Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000483/LER-1986-021, :on 860617,operations Personnel Failed to Restore Operability of Control Room HVAC Radiation Monitor within 1 H of Loss of Flow,Per Tech Spec 3.3.3.1.Monitor Filters Replaced & Personnel Counseled + (ML20211P672)
- ML20211P673 + (ML20211P673)
- BSEP-86-1685, Monthly Operating Repts for Nov 1986 + (ML20211P674)
- ML20211P675 + (ML20211P675)
- ML20211P676 + (ML20211P676)
- ML20211P677 + (ML20211P677)
- ML20211P678 + (ML20211P678)
- IR 05000289/1986021 + (ML20211P679)
- ML20211P681 + (ML20211P681)
- ML20211P684 + (ML20211P684)
- ML20211P685 + (ML20211P685)
- ML20211P686 + (ML20211P686)
- ML20211P688 + (ML20211P688)
- ML20211P690 + (ML20211P690)
- ML20211P691 + (ML20211P691)
- PY-CEI-NRR-2229, Forwards Rev 5 to PDB-F0001, COLR for Perry Nuclear Power Plant,Unit 1,Cycle 7 (Reload 6) & Rev 0 to J11-03060SRLR, Suppl Reload Licensing Rept for Perry Npp,Unit 1,Reload 6, Cycle 7 + (ML20211P692)
- ML20211P693 + (ML20211P693)
- 05000413/LER-1986-030, :on 860611,steam Generator B lo-lo Level Occurred,Causing Reactor Trip.Caused by Personnel Error. Personnel Counseled & ex-core Nuclear Instrumentation Sys Calibr at Power Revised + (ML20211P694)
- ML20211P695 + (ML20211P695)
- ML20211P697 + (ML20211P697)
- ML20211P699 + (ML20211P699)
- ML20211P700 + (ML20211P700)
- ML20211P701 + (ML20211P701)
- ML20211P702 + (ML20211P702)
- ML20211P703 + (ML20211P703)
- ML20211P705 + (ML20211P705)
- ML20211P706 + (ML20211P706)
- ML20211P707 + (ML20211P707)
- ML20211P708 + (ML20211P708)
- ML20211P709 + (ML20211P709)
- ML20211P711 + (ML20211P711)
- ML20211P712 + (ML20211P712)
- ML20211P713 + (ML20211P713)
- 05000374/LER-1986-012-06, :on 860620,electrical Termination at Inboard & Outboard MSIV Limit Switches Not Installed in Environ Qualification Tested Configuration.Caused by Deficient Installation Procedures.Procedures Revised + (ML20211P716)
- 05000416/LER-1997-004-03, :on 970911,failure to Declare Valve Inoperable During Work Having ISI Required Stroke Time Retest Occurred. Caused by Failure to Follow Work Control Process.Appropriate Personnel in Depts Involved Being Trained + (ML20211P717)
- IR 05000400/1986090 + (ML20211P718)
- ML20211P719 + (ML20211P719)
- ML20211P720 + (ML20211P720)
- ML20211P721 + (ML20211P721)
- ML20211P722 + (ML20211P722)
- ML20211P725 + (ML20211P725)
- ML20211P726 + (ML20211P726)
- ML20211P731 + (ML20211P731)
- 05000423/LER-1997-049, :on 970910,water Was Inadvertently Added to RCS While Entered Into LCO Action Statement.Caused by Inadequate Verification & Validation of Sys Configuration Prior to Conducting Pump Test.Counseled Operations Shift Personnel + (ML20211P732)
- ML20211P734 + (ML20211P734)
- ML20211P735 + (ML20211P735)
- ML20211P737 + (ML20211P737)
- ML20211P738 + (ML20211P738)
- NPL-97-0644, Submits Addl Response to Violations Noted in Insp Repts 50-266/96-18 & 50-301/96-18.Corrective Actions:Agrees W/Interpretation That Nf Boundary Extends to Bldg Surface + (ML20211P742)
- ML20211P743 + (ML20211P743)
- 05000334/LER-1997-031, :on 970919,identified That Routine Testing of Surveillance Procedures for ESF Were Inadequate.Caused by Inadequate Development of Procedures.Will Develop Addl Routine Surveillance Testing + (ML20211P746)