Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212B991 + (ML20212B991)
- ML20212B992 + (ML20212B992)
- ML20212B994 + (ML20212B994)
- ML20212B996 + (ML20212B996)
- ML20212B999 + (ML20212B999)
- ML20212C000 + (ML20212C000)
- PNO-III-86-150, on 861218,licensee Entered Mode 4 from Mode 3 to Investigate 861215 Failure of MSIV to Close Per Tech Specs.Leak in Pressurizer Level Sensing Line Isolation Valve Will Be Repaired.Investigation Continuing + (ML20212C001)
- ML20212C003 + (ML20212C003)
- NRC-99-0080, Comment Opposing Proposed Rule 10CFR50 Re Consideration of Potassium Iodide in Emergency Plans.Detroit Edison Strongly Urges NRC to Not Issue Amend to 10CFR50.47 + (ML20212C004)
- IR 05000213/1986030 + (ML20212C005)
- ML20212C006 + (ML20212C006)
- ML20212C007 + (ML20212C007)
- ML20212C009 + (ML20212C009)
- ML20212C013 + (ML20212C013)
- IR 05000348/1999005 + (ML20212C014)
- ML20212C016 + (ML20212C016)
- IR 05000333/1986021 + (ML20212C020)
- ML20212C021 + (ML20212C021)
- LIC-97-0172, Submits Comments on Technical Review of Draft Info Notice Re Extraction Steam Pipe Rupture at Plant + (ML20212C022)
- ML20212C023 + (ML20212C023)
- ML20212C026 + (ML20212C026)
- ML20212C027 + (ML20212C027)
- ML20212C028 + (ML20212C028)
- ML20212C030 + (ML20212C030)
- ML20212C032 + (ML20212C032)
- ML20212C033 + (ML20212C033)
- ML20212C038 + (ML20212C038)
- IR 05000346/1986031 + (ML20212C039)
- IA-85-187, Partially Withheld Anonymous Allegation Re Proposed Enforcement Action - Grand Gulf Nuclear Station + (ML20212C040)
- ML20212C040 + (ML20212C040)
- 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief + (ML20212C041)
- ML20212C045 + (ML20212C045)
- ML20212C046 + (ML20212C046)
- 05000482/LER-1999-009, :on 990811,discovered That Inadequate Fire Separation Could Result in Loss of Charging Water Capability.Caused by Several Unvalidated Engineering Judgements Re Safe Shutdown Equipment.Revised Procedures + (ML20212C048)
- ML20212C049 + (ML20212C049)
- ML20212C051 + (ML20212C051)
- ML20212C052 + (ML20212C052)
- ML20212C053 + (ML20212C053)
- ML20212C055 + (ML20212C055)
- ML20212C056 + (ML20212C056)
- IR 05000272/1987002 + (ML20212C057)
- ML20212C059 + (ML20212C059)
- ML20212C060 + (ML20212C060)
- ML20212C061 + (ML20212C061)
- ML20212C063 + (ML20212C063)
- BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With + (ML20212C065)
- ML20212C066 + (ML20212C066)
- 3F0999-07, Application for Amend to License DPR-72,to Change ITS Proposed in LAR 239,rev 0,increasing Licensed Capacity for Spent Fuel Assembly Storage in SFP & Revise Configuration for Storage of Fresh Fuel.Proprietary Encl Withheld + (ML20212C068)
- ML20212C072 + (ML20212C072)
- ML20212C076 + (ML20212C076)
- ML20212C081 + (ML20212C081)