Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215K455 + (ML20215K455)
- ML20215K458 + (ML20215K458)
- ML20215K459 + (ML20215K459)
- ML20215K460 + (ML20215K460)
- ML20215K463 + (ML20215K463)
- ML20215K464 + (ML20215K464)
- ML20215K465 + (ML20215K465)
- ML20215K467 + (ML20215K467)
- IR 05000443/1987001 + (ML20215K470)
- ML20215K471 + (ML20215K471)
- ML20215K473 + (ML20215K473)
- IR 05000317/1987008 + (ML20215K474)
- L-86-415, Notifies That Util Has Not Received Valve Stem Thrust Calculation from All Affected Valve Vendors to Complete Actions on IE Bulletin 85-003.Action Item B Expected to Be Completed by 870130 + (ML20215K475)
- ML20215K476 + (ML20215K476)
- ML20215K477 + (ML20215K477)
- ML20215K478 + (ML20215K478)
- ML20215K479 + (ML20215K479)
- ML20215K482 + (ML20215K482)
- ML20215K486 + (ML20215K486)
- ML20215K487 + (ML20215K487)
- ML20215K488 + (ML20215K488)
- ML20215K489 + (ML20215K489)
- PNO-I-86-084, on 861020,reactor Tripped.Caused by Failure of Safety Injection Logic Relay Which Demands Reactor Trip Upon Safety Injection Actuation.Difficulties Encountered W/Two of Three Auxiliary Feedwater Pumps + (ML20215K490)
- IR 05000395/1986016 + (ML20215K492)
- ML20215K493 + (ML20215K493)
- ML20215K495 + (ML20215K495)
- ML20215K496 + (ML20215K496)
- ML20215K497 + (ML20215K497)
- 05000424/LER-1987-012, :on 870405,reactor Trip Occurred Due to Water Level in Steam Generator 4 Reaching lo-lo Level Trip Setpoint.Caused by Overfeeding of Steam Generator 2 While in Manual Control.Air Booster Adjustments Made + (ML20215K498)
- ML20215K499 + (ML20215K499)
- ML20215K501 + (ML20215K501)
- ML20215K502 + (ML20215K502)
- ML20215K504 + (ML20215K504)
- ST-HL-AE-2159, Submits Info Re Postulated LOCA in Modes 3 & 4,per 870505 Request.Basis for Assumption That 10 Minutes Available for Operator Action Following 8 Inch or Smaller Break in Modes 3 & 4 Provided to NRC in Westinghouse Ltr NS-NRC-86-3144 + (ML20215K505)
- U-600868, Requests Scheduling of Next Graded Emergency Exercise for Facility on 880427 & Written Notification of NRC Acceptance. Exercise Previously Conducted on 870113 + (ML20215K508)
- ML20215K509 + (ML20215K509)
- ML20215K510 + (ML20215K510)
- ML20215K511 + (ML20215K511)
- ML20215K514 + (ML20215K514)
- ML20215K515 + (ML20215K515)
- ML20215K516 + (ML20215K516)
- 05000304/LER-1986-019-05, :on 860920,reactor & Generator Tripped.Caused by Personnel Error During Replacement of High Pressure Turbine Impulse Pressure Transmitter.Disciplinary Action Taken & Procedure Modified + (ML20215K517)
- ML20215K519 + (ML20215K519)
- ML20215K520 + (ML20215K520)
- ML20215K521 + (ML20215K521)
- ML20215K523 + (ML20215K523)
- ML20215K525 + (ML20215K525)
- ML20215K527 + (ML20215K527)
- ML20215K529 + (ML20215K529)
- ML20215K530 + (ML20215K530)
- ML20215K531 + (ML20215K531)