ML20216E773
| ML20216E773 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/10/1998 |
| From: | Skinner P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Sumner H SOUTHERN NUCLEAR OPERATING CO. |
| Shared Package | |
| ML20216E778 | List: |
| References | |
| 50-321-97-12, 50-366-97-12, NUDOCS 9803180154 | |
| Download: ML20216E773 (5) | |
See also: IR 05000321/1997012
Text
,
/.-
h-
4
i
March 10, 1998
'
! N
(-
4
l
1 Southern Nuclear Operating Coapany. Inc.
ATTN: : Mr. H. L. Sumner. Jr.
Vice President. Hatch Plant
Nuclear Operations
l
P.O. Box 1295.
Birmingham. AL 35201
SUBJECT:
. NRC INTEGRATED INSPECTION REPORT 50-321/97-12. 50-366/97-12 AND
1
,
Dear Mr. Sumner:
On February 7.1998, the NRC completed an insaection at your Hatch facility.
The enclosed report presents the results of t1at inspection.
In addition, the
,
!
results of an engineering inspection conducted at your corporate headquarters
in December 1997 are included.
During the 6-week aeriod covered by this inspection report, your conduct of
activities at the latch facility was generally characterized by safety-
conscious operations, sound engineering and maintenance practices, and careful
radiological work controls.
The violations are cited in the enclosed Notice of Violation (Noticey, and the
.
circumstances-surrounding the violations are described in detail in the
enclosed report.
We are concerned about the violations and weaknesses
associated with the identification of debris having low-level contamination
unconditionally released to your onsite landfill. . Such releases could lead to
unnecessary personnel exposure or contamination.
Your response should
address, in detail, the adequacy of program guidance, management oversight.
- and survey documentation for the identified event.
~ Please note that you are required to respond to this letter and should follow
the instructions ~ specified in the enclosed Notice when preparing your
response. The NRC will use your response, in part, to determine whether
further enforcement action is necessary to ensure compliance with regulatory
requirements.
l
1
,
,
i
I
l
,
6
I
9803100154 980310
ADOCK 05000321
G
4
,
i
)
gd/
1
2
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a co)y of
this letter its enclosures, and ~your response will be placed in the NRC
Public Document Room (PDR).
I
Sincerely.
(Original signed by
Pierce H. Skinner)
Pierce H. Skinner Chief
Reactor Projects Branch 2
Division of Reactor Projects
j
1
Docket Nos.:
60-321 and 50-366
i
License Nos.
Enclosures:
1.
i
2.
NRC Inspection Report 50-321/97-12
and 50-366/97-12
cc w/encls:
J. D. Woodard
Executive Vice President
Southern Nuclear Operating Company. Inc.
P. O. Box 1295
Birmingham. AL 35201-1295
P. H. Wells
General Manager Plant Hatch
Southern Nuclear Operating Company. Inc.
1
U. S. Highway 1 North
P. O. Box 2010
Baxley, GA 31515
0. M. Crowe
Manager Licensing - Hatch
Southern Nuclear Operating Company. Inc.
1
P. O. Box 1295
Birmingham, AL 35201-1295
4
cc w/encls cont'd:
(See Page 3)
,
r
>
3
l
cc w/encls (continued):
Ernest-L. Blake. Esq.
Shaw..Pittman. Potts and
Trowbridge
l
2300 N Street. NW
Washington. D. C.
20037
'
Office of Planning and Budget
'
Room 610
270 Washington Street. SW
Atlanta, GA 30334
Director
Department of Natural Resources
205 Butler Street. SE. Suite 1252
Atlanta GA 30334
Manager Radioactive Materials Program
Department of Natural Resources
4244 International Parkway
Suite 114
Atlanta. GA 30354
Chairman
Appling County Commissioners
County Courthouse
Baxley GA 31513
Program Manager
Fossil & Nuclear Operations
Dglethor)e Power Corporation
2100 E.
Exchange Place
Tucker. GA 30085-1349
Charles A. Patrizia. Esq.
Paul. Hastings. Janofsky & Walker
10th Floor
1299 Pennsylvania Avenue
Washington. D. C.
20004-9500
l
cc w/encls cont'd:
(See Page 4)
i
!
L..
r-
,
I
L
l
l
-SNC
4
I
'
cc w/encls-(continued):
l
Senior Engineer - Power Supply
!
Municipal Electric Authority
of Georgia
1470 Riveredge Parkway NW
,
l
Atlanta.-GA 30328-4684
l
Distribution w/encls:
P. H. Skinner RII
<
l
R. P. Carrion. RII
W. P. Kleinsorge RII
L. Olshan NRR
P.UBLIC
NRC Resident Inspector
1
U.S. Nuclear Regulatory Commission
11030 Hatch Parkway North
Baxley. GA 31513
i
I
UFFICE
RII,:DRP
Ril:DIIP
RII:DIIP
Ell:DRP
I,y :
$?
[h
rhhff\\
HAfE -
EPCarrlon:dka
CWRapp
BLNoltrook
JACanady
j {do
l
f
DATE
3/ / o /95
3/ / O K
3/
/95
3/
/95
[~3/ p /95
3/
/95
3/
/95
uri r
/TES )
YES [ A/0)
YES
TES
/TES )
YES
TES
V
"
OFFICTAL RECORD COPY
DOCL8ENT NAME: G:\\MATCN\\MTT12ilR.DFT
l
j
03-09-1998 04:49PM
PLANT HATCH
i 912 367 6297
P.01
__.
OFFICE
Ril:DRP
Ril:DRP
Ril:DRP
Ril:DRP
Ril:DRS
gg y Mu,4
SIGNAT
7W
URE
NAME
RCarrion:
CWRapp
BLHolbrookf4ACanady
GBKuzo
dka
DATE
W
19 8
31
19 8
31 7 198
3/ 9 198
3/
198
31
19 8
COPY?
YES
YES
YES
S
YES
YES
YE
NO
NO
(CD
NO
NO
NO
OFFICIAL RECORD COPY
DOCUMENT NAME:
,
l
l
omm row es c-.e
l
FAX TRANSMITTAL
e er = * /
8. [Rls A)
'
g.
,
--
_
,
'~ '(6. 1%(bW
'
.,....,n.,
. . .
- - -
l
l
l
l
.
TOTAL P.01