Forwards Insp Rept 50-285/86-32 on 861215-19 & Notice of Violation
ML20211Q086
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/20/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20211Q091 List:
References
TAC-64446, NUDOCS 8703030014
Download: ML20211Q086 (2)


See also: IR 05000285/1986032

Text

_ _ ._ _ _ _ _ _ _ - _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____

. . ,

FEB 2 01987

L In Reply Refer To:

Docket: 50-285/86-32

Omaha Public Power District

ATTN: R. L. Andrews, Division Manager-

-Nuclear Production

1623 Harney Street

Omaha, Nebraska 68102

Gentlemen:

This refers to the inspection conducted by Mr. R. E. Baer of this office during

the period December of activities authorized by NRC Operating

License DPR-40 for Fort 15-19, Calhoun 1986, Station, and to the discussion of our findings

. with Mr. W. G. Gates and other members of your staff at the conclusion of the

inspection.

Areas examined during the ins)ection included select portions of the radiation

protection program. Within tiese areas, the inspection consisted of selective

examination of procedures and re)resentative records, interviews with

personnel, and observations by tie NRC inspector. The inspection findings are

documented in the enclosed inspection report.

i

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accorcance with the provisions of Section 2.201

Title 10, Code of Federal

of the NRC'sYour

Regulations. " Rules

response of Practices,"

should be basePart 2,d on the specifics contained in the

Notice of Violation enclosed with this letter.

We have also examined actions you h ne taken with regard to previously

identified inspection findings. Tte status of these items is identified in

4

paragraph 2 of the enclosed report.

'

TheresponsedirectedbythisletterandtheaccompanyingNoticeisnotsubject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction act of 1980, PL 96-511.

,. n ,.

n g ,., /

RIV:FRP C:FRPS ' C:R&SPBC:p V{Q /C:RPB

REBaer:dp BMur{ay WLFisher DRifu er pdEGaoliardo

9-/7/87 /p/87 4/g/87 g/o/87

f '/[y/87

,

0703030014 070220 h/

gDR

ADOCK 0500 5

,

_..

. ,

r

. 0maha Public Power District -2-

Should you have any. questions concerning this inspection, we will be pleased to

discuss.them with you.

Sincerely,

" Original Signed by:

R. E. Hall" p

J. E. Gagliardo, Chief l

ReactorProjectsBranch

Enclosure:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-285/86-32

ccw/ enclosure:

W. G. Gates, Manager

Fort Calhoun Station

P. 0. Box 399

Fort Calhoun, Nebraska 68023

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae

1333 New Hampshire Avenue, NW

Washington, D. C. 20036

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bectoDMB(IE06)

bec distrib. by RIV:

  • RPB *RRI R.D. Martin, RA
  • R&SPB *SectionChief(RPB/B) * MIS System
  • RIV File DRSP *RSTS Operator
  • RSB *ProjectInspector *D. Weiss, RM/ALF
  • R. E. Baer *B. Murray *W. L. Fisher

R. L. Bangart

  • w/766

__ _ -