ML20236H668
| ML20236H668 | |
| Person / Time | |
|---|---|
| Issue date: | 06/24/1998 |
| From: | Dicus G NRC COMMISSION (OCM) |
| To: | Hoyle J NRC OFFICE OF THE SECRETARY (SECY) |
| Shared Package | |
| ML20236H630 | List: |
| References | |
| SECY-98-087-C, SECY-98-87-C, NUDOCS 9807070303 | |
| Download: ML20236H668 (1) | |
Text
____ _.
N OT ATIO N VOTE RESPONSE SHEEI
- TO:
John C. Hoyle o
Secretary of the Commission FROM:
COMMISSIONER DICUS
SUBJECT:
SECY-98-087 PROPOSED GENERIC LETTER 98-XX:
INTERIM GUIDANCE FOR UPDATED FINAL SAFETY ANALYSIS REPORTS IN ACCORDANCE WITH 10 CFR l
50.71(e)
Approved _ Disapproved X Abstain Not Participating Request Discussion COMMENTS:
While I commend the staff on this effort, I disapprove issuance of the draft generic letter at this time. The staff should continue their work with NEl and strive to agree oc. a guidance document that the NRC can endorse. I agree with Commissioner McGaffigan that the staff and NEl should be given the time to succeed in this effort. The staff and NEl are to reach closure on the NEl guidance document before December 31,1998. If the staff and NEI do not reach closure by this date, the staff should issue j
the draft generic letter the first week of January 1999. Meanwhile, the staff should ensure that inspections do not use the draft generic letter. Completeness and accuracy of the FSAR should be tied together and accomplished within six months of the issuance of either 1) the NRC endorsement of the NEI guidance or 2) issuance of the generic letter. Enforcement discretion should be extended until this i
date.
(
(A s es
, oxs QIGNATIJRD Release Vote / X / ~
/)aw 0%
119 f
~~
(J DATE Withhold Vote /
/
Entered on "AS" Yes X No i
('
9907070303 990630 i
f (2M_cormspcc__
i