Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214L190 + (ML20214L190)
- ML20214L192 + (ML20214L192)
- ML20214L193 + (ML20214L193)
- ML20214L195 + (ML20214L195)
- ML20214L196 + (ML20214L196)
- ML20214L199 + (ML20214L199)
- ML20214L201 + (ML20214L201)
- ML20214L202 + (ML20214L202)
- ML20214L204 + (ML20214L204)
- ML20214L207 + (ML20214L207)
- IR 05000312/1986028 + (ML20214L209)
- ML20214L210 + (ML20214L210)
- ML20214L213 + (ML20214L213)
- W3P86-1959, Forwards Response to 860723 Request for Suppl Info Re Util Program to Address IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures.... Program Implemented by motor-operated Valve Working Group.Final Rept by 880115 + (ML20214L215)
- IA-86-551, Final Response to FOIA Request Re Facility Dryer.Forwards Documents Listed in App.Documents Also Available in PDR + (ML20214L218)
- ML20214L218 + (ML20214L218)
- ML20214L220 + (ML20214L220)
- ML20214L224 + (ML20214L224)
- ML20214L225 + (ML20214L225)
- IR 05000382/1986005 + (ML20214L227)
- B12222, Application for Amend to License NPF-49,changing Tech Spec Section 6.5.3.2 Re Quorum Required to Conduct Meeting of Unit 3 Nuclear Review Board to Make Quorum Consistent W/ Units 1 & 2.Fee Paid + (ML20214L228)
- ML20214L232 + (ML20214L232)
- ML20214L236 + (ML20214L236)
- ML20214L237 + (ML20214L237)
- PY-CEI-NRR-0560, Requests 2-wk Extension for Submittal of Security Plan Amends Required by 10CFR73.55.Addl Time Needed to Complete Engineering Evaluations + (ML20214L241)
- ML20214L242 + (ML20214L242)
- ML20214L243 + (ML20214L243)
- ML20214L245 + (ML20214L245)
- SNRC-1338, Forwards Checklist for Plant-Specific Review of Alternate Rod Injection Sys (Ari), to Document Plant Compliance W/ 10CFR50.62(c)(3).To Eliminate Potential Delay in ARI Operation,Power for Trip Logic Changed + (ML20214L246)
- ML20214L248 + (ML20214L248)
- ML20214L251 + (ML20214L251)
- ML20214L253 + (ML20214L253)
- ML20214L254 + (ML20214L254)
- ML20214L256 + (ML20214L256)
- ML20214L258 + (ML20214L258)
- ML20214L261 + (ML20214L261)
- 05000461/LER-1987-024, :on 870501,RWCU Sys Automatically Isolated Two Times Due to High Differential Flow Signal.Caused by Flow Perturbations Compounded by Error in Circuitry & Personnel Error.Sys Stabilized & Returned to Svc + (ML20214L265)
- 05000373/LER-1986-034, :on 860807,automatic Start of Diesel Generator 1B Occurred.Caused by Spurious Actuation of Protection Logic Relay.Relay Replaced + (ML20214L266)
- ML20214L268 + (ML20214L268)
- ML20214L270 + (ML20214L270)
- 05000413/LER-1986-041, :on 860801,reactor Bldg Fire Detection Zones Surveillance Test Not Performed for More than 24 H from 860615-19.Cause Under Investigation.Final Rept Expected by 860926 + (ML20214L271)
- ML20214L273 + (ML20214L273)
- ML20214L274 + (ML20214L274)
- 05000348/LER-1986-015, :on 860805,reactor Trip & Subsequent Main Steam Line Isolation Occurred.Caused by Reduction in Feedwater Flow to Steam Generator 1C Due to Failed Printed Circuit Card.Card Replaced + (ML20214L277)
- ML20214L278 + (ML20214L278)
- ML20214L279 + (ML20214L279)
- ML20214L281 + (ML20214L281)
- ML20214L283 + (ML20214L283)
- ML20214L286 + (ML20214L286)
- ML20214L287 + (ML20214L287)
- 05000529/LER-1986-021-01, :on 860806,discovered That Train B LPSI Pump Header Discharge Throttle Valve Not Adjusted to Proper Setting.Caused by Personnel Error on 860717 Due to Unclear Procedure.Separate Procedures in Effect + (ML20214L290)