitments.
_____________ ___-_____-______ __ -____ ______-
_ _ _ _ _ _ _ _ _ _ _ _ - _
__ ._
.
.
8
The inspector reviewed the corrective actions fnr selected audit findings
to assess the adequacy of the corrective actions. No inadequacies were
identified during this effort. He also conducted interviews with licensee
site QA department personnel to determine the degree of involvement of the
site QA organization with ongoing EQ activities. The inspector was
informed that various performance areas involving EQ related activities
are audited on a schedule basis as determined by the Technical Specifica-
tion schedule for auditing of the 10 CFR 50 Appendix B program. No
violations or deviations were identified in this area.
12. EQ Maintenance Program
A computer program had been developed by Virginia Power Company to help
monitor EQ related maintenance and to avoid overdue maintenance problems.
This system was explained to the inspectors and it appeared to be a
signficant enhancement to EQ and general plant maintenance management.
The QDR files contain a maintenance / surveillance section. This section
covers the maintenance requirements that are necessary to ensure continued
environmental qualification of the specific equipment. The station is
responsible for maintaining this equipment in a qualified condition by
incorporating EQ maintenance practices into station maintenance programs.
Review of the procedures listed in paragraph 5.a. Indicated that these
I
requirements have been, in general, properly incorporated into site and
department procedures. However, during this review three items were
identified in which the QDR EQ maintenance requirements were not
adequately addressed in station maintenance programs. These are as
follows.
a. Procedure MMP-C-S0V-1 is used to troubleshoot, repair, replace and/or
test solenoid valves. When this procedure is used there are actions
that can disturb or partially disassemble the electrical conductor
seal assembly (ECSA). The ECSA should be torqued to manufacture's
specifications as called for in the ECSA QDR file when it is
disturbed or partially disassembled. After the ECSA has been
disturbed or partially disassembled, there was no retorquing of
the ECSA in procedure MMP-C-S0V-1 before returning it to operability
status,
b. The low head safety injection (LHSI) motors are to have their
bearings replaced after operating a specified number of hours. There
was no procedure to track and record the number of operating hours and
no procedure to replace the bearings after the specified number of
operating hours.
c. The safeguard vent fans' QDR has an EQ maintenance- requirement to
change out the bearing grease or to sample it to ensure it is
satisfactory. This is to be accomplished..every refueling outage.
This requirement was not addressed in the station maintenance
program.
_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ -
.
.
9
The above items are identified as violation 50-338, 339/87-32-01, EQ
Maintenance Requirements listed in the QDR Files are not adequately
addressed in Station Maintenance Programs.
13. Environmental Qualification Document Files and Plant Physical Inspection
a. Qualification Document Review (QDR) Files
Virginia Power Co.'s EQ documentation files are established within
the corporate office engineering data and configuration control
system with duplicate files to be maintained at the site. The files
are called " Qualification Documentation Reviews" (QDR) and consist of
QDR Summary Sections, component evaluation worksheets (CEW),
Environmental Zone Description (EZD) sheets, reference lists,
parameter evaluations, accident profiles, installation and
maintenance requirements, NRC IENs and IEBs reconciliations, and
references including EQ test reports and supporting analyses, and
related correspondence.
A QDR is prepared for each specific type of qualified component
i
'
designated by manufacturer and model in a plant area exposed to the
same environmental service conditions.
The NRC inspectors examined QDR's for 25 selected equipment types.
In addition to comparing plant service conditions with qualification
test conditinns and verifying the bases for these conditions, the
inspectors selectively reviewed areas such as required post-accident
operating time compared to the duration of time the equipment has
been demonstrated to be qualified, similarity of tested equipment to
that installed in the plant (e.g., insulation class, materials of
components of the equipment, tested configuration compared to
installed configuration, and documentation of both), evaluation of
adequacy of test conditions, aging calculations for qualified life
and replacement interval determination, effects of decrease in
!
insulation resistance on equipment performance, adequacy of
demonstrated accuracy, evaluation of test anomalies, and
applicability of EQ problems reported in NRC IE Information Notices
and Bulletins and their resolutions. The more significant QDR
comments are discussed in the following Section c. Most of these
and other comments were resolved and/or corrected during the
inspection.
b. In Plant Physical Inspection
l The NRC inspection team physically inspected 32 qualified components
l and selected field run cables. This inspection was on both of the
North Anna units. The inspection team examined characteristics such
as mounting configurations, orientation, interfaces, name plate data,
,
ambient temperature, conductor seals and instrument moisture seals,
splices, terminal blocks, internal wiring and physical conditions.
