Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000220/LER-1999-004-01, :on 990723,reactor Scram Was Noted.Caused by Mechanical Pressure Regulator Suppressor Valve Failure. Cleaned Pressure Suppressor Valve & Provided Guidance for Valve Disassembly & Insp.With + (ML20211F319)
- 05000445/LER-1997-007, :on 970820,post-work Testing for Containment Isolation Valve Was Not Performed After Maint.Caused by Incorrect Belief That Work Did Not Involve Replacement. Tested Valve IAW TS Requirements + (ML20211F320)
- ML20211F321 + (ML20211F321)
- ML20211F326 + (ML20211F326)
- ML20211F329 + (ML20211F329)
- 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 + (ML20211F331)
- ML20211F332 + (ML20211F332)
- ML20211F335 + (ML20211F335)
- ML20211F337 + (ML20211F337)
- ML20211F342 + (ML20211F342)
- ML20211F343 + (ML20211F343)
- ML20211F344 + (ML20211F344)
- ML20211F345 + (ML20211F345)
- ML20211F348 + (ML20211F348)
- SVP-97-197, Responds to NRC Re Violations Noted in Insp Repts 50-254/97-11 & 50-265/97-11.Corrective actions:1B RHR Gate Was Continually Attended Until Reactor Bldg Basement Was Released from LHRA Status + (ML20211F350)
- 05000424/LER-1997-006-02, :on 970830,H Monitoring Sys Train Was Rendered Inoperable.Caused by Personnel Error.Reviewed Tests Conducted During Period of Time Involved + (ML20211F355)
- ML20211F356 + (ML20211F356)
- ML20211F358 + (ML20211F358)
- ML20211F359 + (ML20211F359)
- IR 05000309/1986020 + (ML20211F360)
- ML20211F363 + (ML20211F363)
- ML20211F365 + (ML20211F365)
- ML20211F367 + (ML20211F367)
- ML20211F369 + (ML20211F369)
- ML20211F370 + (ML20211F370)
- ML20211F371 + (ML20211F371)
- ML20211F372 + (ML20211F372)
- ML20211F375 + (ML20211F375)
- ML20211F377 + (ML20211F377)
- ML20211F378 + (ML20211F378)
- ML20211F379 + (ML20211F379)
- ML20211F380 + (ML20211F380)
- ML20211F381 + (ML20211F381)
- ML20211F382 + (ML20211F382)
- ML20211F384 + (ML20211F384)
- ML20211F385 + (ML20211F385)
- BVY-99-105, Supplemental Application for Amend to License DPR-28, Correcting Typographical Error & Clarifying Certain Changes to Requirements for High Pressure Core Cooling Sys Contained in TS + (ML20211F386)
- ML20211F387 + (ML20211F387)
- ML20211F388 + (ML20211F388)
- ML20211F391 + (ML20211F391)
- ML20211F392 + (ML20211F392)
- ML20211F395 + (ML20211F395)
- ML20211F396 + (ML20211F396)
- ML20211F397 + (ML20211F397)
- ML20211F398 + (ML20211F398)
- ML20211F400 + (ML20211F400)
- ML20211F404 + (ML20211F404)
- ML20211F405 + (ML20211F405)
- ML20211F406 + (ML20211F406)
- ML20211F407 + (ML20211F407)
- ML20211F408 + (ML20211F408)