Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211Q056 + (ML20211Q056)
- 3F0287-21, Ro:On 870112,6-month Interval for Containment Air Lock Type B Tests Found Exceeded Due to Inconsistencies Between Tech Specs & App J.Caused by Failure to Recognize Dual Sources of Requirements.Test Schedule Revised & Tech Spec Changed + (ML20211Q057)
- ML20211Q059 + (ML20211Q059)
- ML20211Q061 + (ML20211Q061)
- IR 05000267/1986022 + (ML20211Q063)
- IA-86-478, Responds to FOIA Request for Documentation Re Meetings Held Between NRC & Ieee.Nrc Has No Records Subj to Request.Member of NRR Attended Meetings of IEEE Subcommittee 3.3 on Listed Dates in Listed Locations + (ML20211Q065)
- ML20211Q065 + (ML20211Q065)
- ML20211Q068 + (ML20211Q068)
- ML20211Q070 + (ML20211Q070)
- 05000302/LER-1987-004, :on 870124,while at 75% Power,Gaseous Radioactive Release Made W/O Performing Flow Instrument Channel Check.Caused by Personnel Error.Procedure for Performing Gaseous Releases Revised + (ML20211Q072)
- 05000237/LER-1986-024-04, :on 861117,main Chimney Separate Particulate Iodine & Noble Gas Sampler (Sping) Experienced Loss of Flow Condition.Caused by Water in Filters of Sping.Work Request D59639 Initiated + (ML20211Q073)
- ML20211Q074 + (ML20211Q074)
- ML20211Q075 + (ML20211Q075)
- ML20211Q076 + (ML20211Q076)
- IR 05000412/1986039 + (ML20211Q077)
- ML20211Q081 + (ML20211Q081)
- ML20211Q086 + (ML20211Q086)
- ML20211Q087 + (ML20211Q087)
- ML20211Q088 + (ML20211Q088)
- ML20211Q090 + (ML20211Q090)
- ML20211Q092 + (ML20211Q092)
- ML20211Q094 + (ML20211Q094)
- ML20211Q095 + (ML20211Q095)
- 05000251/LER-1986-026-01, :on 861114,control Room Ventilation & Containment Vent Isolations Occurred Due to Failed Process Radiation Monitor R-11.Caused by Failed Resistor & Defective Meter in Monitor.Resistor & Meter Replaced + (ML20211Q096)
- ML20211Q097 + (ML20211Q097)
- ML20211Q098 + (ML20211Q098)
- ML20211Q099 + (ML20211Q099)
- ML20211Q100 + (ML20211Q100)
- ML20211Q101 + (ML20211Q101)
- ML20211Q102 + (ML20211Q102)
- HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With + (ML20211Q103)
- ML20211Q104 + (ML20211Q104)
- PY-CEI-NRR-0569, Monthly Operating Rept for Nov 1986 + (ML20211Q105)
- ML20211Q106 + (ML20211Q106)
- ML20211Q107 + (ML20211Q107)
- ML20211Q108 + (ML20211Q108)
- ML20211Q109 + (ML20211Q109)
- 05000335/LER-1987-001-02, :on 870123,discovered 23 Walls Needed to Be Reclassified as seismic,10 of Which Required Mods.Caused by Personnel Error.Mods Completed on Nine Walls by 870126 & on Tenth Wall During Refueling Outage + (ML20211Q110)
- ML20211Q111 + (ML20211Q111)
- ML20211Q112 + (ML20211Q112)
- ML20211Q114 + (ML20211Q114)
- ML20211Q115 + (ML20211Q115)
- ML20211Q116 + (ML20211Q116)
- ML20211Q117 + (ML20211Q117)
- IR 05000285/1986032 + (ML20211Q118)
- ML20211Q120 + (ML20211Q120)
- IR 05000443/1986047 + (ML20211Q121)
- ML20211Q122 + (ML20211Q122)
- ML20211Q123 + (ML20211Q123)
- ML20211Q124 + (ML20211Q124)
- U-603267, Monthly Operating Rept for Aug 1999 for Clinton Power Station,Unit 1.With + (ML20211Q125)