- _ _ - -
b
.
.
f.
t
i 10
c. Specific Comments
The QDR and plant walkdown items discussed below were considered to
be the more significant findings:
(1) QDR 8.5, Rosemount Transmitters -. It was noted during the file
review that the _ test reports - to which . qualification. was -
established 'are dated 1983. The file showed . installation of
many of the transmitters in 1982. Thu licensee was asked to
show traceability to-the test reports. The licensee responded
by stating that the 1153D Rosemount transmitters installed in
1982 were installed per Design Change 81 S08. . The Design Change
(DC) states that the qualification of .the transmitters was in
process at the. time the DC was issued. Virginia Power was a
member of a Westinghouse Owner's Group that worked with
Rosemount to produce this type of , transmitter. The EQ tests
results were available for utility review in 1982, but' the
formal- report was not issued until 1983. The licensee orde. red'
, the transmitters and specified that they be qualified in'
accordance with the Rosemount Design Report and IEEE 323/1974.-
The transmitters are considered qualified and this explains the
date discrepancy.
(2) QDR 4.4, General Electric Notor, Model SK6319X51D - The motors
qualified using this file are located in containment at Zone
RC2168. These motors are used as inside recirculation spray
, pump motors and have' component . identification . numbers of
1-RS-P-1A, 1-RS-P-1B, 2-RS-P-1A, and 2-RS-P-1B.
l The licensee was questioned as to the location of the motors 'in
regard to submergence level. The QDR shows the motors to be at
the 216 foot level while the submergence level is_225 feet 11
inches. It was concluded after the plant walkdewn and
l
'
discussions with plant personnel that by virtue'.of.the pump
height and its vertical installation, the main body of the pump
~
and the motors are above the submergence level.
(3) QDR 3.1 - Limitorque Valve Actuators - The files showed the
actuators to be qualified to the requirements.of IEB 79-01B (D0R:
Guidelines)
The NRC hasfor unit-1
issued and NUREG~
several Information0588, category
Notices 83-72,(II- 86-02, for unit 2.
86-03, 86-71 and 87-08) that. apply to Limitorque = actuators.
Based on the' above, this inspection, and the licensee's
documentation', some of the actuators were considered unqualified
-after November 30, 1985. The large majorityLof the '
qualification concerns. involved internal wiring as discussed in
-
IEN 86-03. The ' licensee's ' documentation indicated that nine-
motors were' _ installed for which qualification documentation
could not be substantiated. These motors were listed as being
-qualified to - Limitorque test report B0003; however, the
,
.--a-- -- w_-m_ -.
,
%
.
11
licensee's QDR review indicated that I.D. numbers on the motors
did not match the normal numbering sequence used by the
manufacturers. Limitorque was advi_ sed of this finding and they
informed the licensee that qualification to the above test
report could not, in fact, be definitively applied to the motors -
in question. The foregoing is discussed in the licensee's
Deviation Report on Limitorque Outside Containment .MOV
Actuators, dated February 27, 1987. The questionable
i qualification conditions were properly evaluated and analyzed,
and justification for continued operation in the questionable
configuration was performed by the ' licensee.- These items were
reported and have subsequently been corrected.
The above indicates that unqualified equipment was installed in'
the plant as of November 30, 1985 as defined by G/L 85-15 and
l 10 CFR 50.49(j) and is a violation. Since the wiring issue has
been considered generic, it is excluded from this violation
'
based on SECY 87-32. This violation is identified as 50-338,
339/87-32-02, Unqualified Limitorque Operators.
l (4) Performance characteristic - The functional performance
l characteristic as specified in 10 CFR 50.49(d)(1) and (2), NUREG
!
