Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211A977 + (ML20211A977)
- ML20211A978 + (ML20211A978)
- ML20211A979 + (ML20211A979)
- ML20211A982 + (ML20211A982)
- ML20211A983 + (ML20211A983)
- ML20211A984 + (ML20211A984)
- ML20211A986 + (ML20211A986)
- ML20211A988 + (ML20211A988)
- 05000249/LER-1986-010-05, :on 860422,cribhouse Deluge Sys 2/3 Taken Out of Svc to Complete Portion of App R Mod Work.Testing Completed on 860503.Sys Placed in Svc on 860507 After Readjustment of Deluge Valve + (ML20211A990)
- ML20211A991 + (ML20211A991)
- 05000458/LER-1987-002, :on 870112,reactor Shutdown Initiated for Unidentified Drywell Leakage Exceeding 5 Gpm.Caused by Packing Leaks on Several Valves W/Rhr B Testable Injection Check Valve as Primary Contributer + (ML20211A992)
- ML20211A994 + (ML20211A994)
- RBG-35407, Special Rept:In Jan 1987,quarterly Rept Showed Marker 34 Settlement in Excess of Predicted Value.Cause Attributed to Assumptions in Effect of Const Schedule on Structural Settlement.Normal Survey Frequency Remains in Effect + (ML20211A996)
- ML20211A997 + (ML20211A997)
- ML20211A998 + (ML20211A998)
- ML20211B000 + (ML20211B000)
- ML20211B001 + (ML20211B001)
- ML20211B003 + (ML20211B003)
- ML20211B006 + (ML20211B006)
- ML20211B007 + (ML20211B007)
- 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 + (ML20211B009)
- ML20211B010 + (ML20211B010)
- ML20211B011 + (ML20211B011)
- ML20211B012 + (ML20211B012)
- ML20211B015 + (ML20211B015)
- ML20211B016 + (ML20211B016)
- B12396, Forwards Probabilistic Risk Analysis of Events Caused by Internal Flooding,Per 860731 Commitment.Analysis Identifies & Evaluates Consequences of Postulated Accidents Due to Internal Flooding.Insights Gained Listed + (ML20211B017)
- ML20211B019 + (ML20211B019)
- ML20211B020 + (ML20211B020)
- 05000327/LER-1986-043, :on 860910,Surveillance Instruction (SI)-156 for Surveillance Requirement 4.6.1.2 Did Not Provide for Venting of Three Containment Isolation Valves During Testing.Caused by Inadequate Review + (ML20211B022)
- ML20211B023 + (ML20211B023)
- ML20211B024 + (ML20211B024)
- ML20211B025 + (ML20211B025)
- ML20211B026 + (ML20211B026)
- ML20211B027 + (ML20211B027)
- ML20211B028 + (ML20211B028)
- ML20211B029 + (ML20211B029)
- ML20211B030 + (ML20211B030)
- ML20211B033 + (ML20211B033)
- ML20211B037 + (ML20211B037)
- ML20211B038 + (ML20211B038)
- 05000286/LER-1986-008-01, :on 860829,field Insp Identified Absence of Heat Shrink Tubing at Connection of Coaxial Cable of Containment high-range Radiation Monitors R25 & R26.Heat Shrinkable Tubing Installed + (ML20211B041)
- ML20211B043 + (ML20211B043)
- ML20211B045 + (ML20211B045)
- ML20211B046 + (ML20211B046)
- 05000321/LER-1986-021, :on 860501,full Reactor Protection Sys Logic Actuation Occurred,Causing Scram Discharge Vol Header to Fill.Caused by Broken Molded Bakelite Actuating Lever of Channel Scram Relay.Relay Replaced + (ML20211B047)
- ML20211B051 + (ML20211B051)
- ML20211B052 + (ML20211B052)
- ML20211B054 + (ML20211B054)
- ML20211B056 + (ML20211B056)
- ML20211B058 + (ML20211B058)