Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236H667 + (ML20236H667)
- ML20236H668 + (ML20236H668)
- ML20236H670 + (ML20236H670)
- ML20236H672 + (ML20236H672)
- ML20236H674 + (ML20236H674)
- ML20236H678 + (ML20236H678)
- PY-CEI-NRR-2292, Forwards Application for Order & Conforming Amend to License NFP-58,transferring Operating Authority for PNPP from Ceic & Centerior Svc Co to New Operating Company Named Firstenergy Nuclear Operating Co + (ML20236H680)
- ML20236H682 + (ML20236H682)
- ML20236H684 + (ML20236H684)
- ML20236H686 + (ML20236H686)
- ML20236H688 + (ML20236H688)
- ML20236H689 + (ML20236H689)
- ST-HL-AE-2315, Final Deficiency Rept Re Damage to Essential Cooling Water Pump Supplied by Hayward Tyler.Initially Reported on 870703.Pump Returned to Mfg for Refurbishment,Including Replacement of Bearings,Shaft Sleeves & Shafts + (ML20236H692)
- ML20236H693 + (ML20236H693)
- ML20236H694 + (ML20236H694)
- ML20236H695 + (ML20236H695)
- ML20236H697 + (ML20236H697)
- ML20236H699 + (ML20236H699)
- ML20236H701 + (ML20236H701)
- ML20236H705 + (ML20236H705)
- ML20236H708 + (ML20236H708)
- ML20236H709 + (ML20236H709)
- ML20236H710 + (ML20236H710)
- ML20236H712 + (ML20236H712)
- ML20236H713 + (ML20236H713)
- ML20236H714 + (ML20236H714)
- ML20236H715 + (ML20236H715)
- IR 05000416/1987017 + (ML20236H717)
- ML20236H719 + (ML20236H719)
- 05000482/LER-1987-029, :on 870701,discovered Verification of Automatic Pathway Isolation Not Performed on Quarterly Basis,Per Tech Spec 3.3.3.11.Caused by Faulty Procedures.Surveillance Completed on 870702.Procedures Will Be Updated + (ML20236H720)
- 05000482/LER-1987-042, :on 870930,hi-hi Water Level in Steam Generator D Initiated Feedwater Isolation Signal Tripping Main Turbine & Feedwater Pump.Caused by Cognitive Personnel Error.Sys Restored & Personnel Involved Counseled + (ML20236H721)
- ML20236H723 + (ML20236H723)
- ML20236H724 + (ML20236H724)
- ML20236H727 + (ML20236H727)
- ML20236H729 + (ML20236H729)
- IA-87-593, Forwards Secretary of Labor Decision & Final Order in Atchison Section 210 Case.W/O Encl + (ML20236H730)
- ML20236H730 + (ML20236H730)
- TXX-6606, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters.Initially Reported on 860321. Engineering Developing Design Mod Package (DM-86-140) Re Unit 1 Instrument Installations.Next Rept by 871202 + (ML20236H731)
- ML20236H732 + (ML20236H732)
- ML20236H733 + (ML20236H733)
- ML20236H734 + (ML20236H734)
- ML20236H735 + (ML20236H735)
- ML20236H736 + (ML20236H736)
- ML20236H738 + (ML20236H738)
- IR 05000346/1987016 + (ML20236H742)
- NOC-AE-000210, Forwards Signed Version of Revised Confirmatory Order Modifying License Confirming STP Commitments Re Thermo-Lag 330-1 & Consent of STP Nuclear Operating Co to Issuance of Order + (ML20236H743)
- NRC-87-3278, Forwards Gc Steinel & ED Goslin,Of Westinghouse, to Jp Mcvicker of Bg&E Re Broken Weld on Pole Shaft Assembly of Westinghouse Circuit Breaker Ds 206,per 871021 Telcon Request + (ML20236H744)
- ML20236H745 + (ML20236H745)
- ML20236H747 + (ML20236H747)
- ML20236H748 + (ML20236H748)
- ML20236H755 + (ML20236H755)