Exam Rept 50-295/OL-86-05 on 860902.Exam Results:Both Candidates Passed
ML20214L201
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 09/03/1986
From: Burdick T, Higgins R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20214L197 List:
References
50-295-OL-86-05, 50-295-OL-86-5, NUDOCS 8609090519
Download: ML20214L201 (2)


Text

<

U.S. NUCLEAR REGULATORY COMMISSION REGION III Report No. 50-295/0L-86-05 Docket Nos. 50-295 and 50-304 License Nos. DPR-39 and DPR-48 Licensee: Conmonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name: Zion Generating Station Examination Administered At: Westinghouse Nuclear Training Reactor Zion, Illinois Examinction Conducted: September 2, 1986 Examiner:

fW afus R. L. Higgin 3/8[

Date T/)l l lll .l.

,II Approved By: . M. Burdick, Chief Operator Licensing Section Date Examination Summary Examination administered on September 2, 1986 (Report No. 50-295/0L-86-05)

Simulator examinations were administered to two senior reactor operator candidates.

Results: Both candidates passed.

\

8609090519 860904 PDR ADOCK 05000295 V PDR

c REPORT DETAILS

1. Examiners
  • R. L. Higgins T. M. Burdick
  • Chief Examiner
2. Examination Reviev Meeting None conducted. No written examination was administered.
3. Exit Meeting At the conclusion of the simulator examinations, the examiners met with Mark Carnahan and Ray Landrum, representatives of the Zion Training Department, to discuss generic observations made during the exaninations.

The following issues were discussed:

a. During one Anticipated Transient Without Scram (ATWOS), an examinee functioning as the Balance of Plant Operator did not attempt to manually scram the reactor. Though this requirement is not specifically mentioned in Zion's ATWOS procedure, FR-S.1, both Zion Training Departnent representatives stated that it was understood by the operators, and implied in the procedut e, that an attempt to manually scram the reactor should be mcde both at the reactor and turbine panels. Procedure FR-5.1 should be revised to specifically require that an attempt to manually scram the reactor be made, both at the reactor and turbine panels, in case of an ATWOS.

1

b. Communication between the Senior Reactor Operator and the Shift

[

Engineer, NRC, and Load Dispatcher during abnormalities was poor.

c. The examinees never checked annunciator response during shift change.

l l