Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211N604 + (ML20211N604)
- ML20211N606 + (ML20211N606)
- ML20211N607 + (ML20211N607)
- ML20211N608 + (ML20211N608)
- ML20211N609 + (ML20211N609)
- ML20211N611 + (ML20211N611)
- ML20211N612 + (ML20211N612)
- ML20211N613 + (ML20211N613)
- PNO-I-86-045, on 860628,reactor Achieved Criticality.Initial Criticality Followed by Full Core Shutdown Margin Demonstration & source-range Detector Nonsaturation demonstration.Twenty-fourth Criticality Coverage Provided + (ML20211N615)
- ML20211N617 + (ML20211N617)
- ML20211N619 + (ML20211N619)
- ML20211N620 + (ML20211N620)
- ML20211N621 + (ML20211N621)
- ML20211N622 + (ML20211N622)
- ML20211N625 + (ML20211N625)
- ML20211N626 + (ML20211N626)
- ML20211N627 + (ML20211N627)
- DD-86-18, Advises That Time for Commission to Review Directors Decision DD-86-18 Expired.Commission Declined Review. Decision Became Final Agency Action on 861215.Served on 861217 + (ML20211N629)
- ML20211N630 + (ML20211N630)
- HL-5495, Forwards Copy of Renewed NPDES Permit GA0004120,issued by State of Ga Environ Protection Div + (ML20211N631)
- ML20211N632 + (ML20211N632)
- ML20211N633 + (ML20211N633)
- ML20211N636 + (ML20211N636)
- ML20211N637 + (ML20211N637)
- ML20211N640 + (ML20211N640)
- ML20211N641 + (ML20211N641)
- ML20211N642 + (ML20211N642)
- ML20211N644 + (ML20211N644)
- ML20211N645 + (ML20211N645)
- ML20211N649 + (ML20211N649)
- ML20211N650 + (ML20211N650)
- ML20211N652 + (ML20211N652)
- L-99-137, Forwards Issue 3,rev 3 to Bvps,Unit 1 Inservice Testing Program for Pumps & Valves. Encl 1 Provides Summary of IST Program Changes Which Have Been Incorporated Into Issue 3, Rev 3 + (ML20211N654)
- ML20211N655 + (ML20211N655)
- ML20211N657 + (ML20211N657)
- ML20211N659 + (ML20211N659)
- ML20211N661 + (ML20211N661)
- RBG-44217, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/97-03 on 970804-08.Corrective Actions:Counseled Radwaste Shipping Personnel for Failure to Follow Procedural Requirements + (ML20211N662)
- ML20211N663 + (ML20211N663)
- NSD-NRC-97-5368, Forwards Response to RAI Re Control Rod Insertion Assumptions in AP600 SSAR LOCA Analyses.Nrc Should Inform W of Status to Be Designated in NRC Status Column of Oits + (ML20211N664)
- ML20211N665 + (ML20211N665)
- ML20211N667 + (ML20211N667)
- ML20211N668 + (ML20211N668)
- 05000334/LER-1997-030, :on 970908,failure to Comply W/Edg TS Action Statement Was Identified.Caused by Inadequate Interpretation of Ts.Revised Procedure 3.4, Clearance Procedure to Agree W/Ts Action Statement 3.8.1.1.b + (ML20211N669)
- ML20211N671 + (ML20211N671)
- ML20211N672 + (ML20211N672)
- ML20211N673 + (ML20211N673)
- BECO-LTR-97-101, Forwards Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program, Which Incorporates post-refueling Outage 11 Changes & Plant 10CFR50 App J,Option B License Amend + (ML20211N674)
- ML20211N675 + (ML20211N675)
- ML20211N678 + (ML20211N678)
- ML20211N680 + (ML20211N680)