Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211J004 + (ML20211J004)
- PY-CEI-NRR-2224, Discusses Tornado Missile Protection at Plant.Procedural Control Change Considered to Be Regulatory Commitment + (ML20211J006)
- ML20211J007 + (ML20211J007)
- ML20211J008 + (ML20211J008)
- TXX-6089, Responds to NRC Re Violations Noted in Insp Repts 50-445/86-03 & 50-446/86-02.Corrective Actions:Design Change Authorization 18,016 Revised to Delete Specifics Re Wire Size Reduction.Engineering Evaluation Performed + (ML20211J012)
- BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution + (ML20211J013)
- ML20211J014 + (ML20211J014)
- ML20211J016 + (ML20211J016)
- ML20211J019 + (ML20211J019)
- ML20211J021 + (ML20211J021)
- ML20211J022 + (ML20211J022)
- ML20211J023 + (ML20211J023)
- ML20211J025 + (ML20211J025)
- BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp + (ML20211J026)
- ML20211J031 + (ML20211J031)
- ML20211J032 + (ML20211J032)
- ML20211J036 + (ML20211J036)
- ML20211J037 + (ML20211J037)
- ML20211J038 + (ML20211J038)
- ML20211J040 + (ML20211J040)
- ML20211J041 + (ML20211J041)
- ML20211J043 + (ML20211J043)
- ML20211J044 + (ML20211J044)
- 05000206/LER-1999-001, Forwards LER 99-001-00 for Occurrence Re Unattended Security Weapon Inside Protected Area.Single Rept for Unit 1 Is Being Submitted,Iaw NUREG-1022,Rev 1,since Condition Involves Shared Sys & Is Applicable to Units 1,2 & 3 + (ML20211J045)
- U-600750, Final Deficiency Rept 55-86-05 Re Unsealed Gaps in 3 H Rated Fire Wall.Initially Reported on 860717.Maint Standing Orders 23 & 25 Issued to Identify Mechanism for Proper Control of Fire Seals & to Eliminate Future Seal Violations + (ML20211J048)
- ML20211J049 + (ML20211J049)
- ML20211J052 + (ML20211J052)
- ML20211J053 + (ML20211J053)
- 05000206/LER-1999-001-02, :on 990808,unattended Security Weapon Was Discovered Inside Pa.Caused by Posted Security Officer Falling Asleep.Officer Was Relieved of Duties,Pa Access Was Removed & Officer Was Placed on Investigatory Suspension + (ML20211J054)
- ML20211J056 + (ML20211J056)
- ML20211J060 + (ML20211J060)
- ML20211J061 + (ML20211J061)
- ML20211J062 + (ML20211J062)
- ML20211J063 + (ML20211J063)
- ML20211J065 + (ML20211J065)
- ML20211J066 + (ML20211J066)
- ML20211J068 + (ML20211J068)
- L-86-130, Advises That Inservice Insp Summary Rept Will Not Be Completed by Required Schedule.Three back-to-back Refueling Outages & Upcoming Outage Have Diverted Manpower to outage- Related Activities.Rept Will Be Forwarded by 860430 + (ML20211J071)
- ML20211J072 + (ML20211J072)
- ML20211J074 + (ML20211J074)
- ML20211J075 + (ML20211J075)
- 05000289/LER-1997-003-01, Forwards LER 97-003-01 Re Potential Overpressurization of Makeup Pump Suction Piping,Due to Inadequate Test & Operating Procedures + (ML20211J077)
- ML20211J078 + (ML20211J078)
- ML20211J079 + (ML20211J079)
- ML20211J082 + (ML20211J082)
- ML20211J083 + (ML20211J083)
- 05000395/LER-1999-010, :on 990730,discovered That UHS Dependent Components Were Potentially Outside Design Basis of Plant. Caused Indeterminate.Blank Flanges Were Subsequently Not Reinstalled.With + (ML20211J085)
- ML20211J088 + (ML20211J088)
- JPN-99-028, Informs That Util Requires Extension from 990901 to 1015,to Complete Review of Rvid & Forward Comments to Nrc,Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity + (ML20211J089)
- ML20211J091 + (ML20211J091)
- ML20211J095 + (ML20211J095)