0588, section 2.2(7)(10) and IEEE 323-74 Section 6.3.2(3)' for
equipment was not adequately addressed in the QDR Files. This
includes the accumulated effect of leakage currents, IR drops,
t and instrument accuracy on the. total loop accuracy for
l
instrumentation circuits along with the voltage, current, and
frequency variations'that could-affect satisfactory _ operation of-
the equipment during a potential . accident. Before the end of
the inspection the licensee prepared and presented partial
information which indicated that the performance specifications-
requirements had been considered, and that leakage currents were-
thought to be acceptable. The above constitute a violation to
10 CFR 50.49(j) and is identified as 50-338, 339/87-32-03,
l Performance Characteristic not adequately addressed in the QDR-
files.
(5) QDR 8.10 - Victoreen Radiation Monitor and Connector - This item 1
was included in the walkdown inspection and it was verified that
'
the installed unit is.the same as the EQ test unit. The cable
was completely sealed' in steel _ conduit as reconinended by
Victoreen. There were two concerns that were identified by the
file review. The first was that the ' accuracy of the monitor
( 36% demonstrated) was not discussed in regard to North Anna's.
requirements'. This is considered an example that falls under
discussion. of (4) above. The second. is that several: test
anomalies were encountered during the. test of the EQ unit.
These were considered not -to~ be adequately resolved by the
licensee. This is identified as an unresolved item 50-338,.
339/87-32-03, Test Anomalies . fron Victoreen Test Report not
adequately resolved in the QDR file.
_ __ - _ - - _ -
-__ _ _ _ _ _ _ _ _ _
.
12
(6) QDR 6.11 - Raychem Flamtrol Cable - This cable is 300V
instrument cable used inside and outside containment and
consists of XLPE insulation and XLPE jacket. The test used to
support qualification was performed by Franklin Research
Laboratory and involved simultaneous heat, steam, and radiation.
The two cable specimens which are similar to the installed
cables both failed the post-LOCA dielectric withstand test.
Post-test inspection revealed the cable insulation to be damaged
near the point of chamber penetration for these two specimens.
This appeared to be a reasonable explanation of the cause of the
anomaly. Low irs were also recorded for these specimens during
the LOCA test. The cables were considered qualified when the
concern regarding the effects of these low irs on instrumentation
was resolved. The only instrumentation connected to this type
of cable was outside of containment and the low irs were
considered to be due to the damage near the penetration.
l (7) QDR 6.2 - Rockbestos Cable - The Rockbestos cable (Firewall III
and Pyrotrol III) qualification basis was 00R Guidelines and
NUREG 0588 Category II. The file contained Rockbestoes reports
1806, 1807, 5804, and 5805, as well as Franklin reports
F-C2404-01, F-C2750, F-C2857, F-C2927, and F-C3050. The file
also contained NUREG 3588/ SAND 83-2406, which was used as a basis
l
for qualification (via similarity) of the Pyrotrol III and also
for " worst-case" insulation resistance values. The plants
contain the KXL-760, -A, B, -C, -D formulations as well as
KXL-510. However, the utility indicated that none of the
l KXL-510 is presently used in instrumentation circuits. The file
contained a generic assessment of leakage current effects, but
did not specifically analyze these effects for their
acceptability at North Anna. This is another example that falls
under the discussion of (4) above.
(8) QDR 8.8 - Ganma Metrics Neutron Flux Monitor - The qualification
basis for this file was NUREG-0588 Category I. The files
contained Gamma Metrics test reports #010 and #012, as well as
- 104 for the junction box 0-ring. The test conditions enveloped
the North Anna LOCA environment, with the exception of the
radiation dose. The test radiation dose of 3E09 rads is lower
than the expected 40 year dose of 4.8E09 rads. Thus, the file
contained notices that the monitor has a qualified lifetime of
. 26.5 years before replacement is necessary. The file also
l
contained a letter from Gamma Metrics indicating that a new
0-ring was being manufactured, superseding the original 0-ring.
.
'
The n6w 0-ring replacement schedule is once every 10 years,
whereas the old 0-ring was to be replaced once every 5 years.
The file contained references to both replacement schedules and
was somewhat confusing as to what schedule currently applied,
and whether the 5 or 10 year replacement schedule should be used
in the future. The utility agreed to nodify the file to remove
this confusion.
i
L_____- _ _ _ _ _ __ _ _ _ _ _ . _ __ ______-.__A._._.__ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ . _ _ _ ___-___-_.mm_ ___._... _.___a
.
