Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217P011 + (ML20217P011)
- ML20217P012 + (ML20217P012)
- ML20217P013 + (ML20217P013)
- ML20217P014 + (ML20217P014)
- ML20217P015 + (ML20217P015)
- IR 05000315/1998005 + (ML20217P018)
- 05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project + (ML20217P020)
- NSD-NRC-97-5282, Forwards non-proprietary & Proprietary Correspondence Previously Sent Informally Over Period of 970519-0530. Proprietary Info Withheld,Per 10CFR2.790 + (ML20217P021)
- SVP-98-160, Forwards 1997 Annual Radiological Environ Operating Rept for Quad Cities Station. Rept Contains Results of Radiological Environ Meteorological Monitoring Programs + (ML20217P022)
- ML20217P024 + (ML20217P024)
- 05000454/LER-1997-023, :on 971229,1B DG Control Power Wiring Discrepancy Occurred Due to Mod Installation Error & Programmatic Deficiencies.Caused by Failure to Use self-check Principles.Counseled Technician + (ML20217P026)
- 05000327/LER-1999-002-03, :on 990916,EDG Started as Result of Cable Being Damaged During Installation of Thermo-Lag for Kaowool Upgrade Project.Caused by Inadequate pre-job Briefing. Involved Individuals Were Counseled on Event + (ML20217P027)
- ML20217P028 + (ML20217P028)
- ML20217P029 + (ML20217P029)
- 05000336/LER-1997-033-01, Forwards LER 97-033-01,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970727.LER Submitted Per 10CFR50.73(a)(2)(ii) & 10CFR50.73(a)(2)(v) + (ML20217P030)
- ML20217P031 + (ML20217P031)
- ML20217P032 + (ML20217P032)
- ML20217P033 + (ML20217P033)
- ML20217P038 + (ML20217P038)
- ML20217P039 + (ML20217P039)
- ML20217P040 + (ML20217P040)
- ML20217P041 + (ML20217P041)
- ML20217P042 + (ML20217P042)
- ML20217P043 + (ML20217P043)
- ML20217P045 + (ML20217P045)
- ML20217P047 + (ML20217P047)
- ML20217P049 + (ML20217P049)
- ML20217P050 + (ML20217P050)
- ML20217P054 + (ML20217P054)
- ML20217P055 + (ML20217P055)
- NRC-98-0062, Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/4 + (ML20217P056)
- ML20217P057 + (ML20217P057)
- L-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld + (ML20217P059)
- ML20217P060 + (ML20217P060)
- ML20217P062 + (ML20217P062)
- ML20217P063 + (ML20217P063)
- ML20217P064 + (ML20217P064)
- ML20217P065 + (ML20217P065)
- ML20217P066 + (ML20217P066)
- BSEP-98-0052, Forwards Supplemental Info Re Maint Rule Expert Panel Meeting Minutes for Meetings Conducted Between 970812-1203, Inadvertently Omitted from 980225 Submittal + (ML20217P067)
- ML20217P069 + (ML20217P069)
- ML20217P070 + (ML20217P070)
- ML20217P072 + (ML20217P072)
- ML20217P073 + (ML20217P073)
- NRC-98-0028, Informs NRC of Planned Change in Commitment for Plant Re Requirements Relocated from Operating License NPF-43,App a, Tech Specs.Nrc GL 91-08 Provided Guidance for Licensees Requesting License Amend for Removal of Certain Component + (ML20217P074)
- ML20217P075 + (ML20217P075)
- ML20217P076 + (ML20217P076)
- ML20217P079 + (ML20217P079)
- ML20217P081 + (ML20217P081)
- ML20217P082 + (ML20217P082)
- ML20217P084 + (ML20217P084)