Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217N417 + (ML20217N417)
- ML20217N419 + (ML20217N419)
- ML20217N420 + (ML20217N420)
- ML20217N422 + (ML20217N422)
- ML20217N424 + (ML20217N424)
- ML20217N426 + (ML20217N426)
- ML20217N428 + (ML20217N428)
- ML20217N430 + (ML20217N430)
- IA-97-486, Site Decommissioning Mgt Plan + (ML20217N431)
- ML20217N431 + (ML20217N431)
- ML20217N432 + (ML20217N432)
- ML20217N434 + (ML20217N434)
- ML20217N435 + (ML20217N435)
- 05000382/LER-1998-004, :on 980304,TS 4.0.3 Condition - CPC Channel Functional Test,Was Concluded from Preliminary CEOG Rept. Caused by Human Error.Cpc Channels A,B & C Were Satisfactorily Tested + (ML20217N436)
- 3F0897-09, Provides Response to Request for Addl Info Re TS Change Request Notice 211,Rev 0.Attachment a Provides List of Regulatory Commitments Made in Submittal + (ML20217N437)
- ML20217N438 + (ML20217N438)
- ML20217N439 + (ML20217N439)
- ML20217N440 + (ML20217N440)
- ML20217N441 + (ML20217N441)
- NOC-AE-0123, Submits Rept of Nuclear Insurance Protection,Per 10FR50.54(w)(3).Property Policies,Encl + (ML20217N443)
- ML20217N446 + (ML20217N446)
- ML20217N447 + (ML20217N447)
- ML20217N448 + (ML20217N448)
- ML20217N449 + (ML20217N449)
- RC-98-0095, Annual Effluent & Waste Disposal Rept for VC Summer Nuclear Station for Operating Period 970101-1231 + (ML20217N450)
- ML20217N451 + (ML20217N451)
- ML20217N452 + (ML20217N452)
- BSEP-97-0361, Forwards Rev 1 to Physical Security & Safeguards Contingency Plan for Bsep,Units 1 & 2.Plan Withheld + (ML20217N456)
- NSD-NRC-98-5596, Forwards Westinghouse Responses to FSER Open Items on AP600. Summary of Encl Responses Provided in Table 1.NRC Should Review Encls & Inform Westinghouse of Status to Be Designated in NRC Status Column of Oits + (ML20217N457)
- ML20217N458 + (ML20217N458)
- 05000412/LER-1998-002, Forwards LER 98-002-00,re Inadequate Testing of Diesel Fuel Oil Transfer Pumps as Required by TS + (ML20217N459)
- ML20217N461 + (ML20217N461)
- ML20217N462 + (ML20217N462)
- RBG-44453, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/98-03 on 980223-26.Corrective Actions:Added Item to Commitment Tracking Sys to Ensure Preparation of Annual Summary Rept on or Before Apr 30 of Each Year + (ML20217N463)
- ML20217N467 + (ML20217N467)
- NOC-AE-000117, Provides 90-day Response to GL 97-06, Degradation of SG Internals. Industry Effort Has Scheduled Detailed Evaluation of Model E SG Design to Be Completed by Middle of 1998 + (ML20217N468)
- ML20217N469 + (ML20217N469)
- ML20217N472 + (ML20217N472)
- ML20217N473 + (ML20217N473)
- NSD-NRC-98-5591, Forwards W Responses to RAI 640.166 & 640.170 Through 640.172 Re Comments in Design Descriptions,Repts & Functional Arrangement Drawings Re Rev 3 of AP600 Certified Design Matl.Submittal Closes Open Items 6510 & 6514-6516 + (ML20217N474)
- BSEP-99-0170, Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6) + (ML20217N475)
- ML20217N476 + (ML20217N476)
- ML20217N477 + (ML20217N477)
- ML20217N479 + (ML20217N479)
- ML20217N480 + (ML20217N480)
- B16578, Monthly Operating Rept for Jul 1997 for Millstone Nuclear Power Station Unit 3 + (ML20217N481)
- ML20217N482 + (ML20217N482)
- 05000412/LER-1998-002-01, :on 980206,inadequate Testing of Diesel Fuel Transfer Pumps as Required by Ts,Was Identified.Caused by Inadequate Application & Understanding of Ts.Surveillance Procedures 20ST-36.1 & 20ST-36.2 Were Revised + (ML20217N483)
- ML20217N485 + (ML20217N485)
- IA-98-154, Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR + (ML20217N488)
- ML20217N488 + (ML20217N488)