Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214N453 + (ML20214N453)
- ML20214N454 + (ML20214N454)
- ML20214N456 + (ML20214N456)
- ML20214N460 + (ML20214N460)
- ML20214N462 + (ML20214N462)
- ML20214N463 + (ML20214N463)
- ML20214N464 + (ML20214N464)
- U-600946, Forwards Status of out-of-svc Annunciators.Total of 21 Annunciators Require Panel Outage as of 870526.Sixteen of 21 Annunciators Scheduled to Be Worked During Outage.Remaining 5 Annunciators Have Part Constraints + (ML20214N469)
- ML20214N470 + (ML20214N470)
- ML20214N473 + (ML20214N473)
- ML20214N474 + (ML20214N474)
- ML20214N476 + (ML20214N476)
- ML20214N482 + (ML20214N482)
- ML20214N483 + (ML20214N483)
- ML20214N487 + (ML20214N487)
- ML20214N488 + (ML20214N488)
- ML20214N490 + (ML20214N490)
- ML20214N491 + (ML20214N491)
- ML20214N494 + (ML20214N494)
- ML20214N497 + (ML20214N497)
- ST-HL-AE-1828, Forwards marked-up Pages of FSAR Section 9.4 Re Turbine Generator Bldg Hvac.Changes Will Be Incorporated in Future FSAR Amend + (ML20214N498)
- ML20214N499 + (ML20214N499)
- ML20214N503 + (ML20214N503)
- ML20214N504 + (ML20214N504)
- ML20214N508 + (ML20214N508)
- ML20214N511 + (ML20214N511)
- ML20214N513 + (ML20214N513)
- ML20214N515 + (ML20214N515)
- 05000458/LER-1986-063, :on 861028,unanticipated Isolation Signal Received for RHR During Surveillance Test,Due to Grounded Lead.Caused by Test Procedure Requiring Wiring Termination Activities in Confined Space.Procedure Revised + (ML20214N520)
- ML20214N522 + (ML20214N522)
- ST-HL-AE-2193, Submits Addl Info Re Facility Project Request for Approval on Increased Cumulative Usage Factor.Util Considers Confirmatory Item Closed + (ML20214N527)
- ML20214N528 + (ML20214N528)
- ML20214N529 + (ML20214N529)
- ML20214N530 + (ML20214N530)
- ML20214N534 + (ML20214N534)
- ML20214N535 + (ML20214N535)
- TXX-5002, Interim Part 21 & Deficiency Rept CP-86-46 Re Design Change to Gould Battery Racks Transverse Bracing.Technical Disposition of Nonconformance & Resolution of Design Changes to Be Complete by 860930.Next Rept by 861021 + (ML20214N537)
- IR 05000498/1986029 + (ML20214N538)
- ML20214N540 + (ML20214N540)
- 05000298/LER-1986-016, :on 860813,reactor Scram Occurred.Caused by Lack of Proper Preplanning for Relay Replacement & Specific Procedural Guidance.Need for Preplanning of Maint Activities Reemphasized + (ML20214N541)
- ML20214N543 + (ML20214N543)
- ML20214N546 + (ML20214N546)
- TXX-4997, Interim Deficiency Rept CP-86-48 Re Adequacy of Nonconformance Dispositions.Evaluation of Issue Involving Rev of Disposition of Nonconformance Rept Scheduled for Completion by 861003.Next Rept Anticipated by 861024 + (ML20214N547)
- 05000281/LER-1986-015-02, :on 861031,pressurizer Safety Valves Had Lift Setpoints Outside Allowable Limits During Refueling Surveillance Testing.Safety Valve Setpoints Reset.Vendor Failure Analysis Underway + (ML20214N548)
- IR 05000344/1986028 + (ML20214N556)
- 05000413/LER-1986-042, :on 860808,reactor Tripped During Breaker Testing.Caused by Personnel Error.Supervisors & Technicians Will Be Cautioned Re Importance of Attention to Detail Concerning Testing + (ML20214N558)
- ML20214N561 + (ML20214N561)
- ML20214N566 + (ML20214N566)
- ML20214N567 + (ML20214N567)
- ML20214N568 + (ML20214N568)
- 0CAN088615, Responds to Violations Noted in Insp Repts 50-313/86-17 & 50-368/86-18.Corrective Actions:Vendor Technical Manuals for Emergency Feedwater Pump Terry Turbines + (ML20214N576)