ML20212E854

From kanterella
Jump to navigation Jump to search
Forwards Safeguards Insp Rept 50-456/86-66 on 861211.No Violations Noted
ML20212E854
Person / Time
Site: Braidwood 
Issue date: 12/19/1986
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20212E859 List:
References
NUDOCS 8701050488
Download: ML20212E854 (2)


See also: IR 05000456/1986066

Text

,

TMG

re g >M-- g

c

r r- - . . g n %

IJU \\ V

vru LU UiliW Q

_

vn

DEC t 91986

.

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special safeguards inspection conducted by Mr. J. R. Kniceley

of this office on December 11, 1986, of activities at Braidwood Nuclear Power

Station, Unit I authorized by NRC Operating License No. NPF-59 and to the

discussion of our findings with Mr. C. W. Schroeder at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Part 73, Title 10, Code of Federal Regulations,

Section 73.21(c)(2).

This information must be handled and protected in

accordance with the provisions of 10 CFR 73.21. Consequently, our report of

this inspection will not be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

06121 56

W. L.

xe

, Chief

~

e 01050

oS00hDR

-

Nuclear Materials Safety

pOk

9

P R

and Safeguards Branch

g

Enclosure:

Inspection Report

No. 50-456/86066(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

See Attached Distribution

RIII

RIII

RIT TA

RII

,

p4

g

Enclosure contains

SAFEGUARDS IllF00!ATION

'

K'n't

ley /ims

ed

Litt e

A

son

Upon separation this

b

page is Occontrolled

S#iGUAMST0WA70X

.

-

-

- -

-

_.

-

.

.

._-

,

,

Commonwealth Edison Company

2

INUC 1 9 1986

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

'

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

IE File

IE/DI/0RPB

IE/ES

,

NMSS/SGPL

NRR/PWR-B/SSPB

cc w/ enclosure, w/o

UNCLASSIFIED SAFEGUARDS

I

INFORMATION:

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

-General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

J. Moore, OGC

G. Berry, 0GC

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

Enclosure contains

SAFEGUARDS INFORMATION

Upon separation this

page is Pecentrolled

. - _ _ . . _ - _ - -

. . -

. -

-

_-

- .

- _ _ , . -

- - - - -

_

_