Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215L509 + (ML20215L509)
- ML20215L510 + (ML20215L510)
- BECO-87-090, Part 21 & Deficiency Rept Re Loose &/Or Missing Bolts in Hydraulic Control Unit (HCU) Support Frames of CRD Sys. Initially Reported on 870529.HCU Will Be Restored to Original Design & Bolts Inspected + (ML20215L514)
- PNO-V-87-034, on 870502,w/plant in Cold Shutdown for 16 Months,Licensee Began Planned 7-day Dual Train Decay Heat Sys Outage.Steam Generators Operable & Available for Dhr. Resident Inspectors Monitoring Outage + (ML20215L515)
- ML20215L516 + (ML20215L516)
- ML20215L517 + (ML20215L517)
- ML20215L520 + (ML20215L520)
- ML20215L521 + (ML20215L521)
- ML20215L522 + (ML20215L522)
- IR 05000457/1987002 + (ML20215L524)
- A06007, Responds to 860821 Request for Addl Info Re Util 860521 Request to Amend License DPR-65 to Allow Storage of Consolidated Spent Fuel in Spent Fuel Storage Pool + (ML20215L525)
- ML20215L526 + (ML20215L526)
- ML20215L530 + (ML20215L530)
- ML20215L531 + (ML20215L531)
- TXX-6440, Submits Revised Response to Violations Noted in Insp Rept 50-445/84-16.Corrective Actions:Stated Nonconformance Repts, Including M84-01836,issued to Document Specific Examples of Nonconformances Identified + (ML20215L532)
- ML20215L534 + (ML20215L534)
- ML20215L535 + (ML20215L535)
- ML20215L536 + (ML20215L536)
- ML20215L537 + (ML20215L537)
- ST-HL-AE-2103, Responds to NRC Request for Addl Info Re Insp Program Used to Determine That Raychem Splices Correctly Installed. Raychem safety-related Splices Will Be Visually Inspected to Ensure Correct Installation + (ML20215L539)
- ML20215L540 + (ML20215L540)
- ML20215L542 + (ML20215L542)
- ML20215L543 + (ML20215L543)
- IA-86-729, Denies Util 841213 Request for Exemption from Requirements of 10CFR50.73, LER Sys. Postponement of Reporting Suppl to LER Permitted Only When Similar Reportable Items Discovered During Review + (ML20215L545)
- ML20215L545 + (ML20215L545)
- ML20215L546 + (ML20215L546)
- 3F0587-11, Forwards Crystal River Unit 3 Control Room Habitability Supplemental Assessment Due to Sulfur Dioxide Release at Units 1 & 2, Summary Rept.Rept Updated from 861218 Submittal + (ML20215L547)
- ML20215L550 + (ML20215L550)
- ML20215L552 + (ML20215L552)
- ML20215L553 + (ML20215L553)
- ML20215L554 + (ML20215L554)
- ML20215L555 + (ML20215L555)
- ML20215L556 + (ML20215L556)
- PNO-V-87-046, on 870521,licensee Determined That Another Control Cable Improperly Installed in Tray for Instrumentation Cable.Licensee Currently Evaluating Need for Performing 100% Insp of Rerouted Cables in 1976-1986 + (ML20215L557)
- 3F0587-06, Monthly Operating Rept for Apr 1987 + (ML20215L558)
- ML20215L559 + (ML20215L559)
- PY-CEI-NRR-0649, Forwards LERs 87-013-01,87-026-00 & 87-027-00 + (ML20215L561)
- ML20215L565 + (ML20215L565)
- ML20215L567 + (ML20215L567)
- ML20215L568 + (ML20215L568)
- ML20215L569 + (ML20215L569)
- ML20215L570 + (ML20215L570)
- IR 05000416/1987010 + (ML20215L572)
- ML20215L573 + (ML20215L573)
- ML20215L574 + (ML20215L574)
- ML20215L575 + (ML20215L575)
- ML20215L578 + (ML20215L578)
- ML20215L579 + (ML20215L579)
- ML20215L581 + (ML20215L581)
- ML20215L582 + (ML20215L582)
- NRC-87-0051, Advises That Util Will Begin Accumulating Environ Info Similar to Philadelphia Electric Co 870304 Submittal,Per 870429 Agreement.Info Will Be Submitted by 870731 + (ML20215L583)