o November MEMORANDUM TO: John Austin, Chief 29,(1995 Performance Assessment and .
Hydrology Branch E Division of Waste Management
. Michael Bell, Cntef Eng;neering and Geosciences Branch y Division of Waste Management FROM: Daniel' Gillen, Acting Branch Chief .
High-Level Waste and UraniumLR ecovery Projects Branch I t
SUBJECT:
REVIEW OF REMEDIAL ACTION PLAN FOR THE NATURITA, COLORADO, TITLEjDISPOSALSITE 3
The attached U.S. Department of Energy (DOE) Re' medial Action Plan (RAP) was received on November 17 *51995. This memorandum is to request your support in expediting the review ofithe Remedial Action Plan and Site Design for Stabilization of the Naturita Title I Residual Radioactive Materials at the Upper Burbank Repository', Uravan, Colorado. In' response to concerns from the d- State of Colorado and the Town of Naturita, and a request from the DOE, we
[ agreed to review the Naturita RAP as expeditiously as possible. To ensure 1_ that goal, reviewers familiar with the RAP review process should be assigned to the review. This would result in a review team of Latif Hamdan, Ted Johnson, Dan Rom, Elaine Brumett, and a geologist as needed.
The RAP provides the details of the site design for the relocated residual radioactive materials from the Naturita, Colorado, Title I site. Note that
[
a this RAP only addresses the new disposal site. The remedial action details on the Naturita site cleanup have not changed from the previously-reviewed RAP,
=
and are referenced in total. The RAP contains information necessary to <
initiate the review, but the letter from DOE (copy attached) also discusses I e scoe areas of the RAP where information may be incomplete. For example, s additional technical studies are being conducted to verify some design values at this time. The results of those tests will be made available to the NRC
_ within the next few weeks. Other test results (See pages 3 and 4 of DOE letter) will be made available shortly. The staff should review the available information and, in the Technical Evaluation Report (TER) that documents the 3
results of that review, identify areas where additional information is needed.
' Please have your Section Leaders notify the Project Manager (PM) for the Naturita site, Ms. Charlotte Abrams, of any problems associated with establishing the review team discussed above. HLUR proposes to issue a draft TER to DOE on December 22, 1995, and to meet that schedule, TER sections should be provided to the PM by December 18.
DISTRIBUTION w/ Encl.: &agtsGT491e+ NMSS r/f DWM r/f HLUR r/f DBrooks KMcConnell JHolonich w/o Encl.: JSurmeier MFederline g DOCWDIT NAME: St\DW\HLUR\CEA\MATRAF 0FC HLUR HLUR /"b/_ L NAME CAbran d DGilleb DATE 11/11/95 T ll/P/95 "H OFFICIAL REC W COPY ..(
1 1 r. ' it , ,y 9910290191 991027 PDR FOIA MIDDLET99-336 PDR
i-1; f:
1995 November 29, f
[EMOP.A400MTO: John Austin, Chief Performance Assessment and '
Hydrology Branch &
Division of Waste Management
. Michael Bell, Chief Engineering and Geosciences Branch y Division of Waste Management' FROM: Daniel' Gillen, Acting Branch Chief High-Level Waste and UraniumL R ecovery Projects Branch t
SUBJECT:
REVIEW OF REMEDIAL ACTION PLAN FOR THE NATURITA, COLORADO, TITLEjDISPOSALSITE The attached U.S. Department of Energy (DOE) Re' medial Action Plan (RAP) was received on November 17,11995. This memorandum is to request your support in expediting the review ofithe Remedial Action Plan and Site Design for Stabilization of the Nat'urita Title I Residual Radioactive Materials at the i Upper Burbank Repository', Uravan, Colorado. In' response to concerns from the 0- State of Colorado and the Town of Naturita, and a request fron the DOE, we
[ agreed to review the Naturita RAP as expeditiously as possible. To ensure L_ that goal, reviewers familiar with the RAP review process should be assigned to the review. This would result in a review team of Latif Hamdan, Ted Johnson, Dan Rom, Elaint Brummett, and a geologist as needed.
The RAP provides the details of the site Jesign for the relocated rest',Jal radioactive r,aterials from the Naturita, Colorado, Title I site. Note that this RAP only addresses the new disposal site. The remedial action details on J the Naturita site cleanup have not changed from the previously-reviewed RAP.
and are referenced in total. The RAP contains information necessary to initiate the resiew, but the letter from DOE (copy attached) also discusses
. some areas of the RAP where information may be incomplete. For example,
- additional technical studies are being conducted to verify some design values at this time. The results of those tests will be made available to the NRC within the next few weeks. Other test results (See pages 3 and 4 of DOE
~
letter) will be made available shortly. The staff should review the available ;
information and, in the Technical Evaluation Report (TER) that documents the i 3
results of that review, identify areas where additional information is needed.
Please have your Section Leaders notify the Project Manager (PM) for the Naturita site, Ms. Charlotte Abrams, of any problems associated with establishing the review team discussed above. HLUR proposes to issue a draft TER to DOE on December 22, 1995, and to meet that schedule, TER sections should be provided to the PM by December 18.
DISTRIBUTION w/ Encl.: Eastp574 Hee NMSS r/f DWM r/f HLUR r/f DBrooks KMcConnell JHolonich w/o Encl.: JSunneler MFederline K
DOCUMENT NAME: St\DWN\HLUR\CEA\NATRAP 0FC HLUR HLUR ( h L !
MAME CAbran M DGillef DATE 11/11/95 [ 11/f/95 4
0FFICIAL REC 1HtD COPY 1 i 1 r et , M1