Forwards Summary of CRGR Activities for Nov 1981 - Aug 1986, in Response to COMSECY-86-5.No Changes Recommended to CRGR Functions & Scope
ML20214N456
Person / Time
Issue date: 09/08/1986
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Asselstine, Roberts, Zech
NRC COMMISSION (OCM)
References
NUDOCS 8609160311
Download: ML20214N456 (73)


Text

-- - . -- _. . . . . . . . - - .-

  1. UNITED STATES

[ o,j NUCLEAR REGULATORY COMMISSION 5 E WASHINGTON, D. C. 20655 i

  • % ,...* SEP 8 1986 MEMORANDUM FOR: Chairman Zech Comissioner Roberts J Commissioner Asselstine Comissioner Bernthal Comissioner Carr FROM: Victor Stello, Jr.

Executive Director for Operations 4

SUBJECT:

RESPONSE TO COMSECY-86-5 A memorandum from the Secretary dated June 20, 1986, with the subject: Staff Requirements - COMSECY-86-5, " Charter, Comittee to Review Generic Requirements (CRGR)," informed the EDO that the Comission approved a new version of the CRGR Charter. The ED0 was requested to provide a report on CRGR activities and recommendations as to whether its functions and scope remain appropriate and continue to reflect the present needs of the Comission.

i Enclosed is a report on CRGR activities since its creation in October 1981.

Concerning CRGR's functions and scope, I strongly support the need for the CRGR and believe that its functions and scope remain appropriate and continue to reflect the present needs of the Comission. At this time, I recomend that no changes be made to CRGR's functions and scope as delineated in the CRGR Charter recently approved by the Comission, i Several Comissioners raised the question of whether or not CRGR activities (specifically briefings for CRGR concerning the status of work that is not i

before the CRGR for consideration as a generic requirement) are consistent with the CRGR Charter. Briefings for the CRGR are provided for in the CRGR Charter.

All previous versions of the CRGR Charter, and the current September 1986 version recently approved by the Comission, contain a provision (III.E) for

! early briefing of the CRGR by sponsoring offices before the staff has developed /

submitted proposals for CRGR consideration. Briefings have been given to the CRGR for one or more the following reasons:

f 1. The EDO or an Office Director has requested that the CRGR be briefed to t

obtain Comittee views concerning a matter.

2. An Office Director sponsoring a series of proposed regulatory actions that

' are to be submitted for CRGR review at various times in the future, seeks i to brief the CRGR to provide a big picture understanding of the proposed actions.

! 3. An Office Director sponsoring a voluminous proposal, which calls for [

j extensive regulatory actio'1, seeks to brief the CRGR to facilitate under- j standing prior to CRGR review of the proposal. gg R Rk h hk g R PDR J"

/

,y

  • y
4. An Office Director or Committee member seeks to inform the CRGR concerning the latest scientific and technical developments in a particular topic area.
5. Committee members have asked for a CRGR briefing to surface a matter viewed as requiring CRGR attention.

Original signed by yictor Stell.Q{

Victor Stello, Jr.

Executive Director for Operations

Enclosure:

Summary of CRGR Activities cc: SECY 0GC Distribution:

VStello JHSniezek JRoe HRDenton JGDavis JMTaylor DFRoss ROGR Staff PDR EDO rf Central File f

0FC :ROGR/S :ROGR g.

JZe 7 [.._::DEK.R06f0.. 4 _ M .: DQ t
VS 'ello  :  :  :

1 NAME :W$

JFS}iiere

..___:__ ..___ ...:__.j . _____:_--_________.....___' .___:-___________:----___---__:-__________

l DATE :9/4/86 :9/ 6 /E6 :9/(/86 :9/( /86  :  :  :

0FFICIAL RECORD COPY

SUMMARY

OF CRGR ACTIVITIES -

NOVEMBER 1981 THROUGH AUGUST 1986 e

) Meating No.

i Meeting Date (Announcement CRGR CRGR Recommendation i Date) Agenda Status to EDO 91 Review, Proposed Final Pending No CR6R recommendation necessary

//23/86 Revision of ECCS Rule at this time. Review of this Contained in Appendix K and item will continue at a future Section 50.46 of 10 CFR 50 meeting.

-Sponsoring Office - RES

-Category 2 Item

-Issue i 141 92 Review, Proposed IE Complete CRGR recommended issuance of

( 7/11/86 Bulletin, Unreliable the Bulletin after modification t

Behavior of Static "0" to reflect CRGR concerns.

Ring Differential Pressure Switches

-Sponsoring Office - IE

! -Category 1 Item j -Issue #140 The CRGR was notified on June 30, 1986, by IE, that IE Compliance Bulletin 86-01, Minimum Flow Logic Problems that Could j Disable RHR Pumps was issued. This issuance was in accordance with Section III.C of the CRGR Charter, Revision 1.

I i .

~

1

SUMMARY

OF CRGR ACTIVITIES -

NOVEMBER 1981 THROUGH AUGUST 1986 l

l Meeting No. '

Meeting Date (Announcement CRGR CRGR Recommendation i Date) Agenda Status to EDO t

90 Briefing, Proposed Generic Complete CRGR suggested that the staff 5/28/86 Letters 86-05 and 86-06 carefully review the language in l Reactor Coolant Pump Trip Generic Letters 86-05 and 86-06 to BWR Piping, Draft NUREG-0313 assure that the staff intent for i

Revision 2 no new requirements was clearly conveyed.

-Sponsoring Office - NRR

-Category 2 Item j -Issue #39 4

+

Review, Proposed Final Pending CRGR recommended that the RG f Version of Regulatory Guide be modified to address the 4

(OP-713-4) Criteria for a Committee's comments and re-Establishing a Tritium Bioassay submitted to CRGR for further

! Program review.

l -Sponsoring Office - RES j -Category 2 Item

-Issue #139

) Review, hinai Version of Pending CRGRrecommenddthattheruie 4 Rev. to Property Insurance be modified to reflect CRGR Rule recommendations and resubmitted for CRGR further review.

! -Sponsoring Office - SP

-Category 2 Item

-Issue #33 i,

f s

l .

8

. ~ _ _.

SUMARY OF CRGR ACTIVITIES -

l NOVEMBER 1981 THROUGH AUGUST 1986 i

! =

Meeting No.

! Meeting Date l (Announcement CRGR CRGR Recommendation Date) Agenda Status to EDO I

I i'

89 Review, Staff Long-Range Complete CRGR recomended that the 4/16/86 Approach for Dealing with proposed package be modified Stress Corrosion Cracking in and reviewed by the CRGR BWR Piping, Draft NUREG-0313 Chairman prior to issuance Revision 2 for comment.

l

-Sponsoring Office - NRR

-Category 2 Item j -Issue #56 (40) i l 88 Briefing, Current Status of Complete No CRGR recomendation necessary.

{ 4/10/86 Source Tem Work 1

1 -Sponsoring Office - RES  :

1

-Category 2 Item

-Issue #137 Briefing, Implementation Pending No CRGR recomunendation necessary Plan for the Severe Accident at this time. CRGR review of

)

Policy Statement and Reg. this item should be scheduled for Use of New Source Tem Info. later this year, j -Sponsoring Office - NRR

! -Category 2 Item

-Issue #11 il ________________________________________________________________________________

j Review, Proposed Resolution Pending CRGR recomended that the staff -

1 of USI A-17, Systems Inter. revise the oackage to eliminate j actions in Nuclear Power Plants ambiguities and focus on concerns

that staff believes need additional work. CRGR should then rereview .

} -Sponsoring Office - NRR the revised package. '

l -Category 2 Item

  • j -Issue #138 .

r SUMARY OF CRGR ACTIVITIES -

} NOVEMBER 1981 THROUGH AUGUST 1986

! Meeting No.

! Meeting Date (Announcement CRGR CRGR Recomunendation Date) Agenda Status to EDO l

i l

87 Review, Final Rulemaking Complete CRGR recomunended that the

{ 3/19/86 Package to Revise the proposal, as modified, be

-l Regulations for Operator approved by the EDO.

I Licensing, 10 CFR 55, l Conforming Amendments and 4 Three Associated RGs

-Sponsoring Office - NRR

-Category 2 Item

. -Issue #125 I 86 Review, Final Rulemaking Pending No CRGR recommendation at this i 2/26/86 Package to Revise the time. This review was continued i Regulations for Operator at Meeting No. 87 on March 19.

l Licensing, 10 CFR Part 55, Conforming Amendments and Three Associated RGs

! -Sponsoring Office - NRR

-Category 2 Item

-Issue #125 i

! 85 Review, Proposed Broad Complete The CRGR recomunended that the 2/5/86 Scope Rule to Modify General proposed broad-scope rule package Design Criterion 4 of 10 be sent forward for consideration

! CFR Pcrt 50 by the Commission, subject to the

modifications recommended by CRGR l -Sponsoring Office - RES

! -Category 2 Item t -Issue #135 I .

l

SUMMARY

OF CRGR ACTIVITIES -

NOVEMBER 1981 THROUGH AUGUST 1986 i

Meeting No.

Meeting Date (Announcement CRGR CRGR Recommendation Date) Agenda Status to EDO 84 Briefing Impacts of Nuclear Complete No CRGR recommendations necessary.

, 1/22/86 Waste Disposal Legislation 1

-Sponsoring Office - NMSS t -Category 2 Item

-Issue #133 Review, Proposed IE Infor- Complete CRGR recommended that IE revise mation Notice, NRC On-Scene the Information Notice consistent Response during an Emergency with the comments and concerns of I the CRGR and coordinate those i changes with the CRGR Chairman l

-Sponsoring Office - IE prior to publication.

_ Category 2 Item t -Issue #134 Review, Proposed Broad Pending No CRGR recommendations at this Scope Rule to Modify General time. Continuation of this Design Criterion 4 of 10 review is scheduled for CFR Part 50 February 5,1986.

-Sponsoring Office - RES

-Category 2 Item

_ Issue #135 Review of Revision to None required CRGR Charter I

-Sponsoring Office - DEDROGR

-Category 2 Item

-Issue #1 e

D

,- w - =

SUMMARY

OF CRGR ACTIVITIES .

NOVEMBER 1981 THROUGH AUGUST 1986

'l Meeting No. '

Meeting Date (Announcement CRGR CRGR Recassiendation j Date) Agenda Status to EDO i

4 83 Review, Proposed Pulemaking Complete CRGR recommended that the pro _

i 11/27/85 (10 CFR 30, 40 & 70) Emergency posed rule be approved for Preparedness for Fuel Cycle consideration by the Commiission.

and Other Radioactive Material l Licenses i

, -Sponsoring Office - RES l -Category 2 Item j -Issue #130 j

i Review, Proposed Rev. 3 to Complete CRGR recommended that the RG 1.63, Electric Penetration proposed RG be issued for Assemblies in Containment public comunent after modifi-i Structures for Nuclear Power cation to reflect comments by Plants CRGR.

, -Sponsoring Office - RES

] -Category 2 Item 4

-Issue #131 j Review, Proposed Closeout Complete CRGR recommended that the Actions for Resolving Generic staff move forward with Issue B-19, Thernal Hydraulic issuance of generic letters i Stability for BWRs addressing the closeout of i

j B-19 and B-59.

