Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215B730 + (ML20215B730)
- ML20215B734 + (ML20215B734)
- ML20215B736 + (ML20215B736)
- ST-HL-AE-2251, Forwards Annotated Rev to FSAR Section 12.3.4.1.2, Design Criteria Re Area Radiation Monitors.Change Provides Clarification Re Two Reactor Containment Bldg Monitors.Rev Will Be Included in Future FSAR Amend + (ML20215B738)
- ML20215B740 + (ML20215B740)
- ML20215B741 + (ML20215B741)
- ML20215B742 + (ML20215B742)
- PY-CEI-NRR-0663, Forwards Rept of Changes to Initial Test Program,Per License Condition 2.C(4) & 10CFR50.59(b) + (ML20215B743)
- ML20215B745 + (ML20215B745)
- ML20215B746 + (ML20215B746)
- ML20215B747 + (ML20215B747)
- ML20215B749 + (ML20215B749)
- ST-HL-AE-2250, Forwards Annotated Revs to Fsar,Including Tables 3.9-1.2, Active Valves (BOP Sys) & 6.2.4-1, Containment Isolation Sys Failure Modes & Effects Analysis Re Deficiency Reported on 831118 Involving Target Rock Solenoid Valves + (ML20215B750)
- 3F0687-07, Responds to Violations Noted in Insp Rept 50-302/87-10. Corrective Actions:Operating Daily Surveillance Log SP-300 Revised to Include Channel Check for Listed Fluxes,Reactor Coolant Outlet Temp & Bwst Level & RB Pressure + (ML20215B751)
- ML20215B753 + (ML20215B753)
- ML20215B755 + (ML20215B755)
- ML20215B757 + (ML20215B757)
- ML20215B758 + (ML20215B758)
- ML20215B759 + (ML20215B759)
- ML20215B762 + (ML20215B762)
- ML20215B763 + (ML20215B763)
- U-600950, Informs That Util Has Agreed to Revise Procedure CPS 3319.01, Standby Gas Treatment, Per Sser 8,Section 6.2.5 Re Discussion of Reg Guide 1.7 Compliance + (ML20215B766)
- ML20215B768 + (ML20215B768)
- ML20215B769 + (ML20215B769)
- ML20215B770 + (ML20215B770)
- ML20215B772 + (ML20215B772)
- ML20215B773 + (ML20215B773)
- ML20215B778 + (ML20215B778)
- ML20215B780 + (ML20215B780)
- ML20215B784 + (ML20215B784)
- ML20215B786 + (ML20215B786)
- 05000366/LER-1986-034-01, :on 861105,emergency Diesel Generator 2C Started & Tied to Bus.Caused by Personnel Not Adequately Reviewing Logic Prints Before Removing Transformer Compartments from Bus 2G.Sys Restored + (ML20215B787)
- ML20215B789 + (ML20215B789)
- ML20215B790 + (ML20215B790)
- IR 05000327/1987014 + (ML20215B795)
- ML20215B796 + (ML20215B796)
- ML20215B798 + (ML20215B798)
- ML20215B799 + (ML20215B799)
- ML20215B800 + (ML20215B800)
- ML20215B801 + (ML20215B801)
- ML20215B802 + (ML20215B802)
- ML20215B804 + (ML20215B804)
- ML20215B805 + (ML20215B805)
- ML20215B806 + (ML20215B806)
- ML20215B807 + (ML20215B807)
- ML20215B808 + (ML20215B808)
- 05000344/LER-1987-011, :on 870501,excessive Leakage Detected from Penetration E-107 During Check of Penetrations E-112 & E-115.Caused by Leakage Past Electrical Penetration Conductor Seals & Seal Displacement Due to Age + (ML20215B809)
- A06097, Submits Addl Info Re SEP Topic III-3.C, Inservice Insp of Water Control Structures, in Response to 860918 Request. Qualified Engineer Will Be Assigned Responsibility for All Phases of Insps + (ML20215B810)
- NRC-87-3229, Informs of Completion of Preliminary Design & Engineering of Advanced Pwr.Westinghouse Currently Working on Final Design & Engineering Efforts & Encouraged That Issuance of Preliminary Design Approval Will Be Achieved in Early 1988 + (ML20215B813)
- ML20215B814 + (ML20215B814)
- IA-86-454, Submits Update of 860408 Schedule for Remaining Work Needed on Sser 13 for Comanche Peak Program Plan.Related Info Encl + (ML20215B816)