Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed + (ML20216E698)
- ML20216E699 + (ML20216E699)
- IR 05000382/1997011 + (ML20216E700)
- ML20216E703 + (ML20216E703)
- LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With + (ML20216E707)
- ML20216E711 + (ML20216E711)
- ML20216E713 + (ML20216E713)
- ML20216E715 + (ML20216E715)
- ML20216E716 + (ML20216E716)
- W3P87-1099, Forwards Public Version of Emergency Plan Implementing Procedures,Including Rev 7 to EP-2-052, Protective Action Guidelines & Rev 10 to EP-2-060, Radiological Field Monitoring. W/870624 Release Memo + (ML20216E717)
- ML20216E718 + (ML20216E718)
- NPL-98-0183, Responds to NRC Re Violations Noted in Insp Repts 50-266/97-26 & 50-301/97-26 on 971201-980120.Corrective Actions:Addendum to Four Hour non-emergency NRC Notification Was Made on 980113 + (ML20216E719)
- ML20216E721 + (ML20216E721)
- ML20216E724 + (ML20216E724)
- ML20216E729 + (ML20216E729)
- ML20216E730 + (ML20216E730)
- ML20216E738 + (ML20216E738)
- ML20216E740 + (ML20216E740)
- A97016, Provides Response to 970107 RAI Concerning Containment Coatings at Plant + (ML20216E741)
- ML20216E742 + (ML20216E742)
- ML20216E743 + (ML20216E743)
- ML20216E744 + (ML20216E744)
- ML20216E748 + (ML20216E748)
- ML20216E749 + (ML20216E749)
- ML20216E754 + (ML20216E754)
- IR 07100029/2012001 + (ML20216E755)
- ML20216E757 + (ML20216E757)
- ML20216E760 + (ML20216E760)
- ML20216E761 + (ML20216E761)
- ML20216E762 + (ML20216E762)
- ML20216E764 + (ML20216E764)
- ML20216E765 + (ML20216E765)
- ML20216E766 + (ML20216E766)
- ML20216E769 + (ML20216E769)
- 0CAN039803, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/97-21 & 50-368/97-21.Corrective Actions:Vendor Analysis of Excessive Flowrate Was Performed + (ML20216E770)
- ML20216E771 + (ML20216E771)
- ML20216E772 + (ML20216E772)
- ML20216E773 + (ML20216E773)
- ML20216E775 + (ML20216E775)
- ML20216E779 + (ML20216E779)
- ML20216E780 + (ML20216E780)
- ML20216E782 + (ML20216E782)
- 05000295/LER-1997-017-01, :on 970806,TS Surveillance on Containment Isolation Valve Operability After Maint Was Missed.Caused by Personnel Error.Procedure Writer Who Failed to Identify Remaining Procedures by 1993 UFSAR Rev Has Been Counseled + (ML20216E783)
- ML20216E787 + (ML20216E787)
- ML20216E788 + (ML20216E788)
- ML20216E789 + (ML20216E789)
- ML20216E790 + (ML20216E790)
- ML20216E793 + (ML20216E793)
- IR 05000354/1997006 + (ML20216E794)
- ML20216E795 + (ML20216E795)
- ML20216E796 + (ML20216E796)