_ Sponsoring Office - NRR j -Category 2 Item

-Issue #132 i

1 ,

i t

e i K_

SUPMARY OF CRGR ACTIVITIES -

] MOVEMBER 1981 THROUGH AUGUST 1986 i

i *

! Meeting No.

Meeting Date l

! (Announcement CRGR CRGR Recomunendation l Date) Agenda Status to EDO l 82 Review, Proposed Final Complete CRGR recomunended that the j 10/23/85 Version of the Insider proposed final rule be j Rules issued after modification

to reflect CRGR comunents.

i

-Sponsoring Office _ IMSS

-Category 2 Item

! -Issue #35 i _____.________..__.... _________________...._._-_-_____..______ _-_______...____

Review, Proposed IE Complete CRGR reconenended issuance of Bulletin, Motor-Operated the proposed bulletin after l Valve (MOV) Cosenon Mode modifications are made to i Failures During Plant reflect CRGR recommendations.

Transients Due to Improper These modifications should be i Switch Settings coordinated with the ROGR

staff prior to issuance of

_ Sponsoring Office - IE the bulletin.

-Category 2 Item

-Issue #129

] Review, Proposed IE Complete CRGR recomunended that the j Comunission Paper on Commission Paper be approved Alternatives for Offsite subject to modifications.

Emergency Medical Services These modifications should be coordinated with the ROGR staff.

-Sponsoring Office - IE l -Category 2 Item q -Issue #124 1

I i

l I

I

]___._.__..__.____.___._____

i SU M ARY OF CRGR ACTIVITIES -

NOVEMBER 1981 THROUGH AUGUST 1986 f

Meeting No. '

Meeting Date

]'

(Announcement CRGR CRGR Recommendation Date) Agenda Status to EDO I

! 81 Briefing, Existing and Complete CRGR offered consnents concerning

{ 9/25/85 Forthcoming Guidance decommissioning guidance and j Associated with Decom- requested that all decomunissioning f

missioning guidance be forwarded to the CRGR Chairman to determine if CRGR

, -Sponsoring Office - RES review is necessary.

l -Category 2 Item j -Issue #126 j

j Review, Proposed Rev. 2 Pending CRGR recomunended prompt issuance i to Regulatory Guide 1.99, cf the proposed Rev. 2 to RG 1.99 i Radiation Damage to Reactor for public comument.

j Vessel Materials i

^

-Sponsoring Office . RES

-Category 2 Item

-Issue #121 Review, Proposed RG, " Guide Pending CRGR recomunended issuance of the for Licensee Preparation and proposed RG 1.XXX for public NRC Staff Review of Plant- comment after satisfactory Specific Analysis Required by resolution of CRGR concerns. The the Pressurized Thermal Shock CRGR Chairman asked that he be

! Rule, 10 CFR 50.61 provided with a copy of the revised RG before it is issued.

j -Sponsoring Office - NRR

-Category 2 Item

-Issue #127 i

e 9

A

SUMMARY

OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No.

Meeting Date (Announcement CRGR CRGR Recommendation

Date) Agenda Status to EDO i

l 81 Review, Proposed IE Complete CRGR recommended issuance of the l Bulletin " Steam Binding of Bulletin after modification to (Continued) i Auxiliary Feedwater Pumps reflect CRGR comments and recom-

! mendations.

! -Sponsoring Office - IE i -Category 2 Item

-Issue #128

) 80 Briefing, Proposed Commission Pending No CRGR recommendation necessary

9/9/85 Paper Concerning Offsite at this time. ,CRGR will review i Medical Services this item at a future meeting.

-Sponsoring Office - IE

-Category 2 Item

-Issue #124 i ________________________________________________________________________________

i Review, Proposed Resolution Complete CRGR recommended approval after i of USI A-43, " Containment modification to reflect specific j Emergency Sump Performance CRGR concerns and recommendations.

l l -Sponsoring Office - NRR Also discussed at Mtg 26, 28 & 66 i -Category 2 Item i -Issue #47 l Briefing, Resolution of Public Pending No CRGR recommendation necessary

! Comments on Proposed Final at this time. The CRGR will Rulemaking on 10 CFR 55, review this item at a future

" Operators' Licenses" and meeting.

Three Related RGs

-Sponsoring Office - NRR Als discussed at Mtgs 86 & 87 i

-Category 2 Item

-Issue #125 ,

~

I I

i

SupO4ARY OF CRGR ACTIVITIES -

NOVEMBER 1981 THROUGH AUGUST 1986 i

Meeting No.

Meeting Date (Announcement CRGR CRGR Recomendation Date) Agenda Status to EDO 79 Review, Proposed Revision 2 Pending Additional work needed by both 7/24/85 of RG 1.99, " Radiation Damage RES and NRR to address new to Reactor Vessel" information. CRGR recomended to the EDO that this be given priority effort. Subsequent to

-Sponsoring Office - RES the meeting, RES requested that

-Category 2 Item this guide be dropped from

-Issue #121 further CRGR consideration pending coordinated review by NRR and RES.

Briefing, Request to OMB Complete CRGR strongly encourages staff for Approval to Continue to to assure that only necessary Impose the Reporting & and reporting and recordkeeping Recordkeeping Requirements requirements are imposed by of 10 CFR 50 NRC. .

-Sponsoring Office - NRR

-Category 2 Item

-Item #122 Briefing, Pressure Isolation Complete CRGR suggested staff consider-Valve Test Requirements ation be given to the develop-ment of better focused PIV

-Sponsoring Office - NRR guidance for the IST reviewers

-Category 2 Item and to assure plant-specific PIV

. Item #123 requirements for operating j reactors were carried out con-sistent with NRC backfit procedures l (MC-0514).

I

,i .

?

  • 1

SUMMARY

OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 j Meeting No.

Meeting Date (Announcement CRGR CRGR Recommendation Date) Agenda Status to EDO l 79 (Continued) Review, Proposal for Complete CRGR recommended that this

! Improving Fire Protection issue be forwarded for con-sideration by the Commission

-Sponsoring Office - NRR after resolution of the con-

-Category 2 Item cerns raised by the CRGR.

-Issue #117 78 Review, Proposed Requirements Pending CRGR recmanended issuance subject 7/8/85 Resulting from Resolution to review by ELD.

of USI A-46, " Seismic Qualification of Equipment in Operating Plants" l

-Sponsoring Office - NRR l -Category 2 Item

-Issue #103 Briefing, Recommendations Pending Discussion at this briefing on Fire Protection Policy was inconclusive. CRGR i and Program Actions will review this issue at

Meeting #79 (7/24/85).

I -Sponsoring Office - NRR l -Category 2 Item t -Issue #117 l ____________________________________________________________________________....

l Briefing, Proposed New SRP Complete CRGR offered several recom-Sections to Address Expansion mendations relative to the SRP of Spent Fuel Storage section, but concluded that its issuance (for public comment),

as proposed by NRR, is appropriate.
-Sponsoring Office - NRR I -Category 2 Item

-Issue #118 . ,

I

SUMMARY

OF CRGR ACTIVITIES -

i NOVEMBER 1981 THROUGH AUGUST 1986 i

Meeting No.

Meeting Date (Announcement CRGR CRGR Recommendation i Date) Agenda Status to EDO 78 (Continued) Briefing, NRC Activities Complete The CRGR noted that there in the Development of NDE appears to be an extensive Qualification and Performance menu of meaningful technical development work ongoing.

Demonstration Criteria Resources should be combined and focused on one path for early and adequate improvement

-Sponsoring Office - RES in regulatory requirements.

-Category 2 Item

-Issue #120

{ ________________________________________________________________________________

Review, Proposed Revision Complete Subject to satisfactory staff to 10 CFR Part 50 of resolution of CRGR concerns, the

! Appendix J (Primary Reactor CRGR recomends that the EDO Containment Leakage Testing forward the proposed Appendix J for Water-Cooled Power rule and accompanying RG MS 021-5 Reactors) to the Comission for approval.

t -Sponsoring Office - RES

-Category 2 Item

-Issue #111 Review, Proposed Amendments Complete CRGR recomends that the proposed to 10 CFR 21, Reporting of amendments be issued for public coment after modifications are Defects and Noncompliance and 10 CFR 50.55(e), Reporting of made. These modifications should Defects in Design and be coordinated with the ROGR staff.

i Construction

) -Sponsoring Office - IE 4

-Category 2 Item

-Issue #119 l

) S i

SUMMARY

OF CRGR ACTIVITIES -

NOVEMBER 1981 THROUGH AUGUST 1986 1

5 Meeting No. '

, Meeting Date (Announcement CRGR CRGR Recommendation j Date) Agenda Status to EDO l

l 77 Review, Proposed Revision Pending No recommendation at this time.

i 6/3/85 to 10 CFR Part 50, of This issue will be continued l Appendix J (Primary Reactor at the next CRGR Meeting.

i; Containment Leakage Testing (No. 78, scheduled for for Water Cooled Power Reactors July 8, 1985) and Related RG (Task No.

1 MS 021-5) j

-Sponsnring Office - RES

, -Category 2 Item

-Issue #111 i

I 76 Review, Proposed Regulatory Pending CRGR recommended issuance of j 5/29/85 Guide (IC 609-5) " Criteria the RG after modification and 1

for Power, Instrumentation, after the CRGR Chairman has I and Control Portions of Safety reviewed the revised version j Systems j.

to determine if further CRGR review is needed.

1

-Sponsoring Office - RES i

-Category 2 Item

-Issue #116 Briefing, Proposed Revision Pending No CRGR recommendation necessary j to 10 CFR Part 50 of

' at this time. The CRGR will Appendix J (Primary Reactor review this item at CRGR Meeting Containment Leakage Testing No. 77. i for Water-Cooled Power

! Reactors) i i

-Sponsoring Office - RES

! _ Category 2 Item

-Issue #111 l

SUMMARY

OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No.

Meeting Date (Announcement CRGR CRGR Recommendation Date) Agenda Status to EDO 75 Briefing, Proposed Revision Complete RES should send ANPR to CRGR 5/14/85 to 10 CFR Part 60, Disposal of to determine if it should (5/23/85) High Level Radioactive Waste receive CRGR review. After in Geologic Repositories, receiving the ANPR, the CRGR members were polled and they indicated that CRGR review is not necessary.

-Spor.zoring Office - NMSS

-Category 2 Item

-Issue #114 Briefing, Proposed Revision Pending CRGR would like to have technical of Appendix K (ECCS Evaluation reporting findings prior to Models) of 10 CFR 50, Domestic reviewing the rule package. CRGR Licensing of Production and indicated that ELD should develop Utilization Facilities views about SECY 83-72 and legal advisability of differing remedies /

options that might be taken in this matter.

-Sponsoring Office - RES

_ Category 2 Item

-Issue #115 74 Briefing, Proposed Revision Pending RES agreed to provide another CRGR 4/17/65 to 10 CFR Part 50, Appendix J, briefing in May.

