Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-II-86-005, on 860111,plant Swtichboard Operator Received off-site Call from Unidentified Male,Stating That There Was Bomb in Power Block Set to Go Off at Noon.Caller Stated He Had on Bomb.Search for Bomb Proved Negative + (ML20212E839)
- ML20212E840 + (ML20212E840)
- ML20212E843 + (ML20212E843)
- ML20212E844 + (ML20212E844)
- ML20212E846 + (ML20212E846)
- ML20212E847 + (ML20212E847)
- LIC-99-0088, Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls + (ML20212E850)
- 05000250/LER-1987-007, :on 870128,requirements of Tech Specs 3.7.1d for Fuel Oil Storage Tank for Emergency Diesel Generators Not Met.Caused by Fuel Storage Tank Exceeding Criteria for Water & Sediment + (ML20212E851)
- 05000458/LER-1997-007-02, :on 970926,discovered Cracked EDG Valve Adjusting Screw Assembly Swivel Pads (Vasasps).Caused by Mfg Defect.Replaced Vasasps in EDGs W/New Components & Returned Defective Vasasps to Vendor for Analysis + (ML20212E852)
- ML20212E854 + (ML20212E854)
- B17867, Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports + (ML20212E855)
- PNO-III-86-030, on 860325,while Conducting Hft,Two Main Steam Line Pipe Supports in Steam Tunnel Failed as Result of Apparent Water Hammer.State of Il Notified + (ML20212E857)
- BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested + (ML20212E860)
- ML20212E863 + (ML20212E863)
- ML20212E865 + (ML20212E865)
- ML20212E866 + (ML20212E866)
- PNO-III-86-027, on 860317,Region III Received News Media Inquiries About Leaking Shipment of Radioactive Matls Which Was Stopped by Local Authorities in Tuscola County, Michigan.No Evidence of Leaking Radioactivity Found + (ML20212E867)
- 05000409/LER-1986-023, :on 860719,loss of Offsite Power Occurred. Caused by Lightning Strike at Adjacent Coal Plant Auxiliary Switchyard.Offsite Power Restored After 12 Minutes + (ML20212E868)
- ML20212E871 + (ML20212E871)
- 05000409/LER-1986-020, :on 860708,reactor Scrammed When Scram Solenoid on CRD 12 Failed.Caused by Either Random Solenoid Failure or Water Intrusion.Spare CRD Installed + (ML20212E872)
- ML20212E873 + (ML20212E873)
- ML20212E874 + (ML20212E874)
- ML20212E875 + (ML20212E875)
- 05000327/LER-1987-008, :on 870126,determined Surveillance Instruction Re ERCW Valves Servicing safety-related Equipment Did Not Ensure Compliance W/Tech Spec Surveillance Requirement. Caused by Personnel Error.Instruction Revised + (ML20212E877)
- ST-HL-AE-5777, Informs That Plant Currently in Process of Transitioning to STP Nuclear Operating Co (STPNOC) as Documented in NRC Order and Util to Nrc.Delay of Submittal of Operations QA Plan Revs Associated W/Stpnoc Appropriate + (ML20212E878)
- IR 05000456/1986066 + (ML20212E879)
- ML20212E881 + (ML20212E881)
- PNO-III-86-062, on 860627,while Operating at 68% Power, Lightening Strike Caused Unit to Automatically Trip.Shutdown Was Due to Failure of Some Primary Sys Instruments,Causing Reactor Protection Sys to Trip Unit.State of Il Notified + (ML20212E882)
- ML20212E885 + (ML20212E885)
- ML20212E886 + (ML20212E886)
- 05000382/LER-1999-013, :on 990825,exceeding TS Limits for RCS Cooldown Rate Was Discovered.Caused by Inadequate Content & Inadequate Implementation of TS Requirements.Page 2 of 2 in Attachment 2 of Incoming Submittal Not Included + (ML20212E887)
- ML20212E888 + (ML20212E888)
- ML20212E889 + (ML20212E889)
- ML20212E890 + (ML20212E890)
- ML20212E892 + (ML20212E892)
- PNO-III-86-144A, on 861212,Sixth Circuit Court of Appeals in Cincinnati Denied State of Ohio Request to Stay Commission 861121 Decision Authorizing Restart of Davis-Besse.Licensee Expects Startup of Reactor During Wk of 971214 + (ML20212E893)
- ML20212E895 + (ML20212E895)
- 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) + (ML20212E897)
- ML20212E898 + (ML20212E898)
- ML20212E900 + (ML20212E900)
- ML20212E902 + (ML20212E902)
- ML20212E903 + (ML20212E903)
- ML20212E904 + (ML20212E904)
- ML20212E905 + (ML20212E905)
- 05000317/LER-1987-004, :on 870302,unit Manually Tripped Due to High Pressurizer Pressure from Turbine Runback.Caused by Improper Procedural Guidance to Reducing Main Generator Hydrogen Pressure.Procedures Revised + (ML20212E907)
- ML20212E909 + (ML20212E909)
- ML20212E910 + (ML20212E910)
- U-600831, Advises of Completion of Deferred Testing for Initial Criticality & Heatup Project Milestones.Test Results Reviews Complete & Satisfactory + (ML20212E911)
- ML20212E912 + (ML20212E912)
- 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER + (ML20212E914)
- HL-5505, Submits 30-day Response to GL 97-04 Re Issues Which May Have Generic Implications to ECCS & Chrs.Info Requested Will Be Provided by 980105 + (ML20212E915)