Text
.
i i
f6 RECEIVED NRC Southern California Edison Company SAN ONOFRE NUCLEAR GENERATING STATION iI A 9 58
" ~ * * ' *
- REGION V SAN CLEMENTE, CALIFORNIA 92672 H.E. MORGAN TE LE PHONE l
June 11, 1987
.urion u - oEa m ame +24 l
Mr. John B. Martin, Regional Administrator
'U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement, Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 I
Dear Mr. Martin:
Subject:
Submittal of Owner's Report of Inservice Inspection, Form NIS-1 l
San Onofre Nuclear Generating Station, Unit 3
Reference:
(a)
American Society of Mechanical Engineers (ASME) l Boiler and Pressure Vessel Code,Section XI, 1977 Edition with Addenda through Summer, 1979 Southern California Edison Company is submitting for your file a copy of the Inservice Inspection Report, including the Owner's Report of Repairs and Replacements for the San Onofre Nuclear t
Generating Station, Unit 3.
This report is submitted to meet the requirements of Paragraph IWA-6230 of Reference (a), and covers the inservice inspection of Class 1 and Class 2 pressure retaining components and their supports.
This report covers the period from January 12, 1986 through March 13, 1987, the date of the Unit's return to service following the second refueling outage.
i Sincerely, SS H. E. Morgan JDBoardman/jdb Enclosures cc:
R.
C. Robbins, ANIIS C. R. Erickson, State of California i
1' 8706260085 870611 PDR ADOCK 05000362 PDR G
ff-O /
k:
y 3Eg j
Southem Califomia Edison Compa g g 9 $8 l
SAN ONOFRE NUCLEAR GENERATING STAT 8Off i
gEG10H V P. O. BOX 128
' SAN CLEMENTE. CALIFORNIA 92672 N.E MORGAN' TCLEPHONE June 11, 1987 i
<>i>***.>'
ev.1.ou = =...
i I
'Mr. Clifford R. Erick' son, Principal Safety Engineer Division.of Occupational Safety and Health' j
Pressure Vessel Section
{;
Post Office Box 603 San Francisco, California 94101 i
Dear Mr.:
Erickson:
1
Subject:
Submittal of Owner's Report of Inservice Inspection, l
l Form'NIS San Onofre Nuclear Generating Station, Unit 3
~l
Reference:
(a)
American Schiety of Mechanical Engineers (ASME)
Boiler and Pressure Vessel Code,Section XI, 1977 Edition with Addenda through Summer,1979 '
Southern' California Edison Company is submitting for your. file a copy.of:the Inservice Inspection Report,' including the Owner's Report of Repairs and Replacements for the San Onofre Nuclear Generating Station,-Unit 3.
This report is submitted to meet the requirements of Paragraph IWA-6230 of Reference (a),.and covers the inservice' inspection of Class 1 and Class 2 pressure 2
retaining components and their supports.
This report covers the period from. January-12, 1986 through March 13,.1987, Lthe date of the Unit's return to service following the second refueling' outage, i
Sincerely, I
-4 E. Wig H. E. Morgan i
JDBoardman/jdb Enclosures cc:
R.
C.' Robbins, ANIIS J. B. Martin, U. S. Nuclear Regulatory Commission l
}
4 l
~
- < =
1 L
m I
fC8 RECEIVED NRC<>
Southern California Edison Company SAN ONOFRE NUCLEAR GENERATING STATION
-REGION V H
SAN CLEMENTE. CALIFORNIA 92672
.1 H.E. MORGAN TELtPHONE -
.r01. " " ' " ^ * * "
June 11, 1987
- Mr. ' R. C. Robbins' ' Unit = Manager 1Special^ Inspection Services.Section Lumbermen's' Mutual Casualty Company
'Kemper. Group
- 11770 Warner Avenue, suite 222 E
Fountain Valley, California '92708
Dear Mr.~ Robbins:
Subject:
. Submittal;of Owner's Report of~ Inservice Inspection,.
Form NIS San Onofre Nucle'ar Generating' Station, Unit 3
Reference:
(a)
American Society of-MechanicallEngineers (ASME)
' Boiler and Pressure Vessel' Code,-Section-XI, 1977! Edition with Addenda through Summer, 1979
~
Southern. California Edison Company is submitting.for your file a copy of ;the Inservice Inspection Report, ~ including the Owner's
-Report'of-Repairs and Replacements for the San Onofre Nuclear 1 Generating Station, Unit 3.
This report is.: submitted to meet the.
requirements of. Paragraph IWA-6230.of Reference ~(a), and covers the inservice' inspection of class l'and Class 2 pressure-retaining components and their supports.-
This. report: covers the period from January 12, 1986 through March 13, 1987, the date of the-Unit's return to service following the
- second refueling outage.
Sincerely,
]
1 SSWM o-H. E. Morgan JDBoardman/jdb
]
Enclosures J
cc:
C. R. Erickson, State of California J. B. Martin, U. S. Nuclear Regulatory Commission w
\\
..