Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000362/LER-1985-036, :on 851223,determined That Shutdown Cooling Sys HX Isolation Valves 3HV-8150 & 3HV-8151 Not Fully Closed Per Tech Specs.Caused by Premature Actuation of Valve Motor Operator Position Indication Limit Switches + (ML20215B317)
- ML20215B318 + (ML20215B318)
- ST-HL-AE-1743, Revised Final Deficiency Rept Re Interaction of safety-related & nonsafety-related Instruments Connected to Same Process Taps.Initially Reported on 851009.Item Not Reportable Per 10CFR50.55(e).Related Correspondence + (ML20215B320)
- ML20215B321 + (ML20215B321)
- ML20215B324 + (ML20215B324)
- ML20215B325 + (ML20215B325)
- ML20215B326 + (ML20215B326)
- ML20215B330 + (ML20215B330)
- ML20215B331 + (ML20215B331)
- ML20215B333 + (ML20215B333)
- ML20215B334 + (ML20215B334)
- ML20215B337 + (ML20215B337)
- ML20215B339 + (ML20215B339)
- ML20215B342 + (ML20215B342)
- ML20215B343 + (ML20215B343)
- ML20215B344 + (ML20215B344)
- ML20215B346 + (ML20215B346)
- ML20215B347 + (ML20215B347)
- B12501, Proposes Rev to Bases Section 2.4, Max Safety Settings - Protective Instrumentation. Rev Increases PORV Setpoint Above High Pressure Trip Setpoint + (ML20215B350)
- ML20215B351 + (ML20215B351)
- 05000325/LER-1987-015-01, :on 870515,primary Containment Group I Isolation & Reactor Protection Sys Trip Signal Occurred. Caused by Deficient Test Procedure.Isolation & Trip Signal Reset & Procedure Revised + (ML20215B354)
- ML20215B358 + (ML20215B358)
- ML20215B366 + (ML20215B366)
- ML20215B367 + (ML20215B367)
- ML20215B368 + (ML20215B368)
- IR 05000166/1987002 + (ML20215B369)
- ML20215B371 + (ML20215B371)
- ML20215B376 + (ML20215B376)
- ML20215B384 + (ML20215B384)
- TXX-6494, Interim Deficiency Rept CP-86-76 Re Configuration & Dimensions of Gould Battery Racks Deviating from Drawing Requirements.Initially Reported on 861021.Evaluation in Final Stage of Review.Next Rept Will Be Submitted by 870810 + (ML20215B389)
- ML20215B390 + (ML20215B390)
- ML20215B400 + (ML20215B400)
- ML20215B401 + (ML20215B401)
- ML20215B402 + (ML20215B402)
- IR 05000348/1987010 + (ML20215B404)
- ML20215B404 + (ML20215B404)
- ML20215B406 + (ML20215B406)
- ML20215B409 + (ML20215B409)
- ML20215B413 + (ML20215B413)
- ML20215B415 + (ML20215B415)
- ML20215B419 + (ML20215B419)
- ML20215B422 + (ML20215B422)
- IR 05000458/1987003 + (ML20215B425)
- ML20215B431 + (ML20215B431)
- ML20215B435 + (ML20215B435)
- ML20215B439 + (ML20215B439)
- ML20215B444 + (ML20215B444)
- ML20215B446 + (ML20215B446)
- 05000328/LER-1986-038, :on 860826,unit Board 2C & Associated Shutdown Boards Inadvertently Deenergized.On 860908,normal Feedwater Breaker Tripped During Transfer of Start Bus 2B from Alternate to Normal + (ML20215B447)
- 05000327/LER-1986-040, :on 860826,discovered That Use of Water Seal for Essential Raw Cooling Water Isolation Valves Invalid. Caused by Procedural Inadequacy Due to Failure to Properly Evaluate Bases of Leakage Test + (ML20215B449)
- 05000328/LER-1986-037, :on 860826,Surveillance Instructions SI-244, SI-403,SI-409 & SI-422.1 Not Performed within Allowed Time Frames.Caused by Personnel Error.Personnel Counseled & Scintillation Counter Repaired + (ML20215B455)