Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000213/LER-1997-014, :on 970808,ESFA Occurred Due to Deenergization of High Containment Pressure Actuation Circuits.Reemphasized Expectations of Mgt for Performing non-routine Operational Tasks + (ML20216E503)
- ML20216E504 + (ML20216E504)
- ML20216E506 + (ML20216E506)
- 05000213/LER-1997-013, :on 970807,inadvertent Halon Discharge in CR Occurred Due to Camera Flash Resulted in Precautionary CR Evacuation.Installed Protective Cover Over Eprom Window & Evaluated Other Sys + (ML20216E507)
- ML20216E508 + (ML20216E508)
- ML20216E511 + (ML20216E511)
- ML20216E513 + (ML20216E513)
- B16719, Informs That Cj Tabone & Wg Noll Will No Longer Need to Maintain Following Licenses + (ML20216E515)
- ML20216E518 + (ML20216E518)
- ML20216E524 + (ML20216E524)
- ML20216E525 + (ML20216E525)
- ML20216E526 + (ML20216E526)
- B16720, Provides NRC W/Updated Millstone Unit 1 TS Bases Sections 3.7 & 4.7,revising Affected Common Pages & Distributing Changes to Controlled Copyholders.Ts Encl + (ML20216E528)
- ML20216E529 + (ML20216E529)
- ML20216E530 + (ML20216E530)
- LR-N990395, Provides Comments on NRC Ltr Dtd 990714, Closure of TAC Number MA1194 - Response to RAIs to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Hope Creek Generating Sation. Revised GE Report Encl Also + (ML20216E531)
- ML20216E534 + (ML20216E534)
- ML20216E535 + (ML20216E535)
- ML20216E536 + (ML20216E536)
- ML20216E540 + (ML20216E540)
- ML20216E541 + (ML20216E541)
- ML20216E543 + (ML20216E543)
- 3F0997-11, Forwards Response to 970812 RAI Re Proposed License Amend for low-temp Overpressure Protection + (ML20216E544)
- ML20216E545 + (ML20216E545)
- SVP-98-087, Monthly Operating Repts for Feb 1998 for Quad Cities Nuclear Station,Units 1 & 2 + (ML20216E547)
- ML20216E549 + (ML20216E549)
- ML20216E550 + (ML20216E550)
- ML20216E551 + (ML20216E551)
- ML20216E555 + (ML20216E555)
- ML20216E556 + (ML20216E556)
- ML20216E557 + (ML20216E557)
- ML20216E558 + (ML20216E558)
- ML20216E559 + (ML20216E559)
- ML20216E560 + (ML20216E560)
- ML20216E565 + (ML20216E565)
- RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted + (ML20216E567)
- ML20216E569 + (ML20216E569)
- ML20216E572 + (ML20216E572)
- 05000483/LER-1999-003, :on 990811,pipe Rupture Occurred in Six Inch Drain Line Located Between D Moisture Separator Reheater First Stage Reheater Drain Tank.Caused by Flow Accelerated Corrosion.Ruptured Piping Replaced.With + (ML20216E573)
- ML20216E574 + (ML20216E574)
- ML20216E575 + (ML20216E575)
- ML20216E580 + (ML20216E580)
- ML20216E584 + (ML20216E584)
- ML20216E589 + (ML20216E589)
- 05000269/LER-1999-006-01, :on 990818,Unit 1 Tripped.Caused by Equipment Malfunction of Rod Group 5 Programmer.Programmer Replaced. with + (ML20216E592)
- ML20216E594 + (ML20216E594)
- ML20216E596 + (ML20216E596)
- ML20216E599 + (ML20216E599)
- ML20216E603 + (ML20216E603)
- ML20216E604 + (ML20216E604)
- ML20216E605 + (ML20216E605)