Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215L674 + (ML20215L674)
- ML20215L675 + (ML20215L675)
- ML20215L677 + (ML20215L677)
- NLS8700233, Forwards Revised Page 2 of Util Re Adequacy of Scheduled ATWS Mods Meeting Requirements of 10CFR50.62.Encl Corrects Size of Suction Lines for Standby Liquid Control Sys + (ML20215L678)
- ML20215L679 + (ML20215L679)
- ML20215L681 + (ML20215L681)
- ML20215L682 + (ML20215L682)
- ML20215L683 + (ML20215L683)
- ML20215L684 + (ML20215L684)
- ML20215L685 + (ML20215L685)
- L-87-264, Responds to Generic Ltr 86-06, Periodic Verification of Leaktight Integrity of Pressure Isolation Valves (Pivs). List of PIVs & Procedures for Periodic Test or Other Measures Performed to Assure Integrity of Valve Encl + (ML20215L686)
- ML20215L687 + (ML20215L687)
- ML20215L689 + (ML20215L689)
- ST-HL-AE-2269, Informs of Intention to Disable Transfer Switch So That 13.8-kV Switchgear Will Be Connected to Normal 125 Volt Dc Control Power Source.Corrective Action Will Be Implemented by First Refueling Outage + (ML20215L690)
- ML20215L693 + (ML20215L693)
- ML20215L694 + (ML20215L694)
- ML20215L695 + (ML20215L695)
- ML20215L696 + (ML20215L696)
- ML20215L699 + (ML20215L699)
- ML20215L700 + (ML20215L700)
- ML20215L701 + (ML20215L701)
- ML20215L703 + (ML20215L703)
- ML20215L704 + (ML20215L704)
- 05000282/LER-1987-005-01, :on 870409,while in Cold Shutdown,Status Lights for Both Trains of Auxiliary & Turbine Bldgs Steam Exclusion Dampers Discovered Off.Caused by Design Flaw.Mod Initiated to Separate Power Supplies + (ML20215L706)
- ML20215L708 + (ML20215L708)
- ML20215L709 + (ML20215L709)
- ML20215L710 + (ML20215L710)
- ML20215L711 + (ML20215L711)
- ML20215L712 + (ML20215L712)
- JAFP-87-0393, Monthly Operating Rept for Apr 1987 + (ML20215L714)
- ML20215L715 + (ML20215L715)
- ML20215L719 + (ML20215L719)
- ST-HL-AE-2157, Advises That Category I Structures Completed.Const Dewatering of Plant Areas Terminated in Jan 1987.Monitoring of Groundwater Levels Will Continue Using Permanent Piezometer Sys + (ML20215L721)
- ML20215L722 + (ML20215L722)
- IA-86-588, Reiterates L Robertson 860707 Telcon Request for Two Fixed Federal Protective Officer Posts for 17th & 18th Floors of White Flint North Bldg + (ML20215L723)
- ML20215L723 + (ML20215L723)
- ML20215L724 + (ML20215L724)
- ML20215L726 + (ML20215L726)
- ML20215L728 + (ML20215L728)
- ML20215L731 + (ML20215L731)
- ML20215L732 + (ML20215L732)
- TXX-6437, Interim Deficiency Rept CP-86-37 Re Firing Board Assemblies & Amplifier Boards in Battery Chargers That Do Not Conform to Vendor Assembly Drawings.Initially Reported on 870514.Review Continuing.Next Rept Expected by 870626 + (ML20215L733)
- ML20215L735 + (ML20215L735)
- ML20215L737 + (ML20215L737)
- ML20215L739 + (ML20215L739)
- ML20215L740 + (ML20215L740)
- ML20215L741 + (ML20215L741)
- ML20215L744 + (ML20215L744)
- ST-HL-AE-2268, Responds to NRC Re Open Items Noted in Insp Repts 50-498/87-08 & 50-499/87-08.Operation Procedure 0PGP03-Z0-0003 Revised to Cause Reviewers to Ensure That Previous License Compliance Evaluation Performed + (ML20215L745)
- ST-HL-AE-2032, Provides Addl Info Re Insp of Pressurizer Safety Relief Valves,Per NRC Request.Safety Relief Valves Will Be Inspected After Each Lift Involving Loop Seal or Water Discharge,Under Procedure OPMP04-RC-0024 + (ML20215L747)
- ML20215L748 + (ML20215L748)