Forwards List of Documents Re Util Overinspection Program to Be Sent to H Myers on Request.Documents Available in PDR
ML20237D944
Person / Time
Site: 05000000, Clinton
Issue date: 01/22/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay E
NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA)
Shared Package
ML082310219 List:
References
FOIA-87-726 NUDOCS 8712280045
Download: ML20237D944 (4)


Text

>*Ksc,

UNITED STATES u

0 NUCLEAR REGULATORY COMMisslON f

5) f' k

' REGION 118

'I f

799 ROOSEVELT RO AD j

j g

cLEN ELLYN. ILUNOIS Got 37 January 22, 1986

/* ED FAyGCA NOTE T0:

T. A. R tr.t for Operations, EDO FROM:

James G. Keppler, Regional Administrator, Region III.

SUBJECT:

REQUEST FROM DR. EENRY MYERS 1

l The attached documents are to be sent to Dr. Henry Myers at his request. All of the information is in the public document room.

N r~0 A utEdb &

James G. Keppler Regional Administrator

Attachment:

As stated 1

1 r

D l

8712200045 871222

! [

1/ f-i PDR FDIA WANNO7-726 PDR

,\\

I I

DOCUMENTS PERTAINING T0-THE ILLIN0IS POWER COMPANY OVERINSPECTION PROGRAM PROVIDED TO DR. HENRY MYERS j

)

1.

Letter, Knop to Gerstner, dated 10/12/83 transmitting Inspection Report 50-461/83-16 pertaining to the Overinspection Program

~ 2.

Report, dated 8/84 titled Summary of Quality Improvements and Confirmatory Actions (QICA) 3.

Letter, Norelius to Gerstner, dated 11/21/84 transmitting Inspection Report 50-461/84-37 documenting meeting on 10/25/84'to discuss proposed changes to the Overinspection Program 4.

Memo, Siegel to Schwencer, dated 12/26/84 documenting meeting between j

RIII, IE, and IAG to discuss the Overinspection Program and quality issues 5.

Letter, Zabel to Clark, et. al., dated 1/28/85 transmitting copy of Joint Stipulation 6.

Reports, 3 volumes dated 2/85 and titled Results of Quality Programs for Construction of Clinton Power Station 7.

Letter, Hall to Keppler, dated 3/29/85, U-0827, regardin'g changes to the Overinspection Program 8.

Letter, Hall to Keppler,- dated 3/29/85 U-0828, describing proposed changes in the IP Overinspection Program 1

9.

Letter, Hall to Denton/Keppler, dated 4/11/85, U-0834, transmitting an 1

updated attached volume titled Results of Quality Programs for Construction of Clinton Power Station l

1 10.

Letter, Keppler to Gerstner, dated 4/11/85 transmitting questions and I

comments regarding proposed changes to the Overinspection Program procedures.

11.

Letter, Samelson to Keppler, dated 4/12/85 transmitting IAG comments and questions regarding IP's Results of Quality Programs for Construction of CPS 12.

Letter, Hubbard to Warnick, dated 4/18/85 transmitting IAG comments and questions regarding IP letters U-0827 and U-0828 13.

Letter, Hall to Keppler, dated 4/19/85, U-600007, responding to NRC questions concerning CPS Overinspection Program implementing procedures I

L-j

s n

. p

f o

14.

Letter, Hall to Ke;pler,' dated 4/19/85, U-600008, responeirs to questions.

concerning IPs req est for concurrence to remove safety 'eiated piping and mechanical sup; orts from the Overinspection Program 1

l 15.

Letter, Keppler to Gerstner, dateo 5/8/85, transmitting.hsoection Report 50-461/85024 documenting a meeting to discuss proposed cranges to the Overinspection Program 16.

Letter, Keppler to Sanelson, dated 6/14/85, responding te IAG questions and comments relative.to IP's proposed changes to the Overinspection' q.

Program

'j, 17.

Letter, Hall to Keppler, dated 6/14/85, U-600163, transmitting pl j.

supplemental IP Overinspection Program results data 18.

Letter, Norelius te Samelson, dated 6/17/85, documenting a meeting i[

between RIII and tre IAG to discuss matters relating to P's.

Overinspection Program 19.

Letter, Keppler to Gerstner, dated 7/2/85, concurring in IP's request to terminate overinspection of safety related large and small bore piping and piping supports 20.

Letter, Hall to Keppler, dated 7/26/85, U-600197, requesting NRC concurrence to ternin. ate the Overinspection Program for electrical hangers 21.

Letter, Hall to Keppler, dated 8/6/85,..U-600211, requesting NRC concurrence to terminate the Overinspection Program for WAC duct' and duct supports

j 22.

Letter, Hall to Keppler, dated 8/8/85, U-600179, regardirq additional work performed to support proposed changes to IP's Overinspection Program 0 A 23.

Letter, Hall to Keppler, dated 8/12/85, U-600215, requesting NRC concurrence to teminate the Overinspection Program for cable tray, conduit, cable and cable terminations 24.

Letter, Samelson to Keppler, dated 8/27/85, providing the IAG's position regarding IP's requests to terminate part of the Overinspection Program t

y 25.

Letter, Keppler to Gerstner, dated 8/30/85, responding to IP'sl request to i

terminate the Overinspection Program for reinspection of electrical

']

hangers and HVAC ducts and supports 26.

Letter, Hall to Keppler, dated 6/6/85, U-600244, pertaining to IP's request to

~

terminate part ot the Overinspection Program i

k

_...__ - _a

t li

,i

- N si 27.

Letter, Samelson to Keppler, dated 9/12/85, providing the IAG s position regarding IP's proposal to terminate part of the Overinspection Program 28.

Letter, Keppler to Gerstner, dated 9/13/85, responding to IP's proposal to terminate part of the Overinspection Program 29.

Letter, Keppler to Samelson, dated 9/26/85, responding to IAG letters of 8/27/85 and 9/12/85 1

30.

Letter, Hall to Keppler, dated 10/11/85, U-600295, providing additional information to support IP's proposal to terminate part of the Overinspection Program 31.

Letter, Keppler to Gerstner, dated 11/21/85, responding to IP's request to terminate the Overinspection Program for electrical hangers; HVAC duct and duct supports; and cable tray, concuit, cable and cable terminations l