Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214F698 + (ML20214F698)
- ML20214F699 + (ML20214F699)
- ML20214F706 + (ML20214F706)
- ML20214F710 + (ML20214F710)
- ML20214F711 + (ML20214F711)
- IR 05000413/1986041 + (ML20214F716)
- ML20214F717 + (ML20214F717)
- IR 05000498/1986022 + (ML20214F722)
- ML20214F728 + (ML20214F728)
- ML20214F729 + (ML20214F729)
- ML20214F730 + (ML20214F730)
- ML20214F736 + (ML20214F736)
- ML20214F739 + (ML20214F739)
- ML20214F742 + (ML20214F742)
- ML20214F745 + (ML20214F745)
- ML20214F748 + (ML20214F748)
- 2CAN118605, Application for Amend to License NPF-6,revising Tech Specs to Incorporate Conforming Changes to Reporting Requirements of 10CFR50.72 & 73,per Generic Ltr 83-43 + (ML20214F749)
- ML20214F753 + (ML20214F753)
- ML20214F755 + (ML20214F755)
- ML20214F757 + (ML20214F757)
- ML20214F758 + (ML20214F758)
- ML20214F766 + (ML20214F766)
- ML20214F770 + (ML20214F770)
- 05000245/LER-1986-028, :on 861203,3 of 4 Pressure Switches Failed to Meet Tech Spec Setpoint Requirements.Caused by Inherent Problems W/Bourdon Tube Pressure Switches.Setpoint Change Request Generated & Switch Reset + (ML20214F773)
- ML20214F774 + (ML20214F774)
- ML20214F775 + (ML20214F775)
- ML20214F783 + (ML20214F783)
- ML20214F785 + (ML20214F785)
- IR 05000346/1987010 + (ML20214F787)
- ML20214F788 + (ML20214F788)
- ML20214F791 + (ML20214F791)
- ML20214F797 + (ML20214F797)
- IR 05000341/1986031 + (ML20214F799)
- ML20214F801 + (ML20214F801)
- ML20214F802 + (ML20214F802)
- ML20214F803 + (ML20214F803)
- ML20214F805 + (ML20214F805)
- ML20214F811 + (ML20214F811)
- ML20214F817 + (ML20214F817)
- ML20214F818 + (ML20214F818)
- IR 05000354/1986045 + (ML20214F821)
- ML20214F822 + (ML20214F822)
- PNO-IV-87-027, on 870518,reactor Shut Down Due to High Conductivity in Reactor Coolant Due to Condenser Tube Leaks. Shut Down Expected to Exceed 48 H + (ML20214F823)
- ML20214F826 + (ML20214F826)
- TXX-6092, Final Deficiency Rept CP-86-61 Re Restraints for Polar Crane Rail Found Broken.Initially Reported on 860904.Issue Not Reportable Per 10CFR50.55(e) + (ML20214F827)
- ML20214F831 + (ML20214F831)
- ML20214F833 + (ML20214F833)
- ML20214F834 + (ML20214F834)
- U-600771, Forwards Final Preservice Exam of Class 1,2 & 3 Component Supports at Clinton Power Station,Unit 1. Preservice Exam Program Relief Requests Not Included Since All Required Relief Requests Have Been Granted in Ssers 5 & 6 + (ML20214F835)
- ML20214F836 + (ML20214F836)
- ML20214F839 + (ML20214F839)