.di OPERATING DATA REPORT DOCKET NO.
50-443 DATE 12/05/86 COHPLETED BY R. Couture TELEPHONE (603) 474-9521 (Ext. 4077)
OPERATING STATUS 1.
Unit Name:
Seabrook Station Unit 1 2.
Reporting Period:
November 1986 3.
Licensed Thermal Power (MWt):
3411 4.
Nameplate Rating (Gross MWe):
1197 5.
Design Electrical Rating (Net MWe):
1148 6.
Maximum Dependable Capacity (Gross MWe):
1197 (Initial design value) 7.
Maximum Dependable Capacity (Net MWe):
1148 (Initial design value) 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
Not Applicable 9.
Power Level To Which Restricted, If Any (Net MWe):
Zero power
- 10. Reasons For Restrictions, If Any:
License issued on 10/17/86 is a zero power license which allows fuel loading and performance of non-nuclear testing.
This Month Y r. - to-Da te Cumulative
- 11. Hours In Reporting Period 720.0 1081.0 1081.0
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 0.0
- 13. Reactor Reserve ' Shutdown flours 0.0 0.0 0.0
- 14. Hours Generator On-Line 0.0 0.0 0.0
- 15. Unit Reserve Shutdown llours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 0 0
0
- 17. Gross Elec. Energy Generated (MWH) 0 0
0
- 18. Net Electrical Energy Generated (MWH) 0 0
0
- 19. Unit Service Factor 0.0 0.0 0.0
- 20. Unit Availability Factor 0.0 0.0 0.0
- 21. Unit capacity Factor (Using MDC Net) 0.0 0.0 0.0
- 22. Unit Capacity Factor (Using DER Net) 0.0 0.0 0.0
- 23. Unit Forced Ourage Rate 0.0 0.0 0.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Not Scheduled
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup: Not Applicable
- 26. Units In Test Status (Prior to Commercial Operation):
Forecas t Ac hieved INITIAL CRITICALITY
__1987 Not Applicable INITIAL ELECTRICITY 1987 Not Applicable COMMERCIAL OPERATION 1987 Not Applicable
\\\\
0703030009 061130 PDR ADOCK 05000443 p
PDR i
.m_.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-443 UNIT Seabrook 1 DATE 12/05/86 COMPLETED BY R. Couture TELEPHONE (603) 474-9521 (Ext. 4077)
MONTH NOVEMBER, 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe-Ne t)
(MWe-Ne t) i 1
0 16 0
2 0
17 0
3 0
18 0
4 0
19 0
5 0
20 0
6 0
21 0
2 7
0 22 0
8 0
23 0
9 0
24 0
}
10 0
25 0
l 11 0
26 0
j 12 0
27 0
13 0
28 0
14 0
29 0
15 0
30 0
4 INSTRUCTIONS l
On this format, list the average daily unit power level in MWe-Net for each day in tle reporting month.
Compute to the nearest w}nle megawatt.
i t
DOCKET NO.
50-443 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Seabrook 1
'j DATE 12/05/86 I
COMPLETED BY R. Couture REPORT ENTH NOVEMBER, 1986 TELEPHONE (603) 474-9521 (Ext. 4077) l Duration Reason 2 Method of Licensee Cause & Corrective 1
No. Date Type (Hours)
Shutting Event Action to Down Reactor 3 Report #
Prevent Recurrence
~
NO ENTRIES FOR THIS ENTH I
2 3
F:
Forced Reason:
Method:
S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Re fueling 3-Automatic Scram D-Regulatory Restriction 4-Continued from E-Operator Training &. License Examination
. previous month F-Administrative 5-Power Reduction G-Operational Error (Explain)
(Duration = 0)
H-Other (Explain) 9-Other (Explain)
Docket No.
50-443 Dato 12/05/86 Unit N;me Serbrook 1 Completed By R. Couture Te lephone (603) 474-9521 (Ext. 4077)
CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY REIATED EQUIPMENT Page 1 of 1 REPORT MONTH NOV EMBER, 1986 DATE SYSTEM COMPONENT MAINTENANCE ACTION 11/05/86 Main Steam MS-PY-3002-5 Torqued valve seats and replaced gaskets Solenoid valve control-to correct air leakage.
ling B SG Atmosp1wric Steam Dump Valve.
I1/05/86 Nitrogen Gas NG-FV-4610 Repaired defective solenoid operator.
Solenoid operated containment isola-tion valve.
11/10/86 Service Water SW-V-140 Dried out and relubricated motor Motor operated cooling operator to correct electrical ground.
tower Train A basin valve.
11/18/86 Solid State Train B time delay Adjusted out-of-tolerance time delay Protection relay controlling relay.
System safety injection Manual Reset capability.
Docke t No.
50-443' Date:
12/05/86 Completed By:
R. Couture Telephone:
(603) 474-9521-(Ext. 4077)
REFUELING INFORMATION REQUEST
- 1. Name of facility:
Seabrook Unit 1
- 2. Scheduled date for next refueling shutdown: Not Scheduled
- 3. Scheduled date for restart following refueling: Not Scheduled
- 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?
Unknown at this time.
- 5. Scheduled date(s) for submitting licensing action and supporting informa tion:
Not Applicable
- 6. Important licensing considerations associated with refueling, e.g.,
new or dif ferent fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
In Core:
193 (b) 0
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity:
1236 i
No increase in storage capacity requested or planned.
- 9. The projected date of the lar' refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assemblies based on sixteen refuelings and full core of fload capability.
The current licensed capacity is adequate until at leas t the year 2007.
8 George S. Thomas UI vice PropdwW Nuclear Produckm PLesc Service of New Hampshire New Hampshire Yankee Division December 8, 1986 SBN-1253 T.F. B.7.1.2 United States Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Director, Office of Resource Management
Reference:
(a) Facility Operating License No. NPF-56, Docket No. 50-443 Subj ect: Monthly Operating Report
Dear Sir:
In accordance with Technical Specification Section 6.8 1.5, enclo' sed please find Monthly Operating Report 86-11 covering the operation and shutdown experience relating to Seabrook Station Unit 1.
Very truly yours, eo
. Thomas Enclosure cc: Regional Administrator U. S. Nuclear Regulatory Commission - Region 1 631 Park Avenue King of Prussia, PA 19406
\\
P.O. Box 300. Seabrook, NH 03874. Telephone (603) 474 9574 j