13
(9) QDR 6.13 - Brand Rex 300V and 600V Cable - The qualification
basis for this cable was D0R Guidelines and NUREG-0588 Category
II. Franklin reports F-C5120 (-1 and 3) were used to qualify
the power and control cable, and Franklin' report F-C5120-4 was -
used to qualify the instrumentation cable. These cables have
XLPE (cross-linked polyethylene) insulation and CSPE (hypalon)'
jackets. The test environment enveloped the North Anna LOCA
environment. While the file did contain an error analysis (due
to insulation resistance effects), it did not demonstrate that
the calculated errors were acceptable for North Anna. This is
another example that falls under the discussion of (4) above.
(10) QDR file 171 - Connectron Terminal Blocks - This file was
I reviewed and found to be auditable. A minor administrative
deficiency existed in that the referenced test report was
included in its entirety at the end of Section G in the QDR
package, and a portion of the report was also included at the
beginning of Section G. 'The licensee committed to remove the
partial report and leave the : complete report at the end of
Section G. The test report had some anomalies that the licensee
had evaluated and determined that they were acceptable, however,
the licensee did not clearly state how the evaluation was
performed or what the basis was for accepting and/or resolving
these anomalies. The licensee committed to provide additional
clarification to address the anomalies. No violations were
identified.
(11) QDR 16.2 - Raychem Splices - The NRC inspector reviewed Virginia
Electric and Power Company's (now Virginia Power) (VEPC0's)
actions in response to IE Information Notice 86-53, " Improper-
Installation of Heatshrink Tubing." Temporary Instruction
(TI) 2500/17 was used as a guide for this inspection. As a
result of this review, including plant physical inspection of
l. splices, the inspector found that VEPC0 had conducted walkdowns
inspections of all heatshrink insulated splices in both units ,
at North Anna Power Station (NAPS) and detennined that many did
- not conform to the configurations originally tested and qualified
l by the manufacturer. (Raychem). Accordingly, VEPC0 initiated a-
design change package to replace. all deficient slices using
procedures that were verified to be consistent with current
Raychem installation specifications. This effort was almost ,
complete at the. time of the inspection and VEPC0 had committed
to completion on both units. prior to startup of Unit 2 from the
outage in progress. The replacement of splices already
accomplished was confirmed by the inspector's review of related
maintenance documents and by plant physical inspection. No
incorrectly installed splices were identified that were not 3
already scheduled for replacement. All the splices installed by '
the VEPC0 Design Change Package (DCP) that were inspected during
this inspection were satisfactory.
I
.
14
VEPC0's inspection results indicated that they had operated NAPS
after November 30, 1985 with splices not in a qualified
configuration. This constitutes a violation of paragraphs (f)
and (k) of 10 CFR 50.49 as follows:
Contrary to sections 5.2.2 and 5.2.6 of the D0R Guidelines,
for Unit 1, and contrary to section 5(1) of. NUREG 0588,
Category II, for Unit 2, qualification documentation for
Raychem splice insulation sleeves did not, establish similarity
between installed splices and those tested. VEPC0 failed to
ensure that Raychem splice insulation sleeves were installed
in a configuration similar to that in which they were tested.
Subsequent to discovering these deficiencies, VEPC0 had
developed information [ based on testing of Raychem splice.
configurations that deviated in various ways from the Raychem
specifications (information also known to the inspector)]that
indicated considerable deviation from Raychem specifications
could be accepted for harsh environmental performance. The
result of VEPCO's inspections indicated that many of their
splices deviated from Raychem installation guidelines. A large
majority of these fell within the constraints of the industry's
test for nonstandard Raychem configurations and were acceptable
based on the results of those test programs. VEPC0 concluded by
their evaluations and JC0's for the other nonstandard Raychem
splices that the equipment in question was operable. As indicated
above, all deficient (nonstandard) Raychem splice configurations
were replaced and up-graded to meet current Raychem specification.
Based on the above, unresolved item 50-338, 339/87-01-05 is closed
and up-graded to a violation identified as 50-338, 339/87-32-05,
Raychem Splice Sleeves in Unqualified Configurations.