>*Ksc,
UNITED STATES u
0 NUCLEAR REGULATORY COMMisslON f
- 5) f' k
' REGION 118
'I f
j g
cLEN ELLYN. ILUNOIS Got 37 January 22, 1986
/* ED FAyGCA NOTE T0:
T. A. R tr.t for Operations, EDO FROM:
James G. Keppler, Regional Administrator, Region III.
SUBJECT:
REQUEST FROM DR. EENRY MYERS 1
l The attached documents are to be sent to Dr. Henry Myers at his request. All of the information is in the public document room.
N r~0 A utEdb &
James G. Keppler Regional Administrator
Attachment:
As stated 1
1 r
D l
8712200045 871222
! [
1/ f-i PDR FDIA WANNO7-726 PDR
,\\
I I
DOCUMENTS PERTAINING T0-THE ILLIN0IS POWER COMPANY OVERINSPECTION PROGRAM PROVIDED TO DR. HENRY MYERS j
)
1.
Letter, Knop to Gerstner, dated 10/12/83 transmitting Inspection Report 50-461/83-16 pertaining to the Overinspection Program
~ 2.
Report, dated 8/84 titled Summary of Quality Improvements and Confirmatory Actions (QICA) 3.
Letter, Norelius to Gerstner, dated 11/21/84 transmitting Inspection Report 50-461/84-37 documenting meeting on 10/25/84'to discuss proposed changes to the Overinspection Program 4.
Memo, Siegel to Schwencer, dated 12/26/84 documenting meeting between j
RIII, IE, and IAG to discuss the Overinspection Program and quality issues 5.
Letter, Zabel to Clark, et. al., dated 1/28/85 transmitting copy of Joint Stipulation 6.
Reports, 3 volumes dated 2/85 and titled Results of Quality Programs for Construction of Clinton Power Station 7.
Letter, Hall to Keppler, dated 3/29/85, U-0827, regardin'g changes to the Overinspection Program 8.
Letter, Hall to Keppler,- dated 3/29/85 U-0828, describing proposed changes in the IP Overinspection Program 1
9.
Letter, Hall to Denton/Keppler, dated 4/11/85, U-0834, transmitting an 1
updated attached volume titled Results of Quality Programs for Construction of Clinton Power Station l
1 10.
Letter, Keppler to Gerstner, dated 4/11/85 transmitting questions and I
comments regarding proposed changes to the Overinspection Program procedures.
11.
Letter, Samelson to Keppler, dated 4/12/85 transmitting IAG comments and questions regarding IP's Results of Quality Programs for Construction of CPS 12.
Letter, Hubbard to Warnick, dated 4/18/85 transmitting IAG comments and questions regarding IP letters U-0827 and U-0828 13.
Letter, Hall to Keppler, dated 4/19/85, U-600007, responding to NRC questions concerning CPS Overinspection Program implementing procedures I
L-j
s n
. p
- f o
14.
Letter, Hall to Ke;pler,' dated 4/19/85, U-600008, responeirs to questions.
concerning IPs req est for concurrence to remove safety 'eiated piping and mechanical sup; orts from the Overinspection Program 1
l 15.
Letter, Keppler to Gerstner, dateo 5/8/85, transmitting.hsoection Report 50-461/85024 documenting a meeting to discuss proposed cranges to the Overinspection Program 16.
Letter, Keppler to Sanelson, dated 6/14/85, responding te IAG questions and comments relative.to IP's proposed changes to the Overinspection' q.
Program
'j, 17.
Letter, Hall to Keppler, dated 6/14/85, U-600163, transmitting pl j.
supplemental IP Overinspection Program results data 18.
Letter, Norelius te Samelson, dated 6/17/85, documenting a meeting i[
between RIII and tre IAG to discuss matters relating to P's.
Overinspection Program 19.
Letter, Keppler to Gerstner, dated 7/2/85, concurring in IP's request to terminate overinspection of safety related large and small bore piping and piping supports 20.
Letter, Hall to Keppler, dated 7/26/85, U-600197, requesting NRC concurrence to ternin. ate the Overinspection Program for electrical hangers 21.
Letter, Hall to Keppler, dated 8/6/85,..U-600211, requesting NRC concurrence to terminate the Overinspection Program for WAC duct' and duct supports
- j 22.
Letter, Hall to Keppler, dated 8/8/85, U-600179, regardirq additional work performed to support proposed changes to IP's Overinspection Program 0 A 23.
Letter, Hall to Keppler, dated 8/12/85, U-600215, requesting NRC concurrence to teminate the Overinspection Program for cable tray, conduit, cable and cable terminations 24.
Letter, Samelson to Keppler, dated 8/27/85, providing the IAG's position regarding IP's requests to terminate part of the Overinspection Program t
y 25.
Letter, Keppler to Gerstner, dated 8/30/85, responding to IP'sl request to i
terminate the Overinspection Program for reinspection of electrical
']
hangers and HVAC ducts and supports 26.
Letter, Hall to Keppler, dated 6/6/85, U-600244, pertaining to IP's request to
~
terminate part ot the Overinspection Program i
k
_...__ - _a
t li
,i
- N si 27.
Letter, Samelson to Keppler, dated 9/12/85, providing the IAG s position regarding IP's proposal to terminate part of the Overinspection Program 28.
Letter, Keppler to Gerstner, dated 9/13/85, responding to IP's proposal to terminate part of the Overinspection Program 29.
Letter, Keppler to Samelson, dated 9/26/85, responding to IAG letters of 8/27/85 and 9/12/85 1
30.
Letter, Hall to Keppler, dated 10/11/85, U-600295, providing additional information to support IP's proposal to terminate part of the Overinspection Program 31.
Letter, Keppler to Gerstner, dated 11/21/85, responding to IP's request to terminate the Overinspection Program for electrical hangers; HVAC duct and duct supports; and cable tray, concuit, cable and cable terminations l