Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-4826, Responds to NRC Re Violations & Deviations Noted in Insp Repts 50-445/85-16 & 50-446/85-13.Corrective Actions:Design Change Authorization 13,349 Rereviewed & Results Documented in Calculations SRB-128C,Set 2,Rev 10 + (ML20214J560)
- ML20214J561 + (ML20214J561)
- ML20214J562 + (ML20214J562)
- ML20214J564 + (ML20214J564)
- ML20214J565 + (ML20214J565)
- RBG-25974, Special Rept Re Measured Settlement Value Outside Tech Spec 3.7.10-1 Limits.Probably Caused by Effects of Const Schedule on Structural Settlement.Calculation Revised to Account for Differences in Const Schedule + (ML20214J566)
- 05000528/LER-1986-047, :on 860712,reactor Tripped at 100% Power on Low Reactor Coolant Flow Signal in Steam Generator 2.Caused by 860522 Reduction in Trip Setpoints for Low Reactor Flow. New Trip Setpoints Being Evaluated + (ML20214J567)
- ML20214J568 + (ML20214J568)
- ML20214J569 + (ML20214J569)
- 05000293/LER-1986-018, :on 860629,GE Akf Model 25 Field Breaker Failed to Trip Automatically.Similar Events Occurred on 830213, 850209 & 0315.Util Investigating for Cause.Corrective Actions Will Be Completed Prior to Startup + (ML20214J570)
- ML20214J571 + (ML20214J571)
- ML20214J572 + (ML20214J572)
- 05000454/LER-1986-029-03, :on 861022,480-volt Breaker,Providing Overcurrent Protection for Electrical Penetration Feed to Containment Crane 1HC22G,discovered Not Tested Prior to Entry Into Mode 4.Caused by Personnel Error + (ML20214J573)
- AECM-87-0079, Forwards Current Certificate of Coverage by Nuclear Mutual Ltd & Corrected Ani/Maelu & Nuclear Electric Insurance Ltd Certificate + (ML20214J574)
- ML20214J576 + (ML20214J576)
- ML20214J577 + (ML20214J577)
- ML20214J580 + (ML20214J580)
- TXX-6465, Advises of Delays in Field Verification Activities for Identification of Raceway Sleeves,Per Util 870506 Response to Violations Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Verification Will Be Completed by 870626 + (ML20214J584)
- IR 015000015/1986001 + (ML20214J586)
- ML20214J587 + (ML20214J587)
- ML20214J588 + (ML20214J588)
- ST-HL-AE-1812, Informs of Util Actions in Response to Complaint by Former QC Inspector for Ebasco Re Employee Termination Following Positive Test for Illegal Drugs.Util Investigation Will Be Conducted Shortly.Related Correspondence + (ML20214J589)
- ML20214J593 + (ML20214J593)
- ML20214J595 + (ML20214J595)
- ML20214J596 + (ML20214J596)
- ML20214J597 + (ML20214J597)
- ML20214J598 + (ML20214J598)
- ST-HL-AE-1819, Forwards Revs to Emergency Planning Procedures.W/O Encl. Related Correspondence + (ML20214J599)
- ML20214J600 + (ML20214J600)
- ML20214J603 + (ML20214J603)
- ML20214J605 + (ML20214J605)
- ML20214J606 + (ML20214J606)
- ML20214J607 + (ML20214J607)
- ML20214J609 + (ML20214J609)
- ML20214J611 + (ML20214J611)
- ML20214J614 + (ML20214J614)
- ML20214J620 + (ML20214J620)
- ML20214J622 + (ML20214J622)
- ML20214J624 + (ML20214J624)
- ML20214J626 + (ML20214J626)
- ML20214J628 + (ML20214J628)
- IR 05000285/1986008 + (ML20214J630)
- ML20214J632 + (ML20214J632)
- ML20214J637 + (ML20214J637)
- ML20214J638 + (ML20214J638)
- ML20214J639 + (ML20214J639)
- IR 05000313/1986013 + (ML20214J640)
- B12293, Forwards Reviews for Isap Topics 1.06, Wind & Tornado Loadings/Tornado Missiles & 1.31, Pipe Break Outside Containment, Per 850517 Commitment + (ML20214J644)
- 05000316/LER-1986-021, :on 860707,during Troubleshooting of source- Range Nuclear Instrument N-32,spike on ESF Signal Occurred. Procedures Revised to Permit Bypassing Reactor Trip Function During Troubleshooting + (ML20214J646)
- ST-HL-AE-2188, Interim Deficiency Rept Re Leaking Main Steam Power Operated Relief Valve Switches.Initially Reported on 870323.Affected Unit 1 Switches Replaced W/Corresponding Unit 2 PORV Components.Next Rept Will Be Submitted by 870603 + (ML20214J648)
- GO2-86-697, Informs That Commitment to Upgrade 1 H Cable Tray Fire Barrier Installation for Safe Shutdown Equipment Cables to 3 H Fire Barrier Capability by Jul 1986 Delayed Until 860825 + (ML20214J649)