Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214J526 + (ML20214J526)
- ML20214J528 + (ML20214J528)
- ML20214J529 + (ML20214J529)
- ML20214J530 + (ML20214J530)
- ML20214J531 + (ML20214J531)
- ML20214J532 + (ML20214J532)
- ML20214J534 + (ML20214J534)
- ML20214J535 + (ML20214J535)
- ML20214J536 + (ML20214J536)
- ML20214J537 + (ML20214J537)
- ML20214J538 + (ML20214J538)
- ML20214J539 + (ML20214J539)
- ML20214J542 + (ML20214J542)
- PNO-II-87-029, on 870516,unit Tripped on Low Reactor Coolant Flow Rate in Loop A.Caused by Partial Closure of Hot Loop Isolation Valve.Outage of 12 Days Planned to Correct Problem.Resident Inspector Will Provide Followup + (ML20214J543)
- ML20214J545 + (ML20214J545)
- ML20214J548 + (ML20214J548)
- ML20214J549 + (ML20214J549)
- ML20214J551 + (ML20214J551)
- ML20214J552 + (ML20214J552)
- ML20214J553 + (ML20214J553)
- ML20214J556 + (ML20214J556)
- ML20214J557 + (ML20214J557)
- ML20214J558 + (ML20214J558)
- ST-HL-AE-1817, Forwards marked-up FSAR Pages 3.10N-7 Through 3.10N-9 & Question/Response 032.5 Re Equipment Qualification.Revs Will Be Incorporated Into Future FSAR Amend.Related Correspondence + (ML20214J559)
- TXX-4826, Responds to NRC Re Violations & Deviations Noted in Insp Repts 50-445/85-16 & 50-446/85-13.Corrective Actions:Design Change Authorization 13,349 Rereviewed & Results Documented in Calculations SRB-128C,Set 2,Rev 10 + (ML20214J560)
- ML20214J561 + (ML20214J561)
- ML20214J562 + (ML20214J562)
- ML20214J564 + (ML20214J564)
- ML20214J565 + (ML20214J565)
- RBG-25974, Special Rept Re Measured Settlement Value Outside Tech Spec 3.7.10-1 Limits.Probably Caused by Effects of Const Schedule on Structural Settlement.Calculation Revised to Account for Differences in Const Schedule + (ML20214J566)
- 05000528/LER-1986-047, :on 860712,reactor Tripped at 100% Power on Low Reactor Coolant Flow Signal in Steam Generator 2.Caused by 860522 Reduction in Trip Setpoints for Low Reactor Flow. New Trip Setpoints Being Evaluated + (ML20214J567)
- ML20214J568 + (ML20214J568)
- ML20214J569 + (ML20214J569)
- 05000293/LER-1986-018, :on 860629,GE Akf Model 25 Field Breaker Failed to Trip Automatically.Similar Events Occurred on 830213, 850209 & 0315.Util Investigating for Cause.Corrective Actions Will Be Completed Prior to Startup + (ML20214J570)
- ML20214J571 + (ML20214J571)
- ML20214J572 + (ML20214J572)
- 05000454/LER-1986-029-03, :on 861022,480-volt Breaker,Providing Overcurrent Protection for Electrical Penetration Feed to Containment Crane 1HC22G,discovered Not Tested Prior to Entry Into Mode 4.Caused by Personnel Error + (ML20214J573)
- AECM-87-0079, Forwards Current Certificate of Coverage by Nuclear Mutual Ltd & Corrected Ani/Maelu & Nuclear Electric Insurance Ltd Certificate + (ML20214J574)
- ML20214J576 + (ML20214J576)
- ML20214J577 + (ML20214J577)
- ML20214J580 + (ML20214J580)
- TXX-6465, Advises of Delays in Field Verification Activities for Identification of Raceway Sleeves,Per Util 870506 Response to Violations Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Verification Will Be Completed by 870626 + (ML20214J584)
- IR 015000015/1986001 + (ML20214J586)
- ML20214J587 + (ML20214J587)
- ML20214J588 + (ML20214J588)
- ST-HL-AE-1812, Informs of Util Actions in Response to Complaint by Former QC Inspector for Ebasco Re Employee Termination Following Positive Test for Illegal Drugs.Util Investigation Will Be Conducted Shortly.Related Correspondence + (ML20214J589)
- ML20214J593 + (ML20214J593)
- ML20214J595 + (ML20214J595)
- ML20214J596 + (ML20214J596)
- ML20214J597 + (ML20214J597)
- ML20214J598 + (ML20214J598)