(5/16/85) Primary Reactor Containment Leakage Testing for Water- ~

Cooled Power Plants

-Sponsoring Office - RES

-Category 2 Item

-Issue #111 ,

e

l St# MARY OF CRGR ACTIVITIES -

, NOVEMBER 1981 THROUGH AUGUST 1986 l Meeting No.

Meeting Date (Announcement CRGR CRGR Recomunendation ,

Date) Agenda Status to EDO i

l l 74 (Continued) Review, Proposed Amendments Pending CRGR reconuended that proposal

! to 10 CFR Part 70, Domestic be modified to incorporate j Licensing of Special Nuclear clarifications suggested by the i Material; Part 73, Physical CRGR, and reviewed by staff to I Protection of Plants and assure that reporting of safe-

} Materials; Part 74, Material guards events is necessary and l Control and Accounting of timely. CRGR will then decide

Special Nuclear Material and if further review is necessary.

I Rev. I to RG 5.62. Reporting of Physical Security Events.

j -Sponsoring Office - NMSS j -Category 2 Item 1 -Issue #112

]

Review, Proposed Rulemaking Pending CRGR recommended that the -

to Establish Retention Periods proposed revisions be modified, for Recordkeeping Requiresents reviewed by program staff of l of 10 CFR cognizant offices, and re-

! submitted to CRGR for review, i . Sponsoring Office - ADM i -Category 2 Ites .

i -Issue #113 ,

1 73 Proposed Regulatory Guide Complete CRGR reconnended that the Reg.

3/12/85 IC 127-5 Criteria for Program- Guide be issued after modifi-(3/26/85) mable Digital Computer Systems cation to reflect CRGR comuments

) in Safety Related Systems of and reconuendations. RES should l Nuclear Power Plants coordinate with ROGR staff

in completing these modifications.

i -Sponsoring Office . RES

-Category 2 Item

-Issue #107 i

1

SUMMARY

OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 e

Meeting No.

Meeting Date CRGR CRGR Recommendation (Announcement Date) Agenda Status to EDO _

i I

73 (Continued) Proposed Amendment to Complete CRGR recommended that the rule i be issued after (1) modification 10 CFR 50, Appendix E,

" Unusual Event" to reflect CRGR recommendations and (2) formal concurrence by FEMA.

-Sponsoring Office - RES

-Category 2 Item

-Issue #108 i ________________________________________________________________________________.

Views and Reconnendations Complete CRGR reaffirmed its recom-l mendations from Meetings 48 i

on RG 1.105, Instrument Setpoints for Safety-Related and 53.

1 Systems ,

-Sponsoring Office - RES i -Category 2 Item

-Issue #82 i

Generic Resolution of Complete No recommendation necessary.

l As provided by the CRGR Charter NUREG-0803 Generic Safety Evaluation Report Regarding and approved by the CRGR Integrity of BWR SCRAM members, the CRGR Chairman l System Piping exempted this item from review.

)

, -Sponsoring Office - NRR

-Category 2 Item d -Issue #109 Standard Review Plan Section Complete No recommendation necessary.

j As provided by the CRGR Charter t

13.5.2 Operating and Maintenance Procedures and approved by the CRGR

'j Revision members, the CRGR Chairman i

exempted this item from review.

I

-Sponsoring Offige - NRR

-Category 2 Item .

-Issue #110 -

l l

i SUMARY OF CRGR ACTIVITIES -

NOVEMBER 1981 THROUGH AUGUST 1986 i' Meeting No. -

i Meeting Date (Announcement CRGR CRGR Recommendation

! Date) Agenda Status to EDO i

I 72 1 Jan. 9, 1985 Review of NRR Proposed Complete No recommendation necessary.

(Dec. 26, 1984) Resolution of Generic Issue As provided by the CRGR Charter

, III.D.2.3, Liquid Pathway and approved by the CRGR j Radiological Control members, the CRGR Chairman

exempted this item from 1 review.

i ,

-Sponsoring Office - NRR t -Category 2 Item i -Issue #104 Review cf NRR Proposed Complete No recommendation necessary.

l Draft Regulatory Guide 1.114 As provided by the CRGR Charter i

1 Rev. 2. Guidance to Operators and approved by the CRGR l at the Controls and to Senior members, the CRGR Chairman i ,

l Operators in the Control Room exempted this item from review. '

l of a Nuclear Power Unit ,

-Sponsoring Office - NRR

-Category 2 Item .

l -Issue #105

! Discussion of December 20, Complete CRGR recomunended that the EDO

1984 Memorandum from Cosen. reemphasize to staff that they  ;

Asselstine to Comm. Roberts should freely discuss any Concerning the Efficacy of the safety concerns with CRGR Process. management.

-Issue #106 4

1

' i I

i SLBMARY OF CRGR ACTIVITIES .

NOVE9BER 1981 THROUGH AUGUST 1986 l ' .

! Meetir.g No.

Meeting Date l

(Announcement CRGR CRGR Recommendation Date) Agenda Status to EDO t

l 71 l Dec. 3, 1984 Review of Proposed Pending CRGR recommended that the package

{ (Nov. 16, 1984) Requirements Resulting be revised to reflect / address i from Resolution of CRGR comments and resubmitted ,

i USI A 46, Seismic Qual- for review.

l ification of Equipment .

3 in Operating Plants .

l

-Sponsoring Office _ NRR

-Category 2 Item

-Issue #103 l

l 70 Oct. 17, 1984 Briefing on Proposed NRC Complete CRGR suggested that the staff j (Sept. 26, 1984) Policy Regarding Minimum resolve CRGR concerns, modify j Dosimetry for Offsite the proposal as appropriate and j Emergency Workers forward modified proposal to the i CRGR Chairman for review and j disposition.

_ Sponsoring Office - IE

-Category 2 Item j -Issue #102 Review of Proposed Final Complete CRGR recommended that the proposed Version of Generic Letter letter be issued for public

'i Concerning Quality Assurance comment after certain actions Related to the ATWS Rule are taken.

(Also discussed at Mtg. No. 67)

-Sponsoring Office - IE

-Category 2 Item

. Issue #99 ,

. . , -- .v. +, w r -

+ - r- e.

i SLMtARY OF CRGR ACTIVITIES -

NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No.

Meeting Date (Announcement CRGR CRGR Recossendation Date) Agenda Status to EDO I

70 (Continued) Review of Proposed Final Complete CRGR recommended that the EDO l Rule Concerning Pressurized forward the proposed rule to l Thermal Shock (PTS) the Commission for their approval.

(Also discussed at Meeting Nos. 21, 23 and 38

-Sponsoring Office - NRR j -Category 2 Item ,

-Issue #41 1

69 Sept. 5, 1984 Proposed Final Rule Complete No recommendation necessary. ,

(Aug. 24, 1984) 10 CFR Part 53, Criteria and As provided by the CRGR Charter 1 Procedures for Determining and approved by the CRGR .

} the Adequacy of Spent Nuclear members, the CRGR Chairman Fuel Storage Capacity. (Also exempted this item from Discussed at Mtg. No. 33) review.

-Sponsoring Office - RES

! -Category 2 Item j -Issue #59 Review of Proposed IE Bulletin Complete CRGR recommended that NRR contact 84- " Cracking in Boiling .

the utilities to determine the Water Reactor Mark I and Mark II necessity of issuing the bulletin Containments Caused by Inerting and if bulletin is required, System Failure certain modification should be made before it is issued.

-Sponsoring Office - IE

-Category 2 Item

! -Issue #I00 l

a l

D

f 1

)'

St# MARY OF CRGR ACTIVITIES NOVEMBER 1981 THROUGH AUGUST 1986 l '

! Meeting No.

l Meeting Date

(Announcement CRGR CRGR Recommendation

! Date) Agenda Status to EDO i

j 69 (Continued) Briefing on Staff Rulemaking Pending CRGR reconnendation was not

! Activities Regarding Emergency required.

l Response for Earthquakes l -Sponsoring Office - IE 1 -Category 2 Item j -Issue #101 1

i 68 j August 8, 1984 Review of revised version of Complete Recomumended issuance for public (July 26, 1984) RES Proposed Amendments to comment after modification to 10 CFR Parts 30, 40, 50, 51, incorporate the one remaining 70 and 72 to incorporate CRGR reconnendation.

Decomnissioning Criteria for I Nuclear Facilities. (Also Discussed at Mtg. No. 62)

-Sponsoring Office - RES

-Category 2 Item

-Issue #95 67

, July 25, 1984 Review of Proposed IE Bulletin Complete CRGR reconnended proposed 1 (July 10, 1984) "Undervoltage Trip Attachments bulletin not be issued.

I of Reactor Trip Breakers"

! (Also Discussed at Mtg. Nos, j 25,61) i j -Sponsoring Office - IE

-Category 2 Item j -Issue #94 b,

s

. -.--. ._.-. _. . . . , , . . ., , ,. .__..,r. ,. .. .- . _ . . .

SUMARY OF CRGR ACTIVITIES '

NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No.

Meeting Date (Announcement CRGR CRGR Recommendation Date) Agenda Status to EDO 67 Briefing on Staff Plans to Complete CRGR suggested that the QA (Continued) Cevelop & Issue Generic Ltr. program be structured consistent to Include Quality Assurance with industry practices for Requirements for Important- similar nonsafety-related equip-to-Safety ATWS Equipment ment.

-Sponsoring Office - IE

-Category 2 Item

-Issue #99 66 July 11, 1984 Briefing on Staff's Long Complete Recommendation was not required.

(June 27, 1984) Range Plans to Address Pipe Cracking (Also Discussed at Mtg.

Nos. 20, 22, 31, 45, 49)

. Sponsoring Office - NRR

-Category 2 Item

-Issue #56 (40)

Review of Proposed Resoluticn Pending CRGR recommended that this pro-of USI A_43, " Containment posal not be accepted at this time.

Emergency Sump Perforiaance CRGR agreed to reconsider this (Also Discussed at Mtg. Nos. proposal or a modified version 26,28) after receipt of responses to I -Sponsoring Office - NRR

-Category 2 Item

-Issue #47 i

l' t

me

StMtARY OF CRGR ACTIVITIES .

NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No.

Meeting Date (Announcement CRGR CRGR Recomunendation Da_te) Agenda Status to EDO 65 June 27, 1984 Review of Proposed Revision Complete Recomunended issuance of the (June 18, 1984) 3 to Reg. Guide 1.28, Quality Reg. Guide after modification Assurance Program Requirements to reflect CRGR comunents and (Design & Construction) (Also recomumendations.

discussed at Mtg. #51)

-Sponsoring Office - IC

-Category 2 Item

-Issue #97 Proposed Amendments to Complete No recomunendation necessary.

10 CFR 50, Domestic As provided by the CRGR Charter 1.icensing of Production and approved by the CRGR and Utilization Facilities members, the CRGR Chairman exempted this item from review.

-Sponsoring Office - ADM

-Category 2 Item

-Issue #98

~

64 May 30, 1984 Review of Proposed Major Complete Reconenended publication for (May 2, 1984) Revision of 10 CFR Part 20, public comments after modifi-Standards for Protection cations are made to reflect Against Radiation (Also CRGR comments and recom-discussed at Mtg. #25, #62, mendations.

and #63).

-Sponsoring Office - RES

-Category 2 Item

-Issue #45

SUMMARY

OF CRGR ACTIVITIES .

NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No.

Meeting Date (Announcement CRGR CRGR Recosuendation Date) Agenda Status to EDO 63 May 9, 1984 Briefing concerning the Complete CRGR recommendation was not re-(April 16, 1984) Status of Proposed Major quired.

Revision of 10 CFR Part 20, Standards for Protection Against Radiation (Also discussed at Mtg. #25 & #62)

-Sponsoring Office - RES

_ Category 2 Item

-Issue #45 Review of Proposed Pending CRGR review not completed pending Resolution of Generic Issue additional staff work. This A-30 " Adequacy of Safety issue will be rescheduled when Related DC Power Supply staff work is complete.

-Sponsoring Office - NRR

-Category 2 Item

-Issues #96 62 April 25, 1984 Briefing concerning the Complete CRGR reconnendation was not re-(April 16,1984) Status of Proposed Major quired. Another briefing is

, Revision of 10 CFR Part 20, scheduled for CRGR Meeting #63 Standards for Protection (5/9/84).

Against Radiation (Also discussed at Mtg. #25).

i

-Sponsoring Office - RES

_ Category 2 Ites

! -Issue #45 e

SUMMARY

OF CRGR ACTIVITIES .

NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No.

l Meeting Date

! (Announcement CRGR CRGR Recomendation I Date) Agenda Status to EDO i,

! 62 (Continued) Review of proposed Amend. Complete The amendments should not j ments to 10 CFR Parts 30, 40, be approved until additional 50, 51 70 and 72, to incorpor- staff work is completed ate Decommissioning Criteria and the issue is again for Nuclear Facilities. considered by CRGR.

l -Sponsoring Office - RES i -Category 2 Item

! -Issue #95 i 61 April 4, 1984 Review of proposed IE Complete The bulletin should be issued (March 21, 1984) Bulletin, "Undervoltage after modification. Subsequent Trip Attachments of Reactor to this meeting, the CRGR Trip Breakers." (Also recommended to the EDO that discussed at Mtg. #25) the bulletin not be issued.

i (Refer to Meeting No. 60)

-Sponsoring Office - IE

-Category 2 Item j -Issue #94 .

, Continued review of the Complete No recommendation - Issue continued proposed resolution of USI at Mtg. No. 60 l A-44 Station Blackout (Also discussed at Mtg. Nos. 59, 60).

i i

-Sponsoring Office - NRR j

-Category 2 Item

-Issue #75 e

SUMMARY

OF CRGR ACTIVITIES -

NOVEMBER 1981 THROUGH AUGUST 1986 Meeting No. '

t Meeting Date (Announcement CRGR CRGR Recommendation

Date) Agenda Status to EDO 60 April 11, 1984 Continued review of the Complete Recommended issuance for public (March 14, 1984) proposed resolution of USI comment after taking into account A-44 Station Blackout (Also CRGR concerns.

discussed at Mtg. Nos.59, 61) '

-Sponsoring Office - NRR

-Category 2 Item i -Issue #75 Review of the proposed Complete The CRGR recommended addition-resolution of Generic Issue al work and issuance of a B-56, Diesel Generator 50.54(f) letter.

Reliability. (Also discussed at Mtg. No. 43)

-Sponsoring Office - NRR

-Category 2 Item

-Issue #75 Reconsideration of proposed Complete At Meeting #61, the CRGR recom-IE Bulletin, "Undervoltage mended that the bulletin be issued Trip Attachments of Reactor after modification. CRGR recon-Trip Breakers." (Also sidered the bulletin and recom-discussed Mtg. Nos. 25, 61,) mended that it not be issued until additional work is done and it is again considered by CRGR,

-Sponsoring Office - IE

-Cateocry 2 Item

-Issue #94

SUMMARY

OF CRGR ACTIVITIES .

NOVEMBER 1981 THROUGH AUGUST 1986 .

e Meeting No.

Meeting Date (Announcement CRGR CRGR Reconenendation Date) Agenda Status to EDO 59 March 28, 1984 Review of the proposed Complete The CRGR has not completed its (March 14,1984) resolution of USI A-44 review of the proposal and Station Blackout and therefore has not yet made Generic Issue B-56, Diesel recommendations.

Generator Reliability (Also discussed at Mtg. No. 43)

_ Sponsoring Office - NRR

-Category 2 Item

-Issue #75 58 March 13, 1984 Briefing concerning a Complete Assuming ELD concurrence with (March 2, 1984) Proposal for an Integrated the proposal, it was acceptable Safety Assessment Program to the CRGR. The CRGR suggested (ISAP) (Also discussed that the proposal be forwarded at. Mtg. No. 44) to the Cournission.

-Sponsoring Office - NRR

_ Category 2 Item

-Issue #77 Review of Proposed Complete The CRGR recomunended approval NUREG-0801, Evaluatlon after modification.

Criteria for Detailed Control Room Design

-Sponsoring Office - NRR

-Category 2 Item j

-Issue #93

SU M ARY OF CRGR ACTIVITIES .

NOVEMBER 1981 THROUGH AUGUST 1986 i

Meeting No.

t Meeting Date CRGR CRGR Recomunendation (Annconcement to EDO

Date) Agenda Status 4 57 Review, Proposed NUREG-0801, Complete CRGR recommended that NUREG-0835 Evaluation Criteria for not be published. CRGR, with NRR 2/15/84 agreement, decided to postpone Detailed Control Room Design Review, and NUREG- review of NUREG-0801 0835. Human Factors Review Guidlines for the Safety i Parameter Display System

-Sponsoring Office - NRR

-Category 2 Item

, -Issue #92 l

i I .

1 l

i 2

1

e-1 Pase 44 of 45~~

-~

8 Summary of CNGR Activities Date 05-20-84 INovember 1981 through February 1984)

I I SPONSORING CRGR CRCR ALSO CRGR CRGR RECOMMENDATION I MEETING OFFICE CATEGORY ISSUE TOPIC STATUS

~

TO EDO I NUMBER NUMBER AT CRGR j l l MEETING 18 DATE l AGENDA NUMBER I I

__ _1 NOTICE)

.55 02/06/84 Review of the IE 2 90 --- Completed Proposed bulletin should i 101/09/84) proposed IE be issued after

, IBulletin entitled modifications.

i " Failures of General Electric Type HFA Relay in i Use in Class IE Safety Systems."

561 02/C3/84 Review of the NRR 2 91 --- Completed CRGR agreed with the (01/23/84)lstatus of the NRR proposal.

I staff's evaluation and conclusions I regarding the need i for power operated '

I relief valves

. l (PORV) for power I iplants designed by Combustion Engineering, Inc.

(CE).

1 i

l j i e

w e

r Page 43 of 45- ~-

8 Susunary of CRGR Activities Date 08-20-84 (November 1981 through February 1984)

SPONSORING CRGR CRGR lALSO CRG.6 CRGR RECOl#4ENDATION MEETING OFFICE CATEGORY ISSUE l TOPIC STATUS TO EDO l NUMBER NUMBER lAT CRGR MEETING 8 DATE AGENDA NUMBER I (NOTICEI 54 01/19/84 Proposed revision RES 2 89 --- Completed Proposed revision (2)

(12/27/83) (1) to Reg. Guide should be issued after 1.89 Envaronmental modification.

Qualification of Electric Equipment i Important to Safety l for Nuclear Power i Plants.

I .

l I

I I

I I

l i I

t e

Page 42 of 45--

8 Summary of CRGR Activities Date 08-20 84 (November 1951 through February 1984)

SPONSORING CRGR CRGR ALSO CRGR CRGR RECOPO4ENDATION i MEETING OFF.CE CATEGORY ISSUE TOPIC STATUS TO EDO NUMBER NUMBER AT CRGR l MEETING

8 DATE l AGENDA NUMBER l

(NOTICE) 53 01/11/B4 a) Proposed final NHSS 2 87 --- Completed Staff proposal should be .

l l(12/19/83) version of a app roved howeve r t he paper should be modified I i revision to 10 CFR Part 51, to highlight certain e Licensing and issues. Thereafter. ELD Regulatory should review the paper.

Policy and Procedures for Environmental Protection (Adds narrative explanation for Table S.3, Uranium Fuel Cycle Environ-mental Data) ,

b) Proposed NMSS 2 SS --- Completed Agreed with the staff revision to the proposal, however existing rule on certain policy-related protection of considerations where Spent Fuel e raised for EDO/

shipments Commission consideration (IDCFR Part 73).

g---__._____.---_-__ .....--._______ . _____. ....... ....... ......--- ___________........--- .

c) Proposed RES 2 82 48 Completed Staff proposal should revision (21 to not be approved as Regulatory Guide submitted i 1.105 l Instrument i Setpoints for Safety Related i Systems.

I f.

O

Page 41 of 45-~

Summary of CK3R Activities Date 08-20-84 --'

(November 1981 through February 1984)

SPONSORING CRGR CRGR ALSO CRGR CRGR REC 006iENDATION MEETING OFFICE CATEGORY ISSUE TOPIC STATUS TO EDO NUMBER NUMBER AT CRGR l MEETING BI DATE AGENDA NUMBER I

IMOTICEI 52 12/08/83 a) Review of a IE 2 85 ---

Completed The Bulletin should L:

(11/18/83) proposed IE Bulletin, issued after

, modification.

" Electrical Circuit Breakers with an Under-voltage Trip Feature in Use in Safety-Related Applications Other Than the Reactor Trip System."

b) Review of a NRR 2 86 ---

Completed The proposed rulemaking proposed should be approved after l rulemaking for modification. '

i " Training and 1 Qualifications of Personnel Performing Functions Important to Safety."

ISection 306 of NWP Act of 1982) i I I 1

l

o-Page 40 of 45-~

Summery of CRGR Activities Date 08-20-84 (November 1981 through February 1984)

SPONSORING CRGR CRGR ALSO CRGR CRGR RECOMMENDATION MEETING OFFICE CATEGORY ISSUE TOPIC STATUS TO EDO NUMBER NUMBER AT CRGR MEETING s DATE AGENCA NUMBER INOTICE) _._, _

50 10/26/83 Keview of a policy NRR 2 84 --- Completed The staff position l l(10/21/83) issue - propeted should not be approved l l st af f position on as proposed i l l *the definition of l l  ; "important to l l Isafety' and l

  • safety-related".

I 51 11/23/83 Review of a major NRR 2 60 33 Completed The proposal should be (11/10/83) policy issue - the approved pending proposed resolution resolution of CRGR '

i of US1 A-1, Water comments.

Hammer.

I I

i I

i

' I I

i i

Page 39 of 45---

Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984)

SPONSORING CRGR CRGR ALSO CRGR LRGR REC 0K;2NDATION MEETING OFFICE CATEGORY ISSUE TOPIC STATUS TO EDO l NUMBER NUMBER AT CRGR MEETING i e DATE AGENDA NUMBER I [ NOTICE) i 1 491 10/24/83 a) Review of a NRR 1 56 Completed The proposed require-l(10/19/83) major policy (40) (20 31545 22l ments should be issue - approved, however the requirements for Commissi.n paper should reinspection of be modified l BWR piping and I repair of I cracked piping.

l tt) Continuation of NRR 2 80 46&47 Completed The proposal should be i the review of a approved after I major policy modification.

issue - proposed resolution of l USIs A-3. A-4

'I and A-5 regarding steam I generator tube I antegrity. -

1 I

I

' i I

I i I I I I I

I i

I l e

e s Page 38 of 45--

Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984)

I .

SPONSORING CRGR CRGR ALSO CRGR CRGR RECOpeElWATION MEETING OFFICE CATEGORY ISSUE TOPIC STATUS TO EDO NUMBER NUDEBER AT CRGR l MEETING S DATE I AGENDA NUMBER 1

__ (NOTICEI l l 48 10/20/83 laj Review of a RES 2 82 ---

Completed As proposed, the guide (10/14/83) proposed revision should not be Revision (2) to approved. The staff Regulatory Guide should reconsider and 1.105. Instru- coordinate with other ment Setpoints offices, the proposed for Safety revision. Thereafter, Related Systems, the revision should be submit ted f or CRGR review.

I b) Review of a NRR 2 43 ---

Pending As proposed, the rule proposed rule should not be approved concerning a until additional staff I degree work is completed and requirement for the issue is again i operating staff considered by CRGR.

I at nuclear i powe r plant s . '

l 0

Page 37 of 45~~

Summary of CRGR Activities Date 08-20-84

-~

(November 1981 through February 1984) l CRGR ALSO STATUS CRGR RECOMMENDATION I SPONSORING CRGR MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR MEETING 8 DATE AGENDA NUMBER

__ _tNOTICEI Review of proposed NRR 2 80 49 Cogle t ed Requested additional 46 9/14/83 (MTG 849) information from staff.

(8/25/83) generic require-ments relating to I

Steam Generator 6 Tube Degradation and Rupture Events I and concerning resolution of USIs lA-3. A-4 and A-5.

Review of proposed NRR 2 81 --- Completed Recommended approval.

47 9/28/83 exegtions to the (9/15/83) regulations in the ,

implementation of multiplant action D-10 (USI A-2) far PWRs evalukted by l Westinghouse Topical Re orts WCAP-9558 Rev. 2) ,

I and WCAP 9 87.

l

e-Page 36 of 45~-

Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984) l l SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION MEETING OFFICE CATEGORY ISSUE TOPlc TO EDO NUMBER NUpWER AT CRGR MEETING 8 DATE AGENDA NUMBER INOTICE1 3 45 8/17/83 a) Briefing NRR 2 78 ---

Pending Recommended additional (8/4/83) concerning the staff work and then human factors CRGR review.

review of remote shutdown capability in the detailed control room design reviews for operating reactors.

b) Briefing MRR 2 79 ---

Completed Recommended approval I concerning the of the NRR results of the recommendation.

Study of .

Electromagnetic

. 1 Pulse (EMP)

I t Effects and NRR i

i recommendations l regarding EMP.

c) Review of the NRR 1 40 20 22 Completed Recommended approval I proposed orders (56) &d9 of the orders after for ooerating (31) modifications.

BWR Plants (5) that have not been inspected i for inter-gramular stress I corrosion cracking of plant piping.

i l

l

Page 35 of 45-~

Summary of CRGR Activities Date 08-20-84

-~

(November 1981 through February 1984)

SPONSORING CRGR CRGR ALSO STATUS CRGR RECOPO4ENDATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR I MEETING R DATE I AGENDA NUMBER (NOTICE) l__ 2 76 Completed Returned to NRR for 441 8/10/83 a) Review of a NRR ---

additional work and 17/22/83) major policy then CRGR review.

issut - the proposed t

I resolution of Generic Issue B-10, Behavior of BWR Mark III

Containment.

I ___.. __ __.___ ..___.__ ______. .____._ ____..___ ___.____.__.________..__

i b) Review of a NRR 2 77 58 Completed Returned to NRR for i major policy (MIG R58) additional work and issue - a then CRGR review.

a proposal for an ,

! Integrated i l Safety l l Assessment i Program (ISAP).

1 1'

I l.

o-( Page 34 of 45 Summary of CRGR Activities '

  • Date 08-20-84 l (November 1981 through February 1984) l i SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION l l MEETING OFFICE CATEGORY ISSUE TOPIC i l TO EDO NUMBER NUMBER AT CRGR i l l MEETING l 8 DATE l AGENDA NUMBER

__ INOTICEI i 43 7/27/83 a) Review of a NRR 2 74 --- Completed Recommended that the l l7/18/83) major policy proposed resolution of issue - the USI A-12 be approved proposed resolution of after modifications.

USI A-12 Potential for i Low Fracture 3

l l Toughness and i Lamellar Tearing in PWR Steam Generator and i Reactor Coolant Pump Supports.

g ..___ ____..___ ___ ..__...___.____ ___..... ....... ..... . __ ___... ______..__._________..__ ,

1 I b) Review of a NRR 2 75 59 80 Completed Returned to NRR for i major policy d61 additional work and I issue - the then CRGR review.

I proposed interim requirements for enhancing the i reliability of diesel i

' generators at operating reactors

' (Generic Issue B-56).

Im#

I 0

Page 33 of 45-- Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984) l CRGR RECOMMENDATION l SPONSORING CRGR CRGR ALSO STATUS I MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR l MEETING 8 i DATE AGENDA NUMBER I

l__ (NOTICEI ,

I 42 7/12/83 a) Review of IE IE 1 73 30 Completed Recommended that the (7/4/83) Bulletin Bulletin be issued concerning after modifications, fraudulent products sold by Ray Miller Inc.

l Completed Recommended that the I b) Review of the RES 2 44 24,30 i final rule, 10 34&39 rule be approved after l CFR 50.60, modifications.

Reduction of .

I I Risk from Anticipated Transients without Scram 1

l (ATWS) Events l , for Light Water

~

I I Cooled Nuclear Power Plants.

t i i 1

i

1 k

1 l

l'

E Page 32 of 45~~

Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984)

SPONSORING CRGR CRGR ALSO STATUS CRGR RECOD04ENDATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO

--~~ NUMBER NUMBER AT CRGR MEETING 8 DATE AGENDA I NUMBER I (NOTICEI _

41 7/6/83 ,a) Review of the RES 2 70 ---

aleted Recommend . that the (6/24/83) final rulemaking rulemakin ao approved to amend 10 CFR after mod fications.

Part 50.54 l concerning fitness for j duty.

I b) Review of l~ 2 71 ---

Completed Recommended that the NUREG-0849, NUREG be issued after Standard Review modifications.

Plan for the l Review and Evaluation of Emergency Plans for Research and i Test Reactors.

9 c) Review of IE IE 2 72 ---

l Completed Recommended that the l Bulletin '

Bulletin be issued after concerning modifications.

Nonconforming Materials Supplied by Tube-Line Corporation.

e a

Page 31 of 45--

-- . Summary of CRGR Activities Date 08-20-34 (November 1981 through February 1984) l l SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION I MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO l

l NUMBER NUMBER AT CRGR

! l MEETING

! 18 DATE AGENDA NUMBER l I l__ INOTICE) l I

0 6/1/s3 41 a) Review of RES 2 68 --- Completed Recomm.1ded approval (5/18/83) proposed with modifications.

amendment to i 10CFR50 i concerning hydrogen control requirements.

l b) Review of the NMSS 2 35 16 Completed Recommended that the proposed package be approved Insider Rule- after CRGR comments are making Package addressed. Also concerning recommer.ded that the nuclear power package be accompanied reactors. by a recommendation that the Commission '

l l reconsider a Government clearance program to I

address the " Insider i Threat" and reduce plant

protection burden.

1 i

c) Briefing NRR 2 69 ---

Completed Recommendation was not concerning the required. CRGR 1 Operator concluded that program i Requalification is appropriate and Program, offered comments.

9 I

I I

4

4 Page 30 of 45--

-~

Summary of CRGR Activities Date 08-20-84

[ November 1981 through February 1984) l SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION l MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO l NUMBER NUMBER AT CRGR I MEETING 8 DATE AGENDA NUMBER 1

__ (NOTICEI 39 5/25/83 al Review of NRR 2 67 ---

Completed Recommended approval 15/10/83) overall revision with mootfications.

of 10 CFR 71,

+

Packaging of

' Radioactive Material for Transport and Transportation l l of Radioactive Material Under l Certain

l Conditions.

4 l (U.S./IAEA j i Compatability) b) Review of the RES 2 44 24 30 completed Recommended rule final rule $4 l Mig 842) modifications and 1 10CFR50.60 d42 resubmittal for further l l l titled Reduction of CRGR constderation after 1

Risk From staff work is completed.

! Anticipated Transients Without Scram l

IATWS) Events for Light-Water I i

Cooled Nuclear l Power Plants, I

I

! I i

i l

l

i

  • Date 08-20-84 Page 29 of 45- Summary of CRGR Activities l

(November 1981 through February 1984)

I CRGR RECOMMENDATION SPONSORING CRGR CRGR ALSO STATUS l OFFICE CATEGORY ISSUE TCPIC TO EDO MEETING l

' NUMBER NUMBER AT CRGR MEETING DATE AGENDA NUMBER 18 INOTICE) 38 5/18/83 a) Review of the NRR 2 41 21&23 Completed Recommended rule modifications and (5/10/83) proposed rule titled. Analysis resubmittal for further of Potential CRGR consideration after Pressurized staff work is completed, i Thermal Shock Events.

1 b) Briefing NRR 2 66 --- Completed Recommendation was not concerntag a required. The Committee major policy endorsed the use of issue - NRR prioritization in methodology used managing generic issues to prioritize and generally agreed '

generic safety with NRR's approach and assues. methodology I___________________ ..__..___..____ ____ .__ ....__. .___ .. ...._____ ________________________

l i I

I I

! I i

l

Page 28 of 45-

. Susunary of CRGR Activities Date 08-20-84 (November 1981 through February 1984) i SPONSORING CRGR CRGR ALSO STATUS CRGR REC 0044ENDATION MEETISKs OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR MEETING e DATE AGENDA NUMBER (NOTICE) 35 4/25/83 Briefing concerning NRR 1 65 36437 Completed Recommendation was not

(4/21/83) the findings required. Ceaumen t s we re of the Salem offered.

I Generic Implications Task Force.

36 4/29/83 l Briefing concerning NR.i 1 65 35&37 Completed Recomunendation was not (4/27/83) the rec omune nd a t io n s required. Comument s were of the Salem offered.

Generic Implications Task Force.

37 5/11/83 Review of staff MRR 1 65 35&36 Completed Recomumended approval (4/27/83) proposed actions with modifications.

in respor.se to the findings and recomunendations of the Salem Generic Implications Task Force.

l t

l

Page 26 of 45- *

~ Susumary of CRGR Activities Date 08-20-84 (November 1981 through February 1984)

SPONSORING CRGR CRGR ALSO STATUS CRGR RECOpetENDATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR l MEETING 18 DATE AGENDA NUMBER l

, t_ _L40TICE1

, 34 l 4/22/83 a) Briefing NMSS 2 62 ---

Completed Reconenendation was not (4/4/83) concerning Low required. Ceaunent s were Level Waste Form offered.

and Classifi- 1. Forward for ACRS cation Branch & p ublic c omune n t s .

Technical 2. Closely coordinate Positions current and future (BTPs). activities with other agencies riate and local governments, and I andustry.

, b) Briefing NMSS 2 63 ---

Completed Recomumended that concerning the 1) Committee's report i

findings and be forwarded te i

i reconunendations industry and NRC 1 I l of the Committee managers and license 4

l to Review reviewers i Safeguards 2) Rulemaking activities j i Requirements at i should address i

Power Reactors. Committee's findings l

and recomunendations.

I '

1 i

l l I i

e Page 27 of 45~

- , Sueunary of CRGR Activities Date 08-20-84

{ November 1981 through February 1984)

SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMKENDATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR I MEETING 8 l DATE AGENDA NUMBER i I .

_ _LNlO ICE) ,

34 4/20/83 cl Briefing RES 2 44 24 30 Completed Recommendation was no' l (4/4/83) concerning ATWS 59 (MTG 842) required. Comunen t s we re i rulemaking d42 offered. Staff should activities. reconsider

1) Reliability assurance
2) program Plant unique requirements implementation of I the rule.

I I g g................... .....__........ .....___ ....__. ....__. ......... .___................___.

I I d) Review of IE IE 2 64 --- Completed Recomunended that t he Bulletin titled staff assure that*

ASME Nuclear 1) Product liabilities Code Pumps and and quality assurance i Spare Parts responsibilities are -

Manufactured by l not degraded, the Hayward 2) The information Tyler Pum requested is needed.

Company. p 3) The focus is on safety-related systems.

4) Affected pumps and parts are tracked.

I I

I i

l I 6 1

i

, e -- -

e

o Page 25 of 45-Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984)

SPONSORING CRGR CRGR ALSO STATUS CRGR RECODMEISATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR MEETING e DATE AGENDA NUMBER

__ (NOTICEI 33 3/9/83 a) Review of 10CFR RES 2 59 ---

Completed Recomunended approval I (2/25/83) Part 53 with modifictaions.

Criteria and Procedures for l 1 Determining the 1 Adequacy of Spent Nuclear Fuel Stora Capacity. ge

_____________ _____ __ ___...__..__ ________ _______ .______ _________ _________ ______________I b) Review of a NRR 2 60 51 Completed Rec omune nded that the major policy SRP revisions and issue - NRR NUREG-0927 be released findings f o r public comunent after concerning CRGR comument s conce rning '

I resolution of implementation are USI A-1, Water addressed.

Hanune r .

I c) Briefing on an RES 2 61 ---

Completed CRGR review was not amendment to needed. Suggestions 10CFR50, were offered.

Appendix E, i Frequency o.f Emergency Preparedness Exercises.

(Amendment conforms to FEMA actlon.)

i I

I

_1 1

Page 24 of 45--

Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984)

SPONSORING CRGR CRGR ALSO STATUS CRGR RECOpe4ENDATION l MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR l 1 MEETING 18 1 DATE AGENDA NUMBER l I 6 l__ INOTICE)

I 32 2/17/83 la) Review of the AEOD 1 57 (2&28;' Completed Recommended approval (2/3/831 proposed final (8&52) after modifications.

Rule 10CFR50.73, I Licensee Event

. I I Reporting b) Review of the IE 2 58 28 Completed Recommended approval proposed (52) after modifications.

revision to I i 10CFR50.72, Immediate i Notification Requirements i i for Operating '

i Nuclear Reactors.

I I

i 1

i 1

I I I I l

, I i i 1

I

, I i

I l

I I

)

, v

Page 23 of 45 Summary of CRGR Activities

[ November 1981 through February 1984) Date 08-20-84

~ - "

i SPONSORING CRGR CRGR ALSO STATUS MEETING OFFICE CATEGORY CRGR RECODMENDATION ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR 8 DATE MEETING AGENDA NUMBER

_INOTICE) , _

__l 31 2/9/83 a) Peview of a IE 1 58 (20 Completed (2/3/83) proposed IE (40) &#9)22 reval Recommendedap$1ons.

after modifica Bulletin titled Stress Corrosion Cracking in Large - Diameter 1 Staanless Steel i I Recirculation l l System Piping at i I BWR Plants.

I .............._____ ....__ .___.... __...___ ....... ....... ...__.... .....___...__...........

I b) Review of a IE I 2 51 28 Completed Recomm. ended approval proposed IE Bulletin titled after modifications.

i Check Valve Failures in Raw '

i Water Cooling l l Systems of I l Dlesel i Generators.

8 I

I I I

I i

l i i I I

I I

I I

I I I I I I I I i 1 1 I

I I

I I l

l i

Page 22 of 45~~ Summary of CRGR Activities Date 08-20-44

, (November 1981 through February 1984) l I SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION 1 MEETING OFFICE CATEGORY ISSUE TOPIC 1 TO EDO NUMBER NUMBER AT CRGR I

le DATE AGENDA MEETING l NUMBER 1 i INOTICE) i l~~l 1301 1/26/83 a) Briefing RES 2 44 24 Completed Recommendation was not i I (1/13/83) concerning 34 39 INTG 842) required. Comments were questions that resulted from 44f offered.

the ATWS briefing given I at Meeting 324.

1 1 1 ___________________l_______________ ________ _______ _______ _________ ________________________

l I b) Briefing IE 2 55 42 Completed Recommendation was not I i concerning IE required. Comments were I actions to offered, i address a 1 potentially I significant l problem u

  • i pertaining to fraudulent I products sold by l Ray Miller Inc.

1' I

I i i i 1

1 1 I i l I

I I I I

i 1

4 e

s Page 21 of 45-

  • Seammary of CRGR Activities Date 08-20-84 (November 1981 through February 1984) 1 SPONSORING CRGR CRGR ALSC STATUS CPGR RECCDOGE9mAYION 1 MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO d

NUMBER 9RSWER AT CRGR l MEETING 8 DATE AGENDA NUISER l_ IMOTICEI 29 1/06/83 a) Review of the ELD 2 53 --- Completed Recosamended apprcval 1/12/83 proposed after modifications.

I (12/23/821 revision to i 10CFR Part 51 to l I implement the i i procedural I provisions of I section 10212)

I of NEPA.

l I I

, l bl Review of the NRR 2 54 --- Comoleted Recoaunended approval.

I final rule and I accompanying i i polscy statement .

, i 1 concerning i l operator I staffaag at

! I nuclear power i plants.

I I l i I

) I I

1 i

1 l 1 1 1 1 1 i i i l l I I I I I

l I I I .+

E I

l 4

L l

{

l

~

Page 20 of 45-

  • Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984) l l SPCMSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION I MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR MEETING S DATE AGENDA NUMBER INOTICEI I l l

28 il 12/21/82 a) Briefing I

IE 2 51 31 l

Completed The Committee concluded (12/8/82) concerning IE (MTG 831) that actions planned by I activities on IE are appropriate.

l check valve l failures. ....... ....... ......... ........................

l I b) Briefing AEOD/IE 2 52 (2432) Completed Recommendation was not i

l l l concerntag (8457) (MTG 832) required. Comments were

] l l rulemaking effered. The Committee J l ) activities suggested that the rule-I l regarding 10 CFR makang activities should l l 50.72, 10 CFR address coordination of l l 50.73, 10 CFR all reporting l l 50.55e and 10 requirements for power '

l l CFR 21. reactors and should I* i (LER & Immediate require no more than 3 i , l Notification reporting intervals.

l l l Rulemaking I A j....ctivities)

I ........ ....... ....... ......... ... ....................

g ............... ...............

l l 1 l tc) Continued review NRR 2 47 26466 Pending Returned to sponsor for l l 1 of the proposed additional work and

! l l l resolution of subsequent CRGR review, i

l l l USI A-43 l l Containment Sump l l Performance. l 1 l l Previously [

l t discussed at l Meeting 826.  ;

l I l >

l i l l

' l l 1 . l 1 I l

i i I I I l __ 1 l

~

e Page --19 of 45-- Summary of CRGR Activities

[ November 1981 through February 1984) Date 08-20-84 SPONSORING CRGR CRGR ALSO STATUS MEETING OFFICE CATEGORY ISSUE CRGR RECO M NDATION TOPIC TG EDO NUMBER NUMBER AT CRGR

  1. DATE MEETING AGENDA NUMBER

__ [ NOTICE) 271 12/8/82 al Briefine RES 2 49 ---

Pending Returned to sponsor for l(11/24/82)' concernIng the proposed additional work and Regulatory Guide subsequent CRGR review.

titled 1) The applicability of Instrument the RG needed confir-Sensing Lines. mation with NRR.

2) The RG should be held t pending an EDO l

decision concerning policy on RGS for CP

................... ............... ........ ....... ....... ......... .... applicants.

b) Review of a NRR 2 50 --- Completed Recommended approval major policy l issue - the with modifications.

proposed NRR Staff '

Plan for eval-

  • uating the Commission's i Safety Goal.

I 1

I i 1

I l

i I I I I I

Page --18 of 45-- Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984)

SPONSORING CRGR CRGR ALSO STATUS CRGR RECODMEleATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUDSER AT CRGR MEETING 8 DATE AGENDA NUMBER

__l INOTICE) 26 11/24/82 a) Review of a NRR 2 47 28&66 Pending The Committee decided to

) l(11/12/82)t major policy discuss USI A-43 at a subsequent meeting after

, issue - the proposed information on the l resolution of potential effects of l USI A-43 paint debris has been l-Containment received from NRR.

Emergency Sump i Performance.

b) Review of 'the NRR 2 48 --- Completed Recommended approval proposed after modifications.

revision (3) to i Regulatory Guide '

i i i 1.97 i l Instrumentation l for Light-Water-l Cooled Nuclear l Power Plants to

! Assess Plant and l Environt Conditions j

During and Following an

! Accident.

I t

I I

I I

I I I I I J

4 e

e Page -17 of 45-

  • Susunary of CRGR Activities Date 08-20-84 (Novent er 1931 t hrough February 1984)

SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR I MEETING l j 8 DATE AGENDA NUMBER

_,_ INOTICE) _

25 11/16/82 al Briefing RES 2 45 25.82 Completed Not required. Comunit t ee (10/22/42) concerning the 463 of f e red comunent s .

i proposed major revision of 10 CFR 20 Standards for Protection Against i Radiation.

___________________ _______. ______g _______g_______ _______ _________ ________________________

b) Briefing RES 2 46 66463 Completed Return to RES with concerning the suggestion that the rule proposed not be pursued.

I amendment to 10 .

I CFR 50 concerning radiation ALARA.

1 I

l 1

a i

l I

Page --16 of 45- . Summary of CRGR Activitiet Date 08-20-84 (November 1981 through February 1984)

SPONSORING CRGR CRGR ALSO ' STAT _S CRGR RECOpe9ENDATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR '

MEETING te DATE AGENDA NUMBER

__ [ NOTICE 1_t 241 11/3/82 al Review of a IE 2 42 --- Completed Recommended approval of

'(10/20/82) proposed IE general approach after Bulletin titled modifications.

Overeuposures in 11 Bulletin not needed.

PWR Reactor 2) IE should inform Cavities. licensees of MRC's intent to vigorously enforce regulations concerning overeuposures. l b) Review of a IE 2 43 (18) Completed Recommended approval I proposed IE (37) after modifications.

l Bulletin titled I Deficiencies in l Primary l Containment i Electeical l Penetration a s Assemblies.

I 1

)

c) Briefing RES 2 44 30 Completed Committee requested a concerning the 34,39 (MTG 842) subsequent briefing to RES proposal to &42 address questions raised address ATWS. by the Committee.

1 i

l I

o-Page --15 of 45 --

Summary of CRGR Activities Date 08-20-84 i (November 1981 through February 1984)

SPONSORING C2GR CRGR ALSO STATUS CRGR RECOD94ENDATION MEETING OFFICE CATEGORY ISSUE TO*IC TO EDO MUMBER NUMBER AT CRGR MEETING la DATE AGENDA NUMBER (NOTICE) l

__I

! 22 10/8/82 al IE requested IE 1 40 20&45 Completed Recommended approval (10/7/82) review of a (56) (31) after mod:lications.

I proposed IE Bulletin titled i Stress Corrosion i l Cracking in i Thick-Wall Large Diameter 1 Stainless Steel

! Recirculation

! System Piping at i BWR Plants.

I i i __._____________... _______._______ ________ __..... _______ ,__...___ _________________..___._

b) Continued CRGR NRR 2 39 20

  • Completed Recommended approval I review of the after modifications.

I issue of reactor coolant pump i trip criteria for PWRs.

discussed at Meeting 520.

23 10/28/82 Review of NRR 2 41 21438 Completed Recommended approval (10/14/82) alternatives for after modifications.

resolving Pressurized Thermal l Shock (PTS).

Previously I discussed at Meeting 521.

O Page 14 of --

45 - Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984)

SPONSORING CRGR CRGR ALSO STATUS CRGR RECOD94ENDATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR MEETING 8 DATE AGENDA NUMBER

__ (NOTICE) I l

! 19 9/15/82 l Review of the NRR 2 26 11 Completed Recommended approval l

.(8/30/82) Inadequate Core after modifications.

I Cooling The Committee reaffirmed Instrumentation its previous conclusions Design Study IMeeting 811) and made results. recommendations.

20 9/21/32 a) NRR requested l NRR 1 39 22 Completed Committee deferred 19/20/82) review of a IMTG 822) making recorsendat ion major policy until additional issue - the information concerning proposed pump run/ trip scenarios I resolution of had been developed by I the reactor the staff coolant pump trip issue.

b) IE requested IE 1 40 22&45 Completed Not required. Comments review of the (56) (31) (MTG 822) were offered.

j proposed actions and rough cost

! I estimates l associated with I resolution of the BWR pipe cracking issue.

21 10/6/82 (Review of a major NRR 2 41 23 Completed The Committee decided to (9/22/82) policy issue - MTG 823) continue review of this

! recommendations issue af ter cost / benefit concerning information was provided 1

Pressurized Thermal and near term flux Shock (PTS). reduction measures were considered by NRR.

I I I I I

e

  • 9 Page -13 of 45- -

Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984)

SPONSORING CRGR CRGR ALSO STATUS CRGR REC 0009ENDATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR I MEETING 8 DATE l AGENDA NUMBER I

l_l [ NOTICE) i 171 9/01/82 EDO requested ELD 2 36 ---

Completed Recommended approval (8/18/82) review of the after modifications. An lproposed rule and alternate proposed rule J policy statement should be forwarded to concerning the Commission.

backfitting.

18 9/9/82 la) Review of a IE 2 37 (24) Completed Recomunended approval.

(8/24/82) proposed IE (43) i i circular titled l Deficiencies I in Primary Containment Electrical Penetration Assemblies.

I g _____...___________ _______________ ___...__ __..___ _______ ______... ...__________.....______

b) Briefing RES 2 38 --- Completed Recomumended approval 8

concerning after modifications. The proposed Committee offered revision to 10 comunent s concerning t he CFR 140, proposed criteria and Criteria for an suggested that RES work

, l Extraordinary with NRR and ELD in

! l Nuclear I preparing the final rule i Occurrence. I change.

i i

l I

.I

i i

I Summary of CRGR Activities Date 08-20-84 Page 12 of 45--~~

(November 1981 through February 1984) 1

. l SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION l CATEGORY ISSUE TOPIC TO EDO j MEETING OFFICE NUMBER NUMBER AT CRGR

, MEETING I NUMSER 18 i DATE AGENDA l

__I INOTICE)

NRR 2 32 --- Completed Recommended approval.

!16 8/11/82 a) Review of a 17/23/82) major policy l issue - the I proposed l technical I resolution of l USI A-39 Safety l l Relief Valve l l Dynamic Loads _____.......... ......__ ....... ___..._ _____.... _________________.._____

l l ELD 2 33 --- Completed Recommended approval l bl Review of the after modifications.

! I proposed The EDO forward both the i i Regulatory Guide RG in final form and the I l concerning the related proposed rule 1 l l form of Nuclear modification to the i  ! Energy Liability Commission in a paper i i Policy for that calls attention to l Facilities. the potential for l protracted licensing i

i i i hearings.

I RES 2 34 --- Comple'ed Recommended approval c) Review of the after modifications.

i proposec final l rule concerning reporting of I i

l l changes to l .

l l Quality ,

I Assurance I Programs.

._____.____________ _____.____.____ ...__... ..__... ___.... F.____... __...._____.......______

l NMSS 2 35 40 Cogle t ed Recommendation was not I d) Review of the proposed insider (MTG 840) required. Comments were 1 offered.

l Rule, I

l 1 I I I I I i

4 1

Page -11 of 45-~

  • Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984)

I SPONSORING CRGR CRGR ALSO STATUS CRGR RECOD9EIR)ATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBEP. AT CRGR l MEETING 8 i DATE AGENDA NUMBER IMOTICE) 114 , 5/20/82 c) Briefing ADM 2 30 ---

Completed Recommendation was not 1  :(5/14/82) concerning the ( required. Comments were

! l l reporting and

  • offered.

I record keeping 1 EDO be briefed.

i requirements 2)) DEDROGR and ADM staff imposed by NRC. investigate further the burden and emplore possible i improvements.

I 115 7/7/82 IReview of a major NRR 2 31 S&7 Completed Recommended approval I (6/24/82) l policy issue - (14) after modifications.

lproposed guidance ifor Implementing Ithe Revised Rule I for Documenting Deviations from the Standard Review Plan.

I ie I

I I

I I I I

I I i' 1 I i l l 8 1

2

Page 10 of 45--

  • Summary of CRGR Activities Date 08-20-84 l --

(November 1981 through February 1984) l SPONSORING CRGR CRGR lALSO STATUS CRGR RECOMMENDATION i MEETING OFFICE CATEGORY ISSUE I TOPIC TO EDO t

i NUMBER NUPEER AT CRGR l

I l l MEETING l 18 i DATE AGENDA NUMBER

! l l l__l (NOTICEI i 1

131 5/12/82 EDO requested RES 1 28 --- Completed Recommended approtal after modifications, 1 (5/7/82) review of the proposed final rule j

4 concerning environ-mental qualifica-I tion of electrical

I equipmental.

I I

i i Completed Recommended approval.

114 5/20/82 laj Review of the RES 2 29 ---

1 (5/14/82) I proposed
l l revision to J l l l Regulatory Guide j i 1.145 l Atmospheric i l l Dispersion l, I l l Models for l l Potential l Accident i Consequence 4

Assessments at d

a Nuclear Power l l Plants.

l. I 6 g________________ ion ___ 2 25 10&11 Pending Returned to sponsor for j lb) Reconsiderat RES additional work. The
1 of the proposed

< l Regulatory Guide Committee decided to l titled postpone reconsideration l of the guide until after i Qualification i l and Acceptance interoffice coordination l Tests for has been completed.

{

l Snubbers Used in f' l l Systems j l l Important to

{' l Safety.

l l

1

I l

i

i i

1

. ~

Page --9 of 45~~ Summary of CRGR Activities Date 08-20-84 l (November 1981 through February 1984) i f SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION H MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO I NUMBER NUMBER AT CRGR j i l MEETING j 8 i DATE AGENDA NUMBER I

j l lNOTICEI

__I til 4/2/82 a) Review of the RES 2 25 1D&14 Pending The Committee requested

} l(3/19/821 proposed that further information 4

Regulatory Guide be provided to I titled reconsider the Guide at Qualification a future meeting, and Acceptance 3

Tests for Snubbers Used in Systems I Important to l Safety.

i i b) Briefing NRR 2 26 19 Completed The Committee requested I concernang a (MTG 819) that this topic be

! 1 I major polacy reviewed again after i i i issue - the receipt of further I status of TMI information from NRR.

l Action Plan.

l T:sk II.F.2 I I Instrumentation i for Detection of I Inadequate Core Cooling.

l l 12 4/29/82 IIE requested review IE 1 27 --- Completed Recommended approval l(4/26/82) lof a proposed IE after modifications, i Bulletin titled i Degradation of 1 Threaded Fasteners I

1 l in the Reactor

! l l Coolant Pressure I boundary of PWR I Plants

(

l 1

i 1 1 I

i

j Page -~8 of 45-- Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984)

I I SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION I MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO l NUMBER NUMBER AT CRGR l'

l MEETING la DATE I AGENDA NUMBER l

INOTICEI I

, 9 3/11/82 IIE requested review IE 1 11 --- Completed Recommended approval.

l (3/10/82) lof a proposed IE The proposed Bulletin j i IBulletin concernin; will be issued subject

, 1 Alteration of to IE verifying the list l l l Radiographs of of affected plants.

I Welds in Piping I ISubassemblies.

10 3/17/82 a) Review of a IE 2 22 11414 Completed Recommended approval i 13/11/821 proposed IE after modifications, circular Committee suggested that concerning Pipe 1) An Information Notice Snubbers, containing no requir-ements would be more ,

I appropriate and i 2) The systems having the highest rate of 4

l l snubber failures I I should be explicitly l l identified in the i i _____._________ ______._ _______ _______ ________.

notice.

, I l..._______ ._______

lb) Briefin ADM 2 23 ---

Completed Recommendation was not

concern no a required. Committee l major po1 Icy suggested certain issue - the modifications to the I I draft Regulatory procedures.

I Analysis l l Procedures.

g .....______________ _____________._ ___.__.. _______ _______ ...______ .. __.___.........__. __

I I lc) Briefing RES 2 24 ---

Completed Recommendation was not 1

I concerning required. Comments were research program offered. The committee to develop noted that it may from methodology for time-to-time request RES I value-impact assistance in this area.

essessments.

I i

1 e

l

~

l Page --7 of 45-- Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984) r l

l SPONSORING CRGR CRGR ALSO STATUS CRGR RECODMENDATION I MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO i

l -

NUMBER NUMBER AT CRGR l MEETING 18 DATE AGENDA NUMBER 4

l

! l INOTICE) i__

I 7 2/3/82 c) EDO requested NRR 2 14 S&15 Completed Recommend that rule not i 2/10/82 review of the (31) go forward.

11/29/82) proposed final I rule concerning i l Documentation of i

I Differences from l I the Standard Review Plan (SRP)

I I I j l l________..____.____ ....________.__ ________ ....... ..__... .._______ ___________ __...____...

1 I l i i id) Discussion with IE 2 9 3,445 Completed Recommended approval

I l NRR and IE after modifications.

i l 1 Office Directors j i 1 concerning '

j l l proposed

I l requirements for
I l l Emergency j i l Response i

l l Facilities.

1 i i I I 8 l 2/24/82 la) Briefing RES 2 20 --- Pending Returned to sponsor for j ll2/17/82) concerning the additional work and

! I I proposed Post CP resubmit t al f or CRGR I  ! Change Rule. consideration after I' l l staff work is l completed.

I l I l l b) Review of the RES 2 7 2 Completed Recommended that Reg Guide revision not be i I proposed l Revision (1) of issued.

Regulatory Guide 1.23, l Meteorological Measurement J, Program for I

l i Nuclear Power i l l Plants.

i l l l l l 4

i i

l

Page --6 of 45-- Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984) i CRGR CRGR ALSC STATUS CRGP RECOMMENDATION I SPONSORING MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO I AT CRGR NUMBER NUMBER MEETING l NUMBER sl DATE AGENDA l

l__ INOTICEI i 2 18 Completed Recommended approval 16 1/27/82 c) Review of the RES ---

after modifications.

I ll1/26/32) proposed Rule on l l Accreditation of l l Testing l l Laboratories for l l Equipment

! Qu ali f ic a t io n..

I _____ __ ..____. .______ _________ _______.._______..___...

g __________.__._____ ____ ____......

I Completed CRGR recommendation was I d) R. Bernero (RES) KES 2 17 ---

briefed the not required. Comments l were offered.

l Committee I concerning a I l standard table for Regulatory Guide '

f implementation.

17 2/3/82 m) Briefing NRR 2 18 --- Completed CRGR recommendation was concernang NRR not required. Committee I 2/10/82 l requested that NRR keep l(1/29/82) Prioritization of Safety CRGR informed concerning I NRR*s actions to incorp-Issues. orate prioritization t I into NRR plans for i dealing with the Generic I Safety Issues.

I ________ _______ _______ ..____... _______________________.

I I Comple t ed Committee recommendation b) Briefing NRR 2 19 ---

concernang a was not required.

major polacy Committee suggested that I NRR implement the i i issue - the NRR }'

procedures to control i procedures for I changes to the the retrofit of current

I STS on operating l l Standard Tech-i l l nical Specific- reactors licensed to l earlier STS.

l l ations ISTS).

' I l

l l

l l

i

e Page --5 ef 45-- Samwev of CRGR Activities Date 08-20-84 j (Nove>Scr 1981 through February 1984)

SPONSORING CRGR CRGR ! ALSO STATUS CRGR RECOD04ENDATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR w l MEETING S DATE I AGENDA NUMBER INOTICEI l 15 l 1/13/82 b) Continued IE 2 9 3,4&7 Completed 1) Based on CRGR l 1/21/82 discussion of IMTG 87) vuidance, the Staff i 1/22/82 meeting numbers Is to revise the f(12/21/81]l 3 and 4 Topic - proposed requirements l l Facilities, and i Eq uipme n t and 2) the revised require-h Procedures to ments were to be Cope with finalized by the 1

l ,

i Emergencies at CRGR, NRR and IE I l l Nuclear Power Office Directors.

l l Plants.

g l__________________. ___......__.... ________ _______ ____... ......... ._...___.___.. ____..___

l 1

, I tc) Briefing NRR 2 13 --- Completed CRGR recommendation was I i i concerning the not required. Comments l l Equipment were offered - Plan ,

I l Qualification needed better focus and l l Program. definition. Commit.ae I requested a copy of the

! Draft Program Plan concerning Equipment Qualification.

6 1/27/82 al Review of the NRR 2 14 7&15 Completed Based on NRR request, i' (1/26/82) proposed (31) IMTG 871 the subject review was revision to the postponed to a later i rule concerning date (MTG 87).

i documentation of j differences from i the standard review plan.

j ,

) b) EDO requested RES 2 15 --- Completed Recommended approval l l review of a after modifications.

! l l major policy 1) EDO ask NRR, IE and I

l l 1ssue - RIL-123 RES Directors to

{ l i Performance of resolve the issues l I l Electrical and report back j i l Terminal Blocks within 2 weeks.

I Exposed to a 2) EDO holdup the NRC l LOCA or Steam eply to Congressman

Environment. Udall on this matter i until the staff has resolved the matter.

i

Page --4 of 45-- Summary of CRGR Activities Date 08-20-84 (Ncvember 1981 through February 1984)

-l l l

SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUpWER AT CRGR l l l MEETING

) AGENDA NUMBER 18 i DATE I I l l I I I INOTICE1 1 71 1 IE Completed CRGR recommendation was 4 12/10/81 b) E. Jordan (IE) 2 10 ---

not required. Comments (12/7/81] briefed the were offered. Committee Committee I concerning IE requested that this l I plans to prepare matter be brought to tho l l a Commission Committee when the l l paper on proposed quality I l improving assurance requirements l l quality have been defined.

I assurance

' I procedures at i nuclear powe r i ________________...

plants.

g c) Briefing RES 2 11 --- Completed Recommended approval i after modifications.

1 concerning Committee requested that I major polacy i 8 issue - proposed RES inform the Committee i severe Accident of activities in this e Rulemaking and area.

I Associated Matters, 5 l 1/13/82 al Briefing RES 2 12 --- Campleted Recommended approval i 1/21/82 l concerntng a after modifications.

I i 1/22/82 l proposed l l(12/21/81) Revasion(3) of I l Regulatory Guide i 1.68,

, 1 Preoperational I l Test of Instru-ment and Control Air Systems. 1 I

I I I I I I

i

Summary of CRGR Activities Date 08-20-84 Page --3 of 45-- (November 1981 through February 1984)

I CRGR CRGR ALSO STATUS CRGR RECO M NDATION SPONSORING OFFICE CATEGORY ISSUE TOPIC TO EDO I MEETING AT CRGR NUMBER NUMBER I MEETING I I i NUMBER 18 i DATE I AGENDA I i l__l [NOTICEI I i AEOD 2 8 (2B&32) Coglet ed CRGR recommendation was 12 11/19/81 e) Briefing concernang the (52&57) IMTG 832) not reevired. Comments I (11/13/81) proposed 10 CFR were offered.

l l l Part 50.73, I l Licensee Event l l Report System.

11 13 l 12/3/81 luriefing of major IE 2 9 4.5&7 Cog leted 1) Immediate action is needed to clarify and Il11/25/81]lpolicy assue IMTG 87) 1 (concerning - coorc.nate i 1 requirements.

l l IFacilities. Equip- 2) Subsequent CRGR l l Iment and Procedures review pending l lto Cope with Emerg- additional staff i encies at Nuclear work.

Power Plants, ,

IE 2 9 3,5&7 Completed Program Offices should 4 1 12/10/81 a) Continued (MTG #7) comment on requirements l l[12/7/81) discussion of modi'ications proposed l l Meeting Number 3 by the staff.

l l topic of l

I Facilities,and Equipment l Procedures to l Cope with i Emergencies at i Nuclear Power l Plants.

1 I i 1 1I ii I

i 1

I I I I i

i

  • Page -2 of 45-- Summary of CRGR Activities Date 08-20-84 (November 1981 through February 1984) l l

l SPONSORING CRGR CRGR ALSO STATUS CRGR RECOMMENDATION l MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO l NUMBER NUMBER AT CRGR l MEETING

, is DATE AGENDA NUMBER I

INOTICEI I~l i l

, 12 l 11/19/81 al Review of major EDO 2 1 1 Completed Recommended approval of I

I l l(11/13/81) policy issue - (DEDROGR/CRGR) the charter and I I modifications to procedures as modified.

i I CRGR Charte r and Procedures as discussed at

__.U*.I1#"!_*.I

. ._.... _____......__.. ........ .....__ ....___ .._______l.......__._______.._____

i i

I lb) Review of the IE 2 5 ---

Pe ding Returned to sponsoring i proposed IE (A IM: office for additional i Bulletin, titled IE work. Subsequent CRGR j i Generic Problems A .f 3 review wt additional i Associated with i

l Elastomers used WrefffT Z-information from IE.

is received l in ASCO NP-1 '

I i valves.

I I

I _______... ____. __ .............__ _____... _______ .... __ .....___. ..___... ___............

I I I l c) Discussion of RES 2 6 ---

Completed Recommendation was not i I major policy required. CRGR comments l l l issue concerning were offered - CRGR I l 4 requirements I review of this type of ,

I l l placed on OL RES activity was not i l l and cps by RES. appropriate where cps l l l and OLs voluntarily i I participate.

g l ..___.... ______... ..___..._______ ........ __._.__ .....__ ..___.... .........._.......__..__

l i I i

i l id) Review of the RES 2 7 8 licog leted Returned to sponsoring l proposed IMTG 88) office for additional i l I

revision (1) to RG 1.23

'I work. Subsequent CRGR MeteoroIogical l review after additional l informaticA Was received Measurement 1 from RES. .

I Programs For t i I Nuclear Power i i l Plants. 1 I

I I

L

2 O

Page ~~1 of 45-- Summary of CRGR Activities Date 08-20-84 -

(Nevember 1981 through February 1984) .

I SPONSORING CRGR CRGR ALSO STATUS CRGR RECOD94ENDATION MEETING OFFICE CATEGORY ISSUE TOPIC TO EDO NUMBER NUMBER AT CRGR I MEETING is DATE l AGENDA NUMBER I

,I __[ NOTICE) l 1. 11/12/31 a) Review of major EDO 2 1 2 Cogleted Charter and Procedures I (11/10/81)I policy issue - (DEDROGR/CRGR) (MTG R2l should be modified.

CRGR Charter and Procedures.

l .____......._______ ._____..__ __.. __._____ .....__ .._____ _________ ______.._________.....__

i i b) Briefing EDO 2 2 2 Completed CRGR recommendation was concerning the (DEDROGR/CRGR) not required. Comments Survey of were orfered.

Mechanisms used to Communicate l l with Licensees &

I Proposed Methods I for Controlling Communications with Licensees.

I cl Briefing NRR 2 3 ---

Completed CROR recommendation was I l concernang the not required. Comments i i status of were offered.

l l l Implementation i i l of Actica Plan l l Items, NUREG

) 1 0737.

di Briefing ADM 2 4 --- ' Complated CRGR recommendation was I concerning OMB not reevired. Comments clearances for were offered. Proposed

, reporting and new generic requirements I record keeping should include for CRGR requirements review the information under Paper Work needed for OMS l Reduction Act. clearance